Section 1:
Yes No Comments/Actions Reference
Management Responsibility (Corporate/ Project Management)
1 Policies
How do the Policies communicated to all staff ?
How well are the staff aware of Quality Policies?
2 Project Objectives and targets
Have project objectives and KPI's been established?
Are Objectives SMART (Specific, Measureable, Achievable, Realistics and Time
bond) ?
Are set objectives & KPI's communicated to staff?
Which methods to be deployed to achieve set objectives & targets?
How are objectives and KPI's targets monitored and achieved ?
Are Objectives & KPI's reviewed at planned intervals?
3 Levels of Authority Matrix
Has project Levels of Authority Matrix been prepared, approved and distributed to
concerned personnel?
Is the Project Levels of Authority Matrix approved by Project Director?
Is the project Levels of Authority Matrix kept up to date?
Do the signatures on sample documents in line with the respective authority
stated in the approved Level of Authority Matrix?
4 Organisation chart & Job Description
Is Project Organisation Chart established and kept up-to-date? ? Is revision
clearly stated in the Org Chart?
Is the Org Chart signed off by Project Director?
How is organisation chart communicated to all staff?
Do all project staff have a Job Desciption?
Do JD's reflect the current job profile of staff?
Are designations in the JD's reflected in the Organisation Chart?
5 Management Representative & QA resources
Do Project have a Management Representative responsible for the development
and improvement of the Project QMS?
Does Management Representative have appropriate experience & knowledge
about Quality Management Systems?
Are QA/QC auditors/ Inspectors qualified to conduct audit/ inspection?
6 Top Management Commitment
How does Top Management demonstrate their commitment towards implementing
project QMS
Does project Top Management attend the Project Management Review Meeting?
Are Key Performance Indicator’s (KPI’s) for a project identified and monitored?
How often are Progress measurements undertaken for all works in progress?
Page 1 of 8
Section 3:
Yes No Comments/Actions Reference
Documentation (Document Administration & IT)
1 Document Management
Are As-built documents identified at the beginning of project as per contractual
requirements and properly stored and controlled at proper location?
Section 4:
Yes No Comments/Actions Reference
Engineering
1 Engineering Management
Is the been documented and approved?
Does the detail the specific requirements associated with the Project?
Does the detail the Engineering activities that are required to support the
Construction of the project?
Are parties responsible for providing the Construction Support are identified (i.e.
Internal Engineering resources and external consultant resources?
Page 2 of 8
2 Consultant
Does the Engineering Design Responsibility Matrix / Schedule developed and
approved?
Is the Engineering Coordinator assigned to the works with a Lead Consultant?
Page 3 of 8
6 Engineering Drawings
Which software is used to generate Engineering drawings? (CAD)
Is the software validated? And how often?
Is ‘As-Built’ recorded in the Revision History Box for all As Built drawings?
Is final drawings signed off by consultants, vendors, manufacturers or specialist
contractors from whom the drawing is generated?
7 Design Review & Verification
Do consultant/ Subcontractors conduct design review? Do they submit design
review documents as verification that the internal review has been conducted and
that the Client’s requirements are met?
Are The Consultants, Sub-Contractors or Vendors representatives sign on the
review documents?
How is deviation from Clients requirements captured and managed?
Is Deviation Request Register maintained?
Have The Internal Design Review (IDR)frequency been determined by the project
Design Coordinator?
Is a matrix developed detailing all those who will participate in the IDR Process?
Are requirements for a Third Party review of the Engineering Design detailed?
Are Supplier Meeting conducted on a regular basis and MOM is prepared to track
the status of identified issues?
11 As-Built Drawings
Is the ‘As-Built’ documentation list prepared and approved by Design
Coordinator?
How is the ‘As-Built’ documentation list communicated to the Consultants,
Subcontractors, Vendors, Manufacturers and Project staff?
Is the as-built drawings submission schedule monitored and tracked?
Are the Information in DCR incorporated in As-built drawings?
Is the progress of the ‘As-Built’ documentation reported in the Monthly Report?
Page 4 of 8
Section 5:
Yes No Comments/Actions Reference
Operations
1 Project Start Up
Was the Project Start-up Meeting conducted and MOM prepared?
Were the project Start-up activities planned properly?
2 Inspection, Measuring and Testing equipment
Is the Schedule of Equipment Calibration Requirements maintained?
Is each calibrated equipment identified by a unique number?
