Emergency handling procedure during Bole waler & Sear
ually parameter abnormal
ao aa Roca?
ovis | Baie Page no. [Dias af Ghana Feason or
ie Sere
aa aT TRE
Descpion ame | Dengnaton | signature | oa
|
Praparotty | Sarfey Sharma see AL loaitall.
Reviewes by \VHiwarkheskar | TRAINING ~° | ehoteac
toned cowctes| —srosioee | orseraser| 255
: 2 saen| LIF pnyau|
rroved bj ‘M.Lebaia. OPS- Manat )
Approved by Manager ARM. {isan
‘Aeproves by Hipatse: | pran oanager dil ee
° Gl
Emageny healing pocereNoDate
EPCIOPNBTGIEMERGIOO | Orize0e16 | Oar
Emergency handing procedure during Baer water & steam
ually parameter abner
stea MORUPULE — B POWER STATION (BOTSWANA)
Gee Gases Tsoue | Revision No/Date 4g
1.0 PURPOSE
‘This emersency handing procedure is intended a envi guidlines and instructions during
Boller water & steam atrormal qual,
‘This document i not intended to replace operators judgment. Inseac, they ae intended to
Provide criteria and procedures that should be considered fr Incorporation into al evel of
operations.
20ScoPE
‘This procedure is appicabl to Boller water and steam cycle of Unie, 2,3 and 4
3.0 RESPONSIBILITY
2.1 Operation Manager: Ensures the avallbilty of procedure and is being fallowed aecorsngly.
2.2Shift in Charge: Guces and montor the procedure
3.3Shit Chemist: Provides input ana asses in controling the parameters
S.4UCE and CRE: Executes the instructors and folow he procedure.
40 PROCEDURE
41 PROBABLE CAUSES
4.141 Make up water quality out of iis,
4412 System taken in service after overhauling long outage,
413 Internal contamiraton of water c steam pipe ater repair.
414 Dosing tine may be leaking / chocked
4.5 Nhs or Nt dosing concentration may be pocrow or too high
418 HP dosing pump net developing te rated pressure.
Emagen handing prose Page 206NoDate
‘stear MORUPULE ~ B POWER STATION (BOTSWANA)
‘Document No, ‘ssue | Revision NovDate 4
‘SPCIOPNSTEEMERGIOO’ | Oiv2a0aTS | OaaTOTe
Tile
‘Emergency Handling procedure daring Gover water sloam
‘iy 22rameter abnormal,
422
423
424
425
4a
434
432
433
PLANT RESPONSEIEFFECIS:
Boiler water & steam qualty parameters wil vary (@9. high slica content, pH and
conductivity out tims.
Deterioration of magnette layer, intemal tube corresion wil start chances of tube
leakage if operaied for long period.
Chances of sat ceposion on turbine blades, unbalance and turbine shaft vibration may
Loss of ang ter efflency on turbine and bol.
Los of equipment baler and tutine Ife
PARAMETERS OF CONCERN
DM water para eters. Seo Table 1
Boller wator & steam parameters. See Table 1
Condensate water parameters. See Table 1.
Emery handing proetue PopoaersB POWER STATION (BOTSWANA)
CAG MOS ames fave [Renennova
Nobate
BPCOPNTBTEEWERGIOOT | O128/08/16 | OoDSrOTe
i iigenay handing procedure during Soler water & seam
quay garameter abnormal
Place of measurement | Parameter [UO its
ndowate aH ae-a7
Consort Cond Wa_[— <7
ri aa-02
Deaesator Cond wea_[— <7
Doi vg [ra
Fi 30-97
Cond Bea io
Economie it “ pee | 08-10
SiGe BB =a
He 2 0
Fee 8 =.
Fa 35-108
Sond iSin_|[— <0
Soler dun Water SiO, spo | —saas
Font Es <0
Pe gon | 0-88)
fa 85205
parnstec team Zoned wa <70
Superhestec slam Left [So 0b a
Na Boe =
ott 35-95
Sprain star int | —Serd——_| Safer.
Na 500 =
ott 35-95
« Zone wa <0
Saturated steam Leh Sie ae
8 a0
35-05
‘Saturated olsom Right usfem By
20 0
38 =
“Table 1. Weter ana Steam Cycle rterence parameters
emergeneynanetrg procera
PogoacisMORUPULE-8
Steg Me ee MER STATON eo Ae
NoDate
SPCIGPRETGEMERGTOO' | Ovzeioalis | — oaioerOTe
Tile ‘Emergency handing procedure during Hover water & steam
‘ally parameter absormal
AA OPERATOR ACTION.
44:1 Inform immediatly the shiftin charge
442 Ask chemist to confi panel readings & chemical dosing,
442 If Sica value is out of int (according Silica vs Drum Pressure curve) reduce the load &
boler pressure tlow the imi, refer to table 2
444 Ifthe dissolved oxygen contert fs high, venfy oxygen scavenger lineup ard pump
stroke, and insfect the opening of feed wale tank vents, Inspec all dosing lines &
osing pumps.
445 If steam qualty do not improve alter taking corrective actions prescribed by water
chemisty department and operation management guidance, operation manager shall
take the decisen whether to shut dawn the unit or continue running under special
condos,
Eegeneynsaing ocnare PagesMORUPULE — B POWER STATION (BOTSWANA)
Document No. issue | Revision NoWate
NofDate
BPCRPNBTSEMERGIONT | Dr2a0a76 | OuDETarE
inargenoy handing prosedute durng Boiler water & sear
ai pusou/ oan
sei ee ie glee aan aft
Steet er terteteetitterti
fetes tie teste teeter ee
cteetertes te testetesteteetertes
“aie? Domrese vs STea
ener moves