COPL VA
1 JACKET (REPAIR) SATISFACTORY WORKING
REPORT ;
Date: 25 /o//o.0.
| herewith, state that on this day the Jacket assembled on vessel outside
is prepared as per pre-designed & its hydro test undertaken with water
is found to be O.K. Furthermore, its safety is also taken thorough care by |
laying out extra by-pass line along with steam trap & strainer used in |
addition to necessary installing safety valve at both ends with 3KH
Pressure setting. We have taken trial into it and found its results
satisfactory & up to expectation such that around 2.5KG steam into it can
be flown for vessel external heating.
Comment (ifany)- py.q
sak
Jitendra Bhai
Vishnu Bhai