Professional Documents
Culture Documents
SR-ES R10. IOM-IOM3 Migration Via 205620SAM Procedure
SR-ES R10. IOM-IOM3 Migration Via 205620SAM Procedure
0
IOM1/2-IOM3 Migration via 5620 SAM
Procedure
IP-GPEC TEAM
Introduction .............................................................................................................. 4
General ............................................................................................................ 4
Purpose ........................................................................................................... 4
Restrictions ...................................................................................................... 5
Intended Audience ............................................................................................. 5
Document Conventions ........................................................................................ 5
Document Revision History .................................................................................... 5
Web Site .......................................................................................................... 6
IP-GPEC Announcements ...................................................................................... 6
Feedback ......................................................................................................... 6
Document Issues ................................................................................................ 6
Timeline .......................................................................................................... 6
References ........................................................................................................ 7
Reference List ................................................................................................... 7
Requirements ..................................................................................................... 8
Pre-requisites ................................................................................................... 8
Engineering Skills ............................................................................................... 8
Required Materials ............................................................................................. 8
Pre-Migration ............................................................................................................ 9
Pre-Migration Tasks.............................................................................................. 9
Configuring the Chassis Mode ................................................................................. 9
Backup NE configuration on SAM ............................................................................. 9
Tech-support File ............................................................................................... 9
Saving Log File ................................................................................................. 10
Required Outputs .............................................................................................. 11
Migration ................................................................................................................ 12
Migration Tasks .................................................................................................. 12
Card Migration Management Procedures .................................................................. 12
Post-Migration .......................................................................................................... 19
Post-Migration Tasks ........................................................................................... 19
Information ..................................................................................................... 19
Required Outputs .............................................................................................. 19
Tech-support File .............................................................................................. 20
Back out ................................................................................................................. 21
Back out Tasks................................................................................................... 21
Introduction .................................................................................................... 21
Issue 1 ........................................................................................................... 21
Issue 2 ........................................................................................................... 21
APPENDIX-A: Additional Information ............................................................................... 24
Swapping the IOM Cards ....................................................................................... 24
Tasks ............................................................................................................. 24
7750 SR & 7450 ESS R10.0 IOM1/2-IOM3 Migration via 5620 SAM Procedure 3FQ 24026 70XF PGZZA
Introduction
General
Purpose The purpose of this document is to provide the migration procedure of the existing IOM1/2s to
IOM3s modules with 5620 SAM Application. The detailed procedure includes highlight service
impact and back out scenarios.
WARNING:
The software version of the products used in this procedure are:
o 10.0 R5 on 7750 SR
o 10.0R3 on 5620 SAM
An IOM downgrade, for example, a migration from an IOM3 to an IOM2, is not
supported.
General, Continued
Restrictions Below are restrictions for IOM1/2-IOM3 migration with SAM from Reference [1].
General
Only the 5620 SAM admin user, or a user with an assigned administrator scope of
command role, can create, modify, or execute a migration event.
The migration functions are not available to 5620 SAM OSS clients.
You may need to re-enable SNMP on an NE after the NE reboots following a
migration event.
You can only perform a card migration if the description associated with the cards
being migrated does not contain any numerical values.
IOM-specific
An IOM downgrade, for example, a migration from an IOM 3 to an IOM 2, is not
supported.
MDA-specific:
You cannot migrate an empty MDA slot to an MDA.
MDA migration is limited to MDAs of the same physical transmission type; for
example, migration from a SONET MDA to an Ethernet MDA is not supported.
You cannot upgrade an MDA that is integrated with an IOM, for example, an IMM.
For MDAs, you can migrate only to an MDA of similar capacity that has the same or a
greater number of ports.
Intended This document is intended for internal use only and shall be distributed among the people
Audience listed below.
Integration Engineers
Field Engineers
Technical Project Managers
Project Managers
Document Yellow highlighted text depends on the network configuration and can be different in your
Conventions setup.
Document The below table shows the revision history of this document.
Revision History
Date Author Revision Change
14.08.2012 Ozan GONULTAS 1.0 Document Creation
16.08.2012 Cihan TOKA 1.1 Document Review
20.09.2012 IP-GPEC Team 1.2 Document Review
27.09.2012 Ozan GONULTAS 1.3 10.0 R5 Updates
NOTE: Please check IP-GPEC Homepage for the most recent version of this document.
General, Continued
Web Site You can visit the following page for other IPD product documents.
https://all1.na.alcatel-lucent.com/Teams/GCDNetworks/IPGPEC/default.aspx
IP-GPEC In order to be kept updated with the most recent news from IP GPEC Team, please join the
Announcements engage group using the link below.
https://engage.alcatel-lucent.com/groups/ipd-gpec
Document If you find any issues about this document, please raise a ticket for NPIf-IPD-TR Workgroup.
Issues Simply, send email to support@alcatel-lucent.com including:
Cares Workgroup
Your contact information
Document Name
Issue Description
Timeline
References
Reference List You can find the list of references referred in this document in the table below:
No Title
1 Alcatel-Lucent 5620
SERVICE AWARE MANAGER | RELEASE 10.0 R5 USER GUIDE
3HE 06993 AAAA TQZZA Edition 01
3 7750 SR
Basic System Configuration Guide
93-0070-09-02
Requirements
Pre-requisites
Engineering Person who is in charge of performing procedures explained in this document should be
Skills capable of;
7750 SR software boot process and cards:
- IOM, IMM, MDA, CPM, Compact Flash
Experience of 7750 SR hardware and software installation:
- Knowledge of card installation, checking 7750 SR logs
Pre-Migration
Pre-Migration Tasks
Configuring the Depending on the chassis and IOM type, the following modes can be configured;
Chassis Mode Make sure that the chassis-mode is compatible with existing and migrated IOMs on the node.