Are all calibrated testing, inspection and measuring equipment tracked by
registering
Are testing,ininspection
Calibrationand
Register?
measuring equipment calibrated as per
requirements/
Are Calibrationplanned?
Certificates displayed near the equipment?
Are the third party carried out the calibration qualified and authorised ?
4 Statutory and regulatory Authorities
Is an Authority Coordinator appointed to assist in interfaces with the Statutory
and Regulatory Authorities?
Is the project list of all applicable Statutory and Regulatory authorities and
contact points established and maintained?
Are any changes to legislation or regulations notified to Project Director and
concerned staff on time?
Is The nature, significance and impact of approvals by each Authority clearly
identified in notified Project Director?
Are All approval conditions relating to services, community and environmental
matters listed, monitored and their status regularly assessed and reported?
Are all occurrences, meetings, requirements, etc. related to statutory are
maintained and distributed regularly to all parties involved?
Are existing services are identified and on-site location verified before any project
activity commences?
Are the relocation of all services discussed and agreed with the relevant Authority
and the Client?
Are progress of approvals and inspection results tracked and notified to Project
Director & Concerned staff?
6 Project Completion Planning
Is the Project Completion Plan prepared?
Section 5:
Yes No Comments/Actions Reference
Measurement, Analysis and improvement (Quality & System)
1 Manegement Review Meeting
Is the Project Management Review held at planned intervals?
Do Project Sr. Management participate in the Project Management Review
Meeting?
Are the MRM's minuted and proposed actions tracked?
Are the identified points closed out within assigned timeframe?
Are project quality monthly reports submitted on time?
How to ensure data present in the Monthly report are correct?
2 Project Plans and Mgmnt System Documents
Are Project Management Plan and identified sub-plans prepared and signed off
by Project Director?
Does Project Management Plans reflect the project activities?
Has Project Quality Plan been developed and Quality Objectives identified?
Are project staff using latest version of corporate procedures and project SOP's?
Are Project SOP's, WMS and Project Management Plans communicated to
project staff?
Are project SOP's, WMS reviewed by Project Department Heads and approved
by Project Director?
How well do the staff understand their respective procedures?
3 Quality Audits
Page 5 of 8
Is the training/ induction evaluation sheet filled in by attendants?
Page 6 of 8
6 Customer Satisfaction
Are Customer feedback/compliants are monitored in the Client Feedback
Register?
Are issues raised by Client are responsed and closed out in time?
Are Project Customer Satisfation Surveys conducted on quarterly basis and
reported to Corporate via Quality Monthly Report and
Project Monthly Report?
Are issues raised in the Customer Satisfaction Surveys reviewed in the
Management Review Meetings and actions taken?
Are ITP's generated and approved by Client/ TPI for implementation during
construction phase?
Is Conformance Report generated for each activiity in the ITP?
Are Quality Costs measured and reported on a regular basis?
Is the Quality walk system established and the observations being recorded and
tracked?
Section 6:
Yes No Comments/Actions Reference
Commercial
3 Procurement/ Subcontract
Is the project Subcontractors/ Suppliers Register established and
maintained?
Is the Procurement Criteria identified for Project critical materials?
Is Subcontract & Procurement Schedule established and maintained?
Do the RFQ's clearly state the work requirements i.e. sepcification, Quality/HSE
requirements …etc.,?
Are the quotation of qualified Subcontractors/suppliers evaluated
(technical/ Commercial)?
Describe the technical evaluation process for suppliers/subcontractors
proposal? Are the technical evaluation conducted by concern Department
i.e. Quality, HSE, Engineering, Construction…etc.)
Are Pre-assessment visit/ inspections carried out for all major subcontractors/
Suppliers prior to awarding the contract? Are reports generated?
Are all Department Heads envolved in the process of developing and reviewing
Project Risk Register?
Is the latest version of Project Risk Register communicated to all Department
Heads?
Are identified Risks notified to risk owners?
Does the Project Comemcial Manager ensure Risk owners taking actions to
mitigate/ close out the assigned risks within time frame?
Is Project risk/ opportunities included in the Project Progress Monthly Report for
Management Review Meeting?
Page 7 of 8
Section 7:
Yes No Comments/Actions Reference
Human Resource Management
1 HR Objectives/ Targets and staffing schedule
Have Project HR Objectives and KPI's been established and monitored?
Are objectives SMART?
What is the mechanism to monitor the status of achieving Set Objectives?
4 Onboarding process
Are Onboarding presentations (including HR, HSE, Management
Systems, etc.,) prepared and up to date?
Page 8 of 8