You are on page 1of 6
steag Prete? Tesue | Revision NovDate NoDate MORUPULE - B POWER STATION (BOTSWANA) L ‘BPCIOPNIETGIEMERGIODI ‘res!08016 ‘oDSrOTE Emergency handling procedure during Bole waler & Sear ually parameter abnormal ao aa Roca? ovis | Baie Page no. [Dias af Ghana Feason or ie Sere aa aT TRE Descpion ame | Dengnaton | signature | oa | Praparotty | Sarfey Sharma see AL loaitall. Reviewes by \VHiwarkheskar | TRAINING ~° | ehoteac toned cowctes| —srosioee | orseraser| 255 : 2 saen| LIF pnyau| rroved bj ‘M.Lebaia. OPS- Manat ) Approved by Manager ARM. {isan ‘Aeproves by Hipatse: | pran oanager dil ee ° Gl Emageny healing pocere NoDate EPCIOPNBTGIEMERGIOO | Orize0e16 | Oar Emergency handing procedure during Baer water & steam ually parameter abner stea MORUPULE — B POWER STATION (BOTSWANA) Gee Gases Tsoue | Revision No/Date 4g 1.0 PURPOSE ‘This emersency handing procedure is intended a envi guidlines and instructions during Boller water & steam atrormal qual, ‘This document i not intended to replace operators judgment. Inseac, they ae intended to Provide criteria and procedures that should be considered fr Incorporation into al evel of operations. 20ScoPE ‘This procedure is appicabl to Boller water and steam cycle of Unie, 2,3 and 4 3.0 RESPONSIBILITY 2.1 Operation Manager: Ensures the avallbilty of procedure and is being fallowed aecorsngly. 2.2Shift in Charge: Guces and montor the procedure 3.3Shit Chemist: Provides input ana asses in controling the parameters S.4UCE and CRE: Executes the instructors and folow he procedure. 40 PROCEDURE 41 PROBABLE CAUSES 4.141 Make up water quality out of iis, 4412 System taken in service after overhauling long outage, 413 Internal contamiraton of water c steam pipe ater repair. 414 Dosing tine may be leaking / chocked 4.5 Nhs or Nt dosing concentration may be pocrow or too high 418 HP dosing pump net developing te rated pressure. Emagen handing prose Page 206 NoDate ‘stear MORUPULE ~ B POWER STATION (BOTSWANA) ‘Document No, ‘ssue | Revision NovDate 4 ‘SPCIOPNSTEEMERGIOO’ | Oiv2a0aTS | OaaTOTe Tile ‘Emergency Handling procedure daring Gover water sloam ‘iy 22rameter abnormal, 422 423 424 425 4a 434 432 433 PLANT RESPONSEIEFFECIS: Boiler water & steam qualty parameters wil vary (@9. high slica content, pH and conductivity out tims. Deterioration of magnette layer, intemal tube corresion wil start chances of tube leakage if operaied for long period. Chances of sat ceposion on turbine blades, unbalance and turbine shaft vibration may Loss of ang ter efflency on turbine and bol. Los of equipment baler and tutine Ife PARAMETERS OF CONCERN DM water para eters. Seo Table 1 Boller wator & steam parameters. See Table 1 Condensate water parameters. See Table 1. Emery handing proetue Popoaers B POWER STATION (BOTSWANA) CAG MOS ames fave [Renennova Nobate BPCOPNTBTEEWERGIOOT | O128/08/16 | OoDSrOTe i iigenay handing procedure during Soler water & seam quay garameter abnormal Place of measurement | Parameter [UO its ndowate aH ae-a7 Consort Cond Wa_[— <7 ri aa-02 Deaesator Cond wea_[— <7 Doi vg [ra Fi 30-97 Cond Bea io Economie it “ pee | 08-10 SiGe BB =a He 2 0 Fee 8 =. Fa 35-108 Sond iSin_|[— <0 Soler dun Water SiO, spo | —saas Font Es <0 Pe gon | 0-88) fa 85205 parnstec team Zoned wa <70 Superhestec slam Left [So 0b a Na Boe = ott 35-95 Sprain star int | —Serd——_| Safer. Na 500 = ott 35-95 « Zone wa <0 Saturated steam Leh Sie ae 8 a0 35-05 ‘Saturated olsom Right usfem By 20 0 38 = “Table 1. Weter ana Steam Cycle rterence parameters emergeneynanetrg procera Pogoacis MORUPULE-8 Steg Me ee MER STATON eo Ae NoDate SPCIGPRETGEMERGTOO' | Ovzeioalis | — oaioerOTe Tile ‘Emergency handing procedure during Hover water & steam ‘ally parameter absormal AA OPERATOR ACTION. 44:1 Inform immediatly the shiftin charge 442 Ask chemist to confi panel readings & chemical dosing, 442 If Sica value is out of int (according Silica vs Drum Pressure curve) reduce the load & boler pressure tlow the imi, refer to table 2 444 Ifthe dissolved oxygen contert fs high, venfy oxygen scavenger lineup ard pump stroke, and insfect the opening of feed wale tank vents, Inspec all dosing lines & osing pumps. 445 If steam qualty do not improve alter taking corrective actions prescribed by water chemisty department and operation management guidance, operation manager shall take the decisen whether to shut dawn the unit or continue running under special condos, Eegeneynsaing ocnare Pages MORUPULE — B POWER STATION (BOTSWANA) Document No. issue | Revision NoWate NofDate BPCRPNBTSEMERGIONT | Dr2a0a76 | OuDETarE inargenoy handing prosedute durng Boiler water & sear ai pusou/ oan sei ee ie glee aan aft Steet er terteteetitterti fetes tie teste teeter ee cteetertes te testetesteteetertes “aie? Domrese vs STea ener moves

You might also like