CONSTRUCTION OF HOUSE
Submitted to:
Submitted by:
Mr Sumit Kumar,
Aarushi Susovita
Asst professor,
Bft/16/597
NIFT Bhubaneswar
Project Description
Recently our company signed a contract of construction of house in Bahria town phase 8 with
Mr Ali. Mr Ali Hamza. He floats a tender about the new house construction with specify the
requirements. And choose our company for this project because we provide a reliable house
at reasonable cost. The duration decided for this project is one year with basement, ground
floor and first floor. And the cost for this project is 14,365,047.All this description is written
in the contract and both of the parties signed this agreement.
Duration
Estimated Budget
In this project keeping all expenses in mind I can say that the estimated budget require
for this project is 15,254,350.
Procurement plan
All the material mentioned in the cost plan is going to procure from different suppliers
at given cost. And this material will purchase before 1st May.
2. Enterprise environmental factors:
Environmental factors which may influence this project are
Organization Culture
Work hour
Holidays
Internal factors like labour strike, shortage of material, unavailability of man
power, etc.
External factors like load shedding, public strike against any event, political
factors, inflation etc.
1
.
Triple constraint
The triple constraint consists of time, scope and cost. The objective of this project is
to achieve the triple constraint.
Our 1st focus in this project is to complete the construction within one year as
mentioned in the contract. For this purpose we construct a table and distribute our
project phases in different months.
The 2nd focus is to achieve the target with in given budget and for this purpose the
cost for different material is already estimated so that we would not exceed from the
given budget. The estimated budget is 14,365,047 and in these 14,365,047 all
procurement will done in future for the 1 canal house with basement, ground and 1 st
floor.
The 3rd important factor in this project is scope identification. Scope of this
project is to construct house with in given time and budget. Scope tells about the
requirement of the project. Like in our project different dimensions is mention in
scope statement for example,
Number of rooms 15
Number of kitchens 3
Number of bath rooms 12
Loan 1
Terrace 1
Garage 1
Other than this information the time taken to complete these is also mention in the
scope statement. We will try to not exceed from our scope and finishing the project
within the time and costing limit.
Estimate Activity Resource
Estimate Activity Resources is the process of estimating the type and quantities of
material, people, equipment, or supplies required to perform each activity.
Outputs
2
Software resources Software resources are required to make the design of house.
Organizational process asset Organizational process assets contains organization’s
policies, templates, standards and help data for the guidance
of team members so that they can perform the project
processes more efficiently and with better utilization of time
and monetary resources.
1.Human Resource
Project team Labour
2.Transportation
Labour Material Transportation
Activity Duration
Estimate(days)
3
Performing feasibility analysis. 1
Identifying stakeholders. 1
Collecting requirements. 1
Project Costing. 2
Project Budgeting. 1
Scheduling. 1
Work Cost
Develop Schedule (By Gantt
chart method)
Develop Schedule is the process
Pluming material "Rs794,000.00" of analysing activity sequences,
durations, resource requirements,
Concrete rods "Rs316,000.00" and schedule constraints to create
the project schedule.
Paint "Rs420,000.00"
Output
Flooring material "Rs3,030,500.00"
Project schedule
Electrical equipment "Rs2,328,892.00"
Main tasks Deadlines
Foundation
Glass windows "Rs32,500.00"30 April
Ground 30 June
Basement
Wood 30 July
"Rs2,086,288.00"
Ground floor 25 Sep
1st floor
Cement 25 Nov
"Rs1,086,200.00"
Bricks "Rs1,673,500.00"
Human 187,020
4
Reserve 100,000
Procurement Process:
By using CPM AND PERT:-
The whole procurement process is under the authority of the Project manager and also he has
the responsibility for the sales and the material selection.
5
tiles