SPLICING FOR ENGINEERS.

01

• BEAUTIFUL SCENERY –
BUT HOW LONG WILL
IT TAKE FOR THE
SPLICE TEAM TO
RETURN IF THE BELT
SPLICE ON A CRITICAL
CONVEYOR FAILS AND
THE COST ???!!
THIS SERIES OF OVERHEADS IS BASED ON A PAPER PRESENTED AT ICOMS 2001
CONFERENCE MELBOURNE AUSTRALIA “CONVEYOR BELT SPLICING FOR
ENGINEERS. ART OR SCIENCE?” BY D M ELLIS of DELMEC AUSTRALIA Pty Ltd
TECHNICAL CONSULTANT TO BRIDGESTONE CORPORATION (CONVEYOR
BELTING) IN AUSTRALIA
SPLICING FOR ENGINEERS. 02

• HEAD PULLEY
DISCHARGE OF
A CRITICAL
STOCKPILE
CONVEYOR.
SPLICING FOR ENGINEERS. 03

• WHEN THIS
BELT
FAILS….
…………
SPLICING FOR ENGINEERS. 04

¾ This splice will not last


much longer !!!

• (See next slide for


Analysis.)
SPLICING FOR ENGINEERS. 05
SPLICING
SplicingFOR ENGINEERS. 06
for Supervisors

FOUR CRITICAL FACTORS NECESSARY FOR


QUALITY SPLICING
¾KNOWLEDGE OF RUBBER PROPERTIES
¾ENVIRONMENT AWARENESS
¾WORKMEN & EQUIPMENT QA CHECKS
¾SPLICE PROCEEDURES, DATA & RECORDS
SPLICING FOR ENGINEERS. 07
SPLICING FOR ENGINEERS. 08

AMBIENT CONDITIONS

• SOME SITES ARE


GREAT, WITH
INBUILT WEATHER
PROTECTION – ONCE
THE BELT IS INSIDE.
SPLICING FOR ENGINEERS. 09

AMBIENT CONDITIONS
¾ Splice preparation area using
a specially prepared
Container with end doors,
lights, ventilation, power
supply.

Kimberleys (WA) Underground conveyors up stope to ground level


stockpile. Hot, Dusty & Remote ( above ground) Humid, confined
access and dark. (Underground)
SPLICING FOR ENGINEERS. 10

ENVIRONMENT

¾ Prefabricated cover
erected around conveyor

•Hunter Valley, Overland conveyor Installation.


(raining, cold and humid)
SPLICING FOR ENGINEERS. 11

• WORKING INSIDE
THE PREPARED
TEMPORARY COVER.
CHECK:
• Ventilation
• Sloped roof
• Access all round
• Work table over bottom
half of Vulcaniser.
SPLICING FOR ENGINEERS. 12

¾ Splicing is hard physical,


skilled work requiring
non stop effort in often
difficult conditions
SPLICING FOR ENGINEERS. 13

• SPLICING IS HARD,
DANGEROUS AND
SKILLFULL WORK

• ENSURE THAT
WORKMEN WEAR
APPROPRIATE
SAFETY CLOTHES
SPLICING FOR ENGINEERS. 14
SPLICING FOR ENGINEERS. 15

¾ Splice diagram for


Fabric Belt listing splice
kit components
SPLICING FOR ENGINEERS. 16

¾Splice diagram for Steel Cord Belt listing splice kit


components and lay-up
SPLICING FOR ENGINEERS. 17

¾ Supervision is critical
SPLICING FOR ENGINEERS. 18

• DO NOT BURY YOUR


HEAD IN THE SAND.
GET OUT THERE
AND SEE THAT THE
PROCESS IS CARRIED
OUT CORRECTLY –
CHECK TIME ,
PRESSURE &
TEMPERATURE
CONTINUOUSLY
SPLICING FOR ENGINEERS. 19
EQUIPMENT & DATA CRITICAL ITEMS
CHECKS ‰EXPERIENCED TEAM
‰ PRESS EQUIPMENT (DATE ‰WORKMANSHIP TESTS
CHECKED) ‰AMBIENT CONDITIONS
‰ PUMPS, CONNECTIONS ‰TEMPERATURE
‰ SPLICE MATERIAL HAS BEEN ‰HUMIDITY
STORED CORRECTLY ‰DUST
‰ CONTROLLER CHECKED ‰MOISTURE
‰ RECORDING INSTRUMENTS ‰COVERED WORK AREA
‰ LOG BOOKS ‰CURING TEMPERATURE

‰ QA LIST CHECK ‰CURING PRESSURE


‰RECORDING INSTRUMENT
‰ SPLICE DESIGN FOR THE BELT
‰DOCUMENTATION.
‰ SPLICE CURING DATA
‰SIGN OFF
SPLICING FOR ENGINEERS. 20

PREPARATION:LAY OUT.

¾ Setting Out for the splice


& checking for Centre
Line.
SPLICING FOR ENGINEERS. 21

Vulcaniser in place all


connections made and
set to GO.

¾ Turn ON and note the


TIME
SPLICING FOR ENGINEERS. 22

¾ ALL CORNERS MUST


BE DRIED OUT
THOROUGHLY
SPLICING FOR ENGINEERS. 23

¾ Thermocouples
¾ Temperature recording
¾ Record Log
SPLICING FOR ENGINEERS. 24

• Pressure OK
• Curing Temp. reached
• Record temps @ 5 min
• Within set tolerance
• Time completed.
• Turn OFF – cool down
• Open at set Temp.
SPLICING FOR ENGINEERS. 25

• A BLACK STRIP
WITH A “BUBBLE”

• A MINUTE LATER &


YOU WOULD NEVER
HAVE KNOWN
SPLICING FOR ENGINEERS. 26

¾Close inspection is
ABSOLUTLEY
essential
SPLICING FOR ENGINEERS. 27

INSPECTION

¾ 1. Buffing across belt

¾ 2. Close examination
reveals unsatisfactory
joint which will catch
belt cleaner blades
SPLICING FOR ENGINEERS. 28

FINAL INSPECTION

¾ TEST RUN THE


CONVEYOR TO
CHECK SPLICE
ALIGNMENT
SPLICING FOR ENGINEERS. 29

CRITICAL ACTION!!
ENSURE THAT THE
DOCUMENTATION IS
“SIGNED OFF” AND
THAT ALL DATA IS
AVAILABLE FOR
CLIENT’S RECORDS