To check the chassis mode of the system, simply run the command below:
A:IP-GPEC# show chassis
========================================================================
Chassis Information
========================================================================
Name : SR12-1
Type : 7750 SR-12
. . . >>>Output Omitted
Admin chassis mode : b
Oper chassis mode : b
. . . >>>Output Omitted
Backup NE Use the 5620 SAM to back up the device configuration of each target NE. This Backup is used
configuration to back out the system to initial configuration if a problem occurs during the migration.
on SAM
CAUTION: When you attempt a migration on a NE that does not have a recent
configuration backup in the 5620 SAM database, the 5620 SAM raises an alarm and the
migration fails.
See chapter 23 in Reference [1] for information about performing NE backups.
Migration
Migration Tasks
2 Click on the Create button. The „Card Migration Event (Create)’ window opens
with the General tab displayed.
3 Configure the parameters:
ID or Auto-Assign ID
Description
Additional Information
Auto Reboot
4 Switch to the NE Migration Candidates tab and click on the Add button.
The „Select Network Elements / Card Migration Event‟ window opens.
Card Migration
Management Step Action
Procedures
5 Select one or more NEs in the list on which card migration operation will be
(continued)
performed and click on the „OK’ button.
6 Select one or more NEs in the list and click on the Properties button. The „Network
Element Migration Candidates’ form opens.
7 Configure the Auto Reboot parameter as needed. Then click on the „OK’ button.
Card Migration
Management Step Action
Procedures
10 Select one or more cards in the list and click on the „OK’ button.
(continued)
11 Select one or more cards in the list and click on the Properties button. The
‘Migration Details (Create)’ form opens.
Card Migration
Management Step Action
Procedures
12 Configure the New Type parameter in the IOM panel, MDA1 panel, MDA2 panel as
(continued)
required.
Card Migration
Management Step Action
Procedures
17 Run „show card ‟command and wait until the equipped card-type is the same as
(continued)
newly replaced card-type.
==================================================================
Card Summary
==================================================================
Slot Provisioned Type Admin Operational
Equipped Type (if different) State State
------------------------------------------------------------------
1 iom3-xp up up
8 iom-20g-b up failed
iom3-xp
A sfm4-12 up up/active
B sfm4-12 up down/standby
(not equipped)
==================================================================
18 Click on the General tab on „Card Migration Event’ form to display the Status
indicator.
Card Migration
Management Step Action
Procedures
20 Click on the „Yes‟ button. The 5620 SAM starts to migrate the specified cards.
(continued)
21 Monitor the card migration as it progresses by viewing the Status indicator on the
form. If Auto Reboot is unchecked, the following status will be seen as below.
22 If Auto Reboot checkbox was not selected during the configuration, reboot the
device. Otherwise skip to next step.
Card Migration
Management Step Action
Procedures
23
(continued)
WARNING: Re-enable the SNMP if needed after reboot.
A:SR12-1>config>system>snmp# info
----------------------------------------------
shutdown
packet-size 9216
----------------------------------------------
A:SR12-1>config>system>snmp# no shutdown
Post-Migration
Post-Migration Tasks
Information Saved logs during the Pre-Migration step indicate the status of the services before migration. In
order to validate the status of the services after migration and verify stability of same services,
before and after Post-Migration tasks should be performed.
Back out
Introduction In order to back out the system to initial status, back out operation must be performed.
Issue 1
If ... Then ...
the IOM3 fails remove and re-insert the card and check the status of the
card.
the IOM3 fails again after re- replace the card with a new IOM3 and check the status of
insert the card.
Issue 2 The backup which is taken in „Pre-Migration Tasks‟ section will be applied to the failed node to
back out the system to initial status.
Step Action
1 Choose „Administration→NE Maintenance→Backup/Restore’ from the
5620 SAM main menu. The „Backup/Restore form‟ opens.
Issue 2
(continued)
Step Action
3 From „Backup/Restore Policy’ tab, select the SR Based policy and click on
„Properties’ button.
4 Check „Auto Reboot After Successful Restore‟ button and click on „OK’.
Issue 2
(continued)
Step Action
Step Action
1 Remove existing IOM or IOM2 cards.
2 Remove the IOM3s from the packaging. Do not touch the printed circuit board
and connector pins.
3 If the Impedance panel is covering the chassis slot, remove the panel by
loosening the panel‟s captive screws.
4 Holding the IOM3 by the edges, rotate the ejector levers inward. The ejector
levers must be in this position to release the locking mechanism.
5 Align the IOM3 in the slot guide and slide the IOM inward until the connectors
are seated with the backplane.
- End Of Document –
www.alcatel-lucent.com
Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of
Alcatel-Lucent. All other trademarks are the property of their respective owners.
The information presented is subject to change without notice. Alcatel-Lucent
assumes no responsibility for inaccuracies contained herein. Copyright © 2012
Alcatel-Lucent.
All rights reserved.