STEEL B.B.S.

FOR HOTEL AT SOHANA


Cutting
Dia of Total
Sl. Location Bar No of Length
Shape of Bar 1 2 3 4 5 Bar No. of Bar No. Remarks
No. of Bar Mkd. bend of Bar
(mm) of Bar
(inch)

` (inch.) (inch.) (inch.) (inch.) (inch.) items x bars f 8 f 10 f 12 f 16 f 20 f 25


A FOUNDATIONS

1 F-1 MAIN 2 12 82 12 10 105 3 X 81 243 2126.3

DIST. 2 12 82 12 10 105 3 X 81 243 2126.3

1 F-2 MAIN 2 12 94 12 10 117 3 X 19 57 555.8

DIST. 2 12 94 12 10 117 3 X 19 57 555.8

1 F-3 MAIN 2 12 85 12 10 108 3 X 17 51 459.0

DIST. 2 12 101 12 10 124 3 X 17 51 527.0

1 F-4 MAIN 2 12 100 12 10 123 1 X 20 20 205.0

DIST. 2 12 100 12 10 123 1 X 20 20 205.0

1 F-5 MAIN 2 12 70 12 10 93 2 X 8 16 124.0

DIST. 2 12 40 12 10 63 2 X 14 28 147.0

1 F-6 MAIN 2 12 73 12 10 96 1 X 12 12 96.0

DIST. 2 12 46 12 10 69 1 X 19 19 109.3

1 F-7 MAIN 2 12 73 12 10 96 1 X 12 12 96.0

DIST. 2 12 46 12 10 69 1 X 19 19 109.3

1 CF-1(Lift wall) MAIN 2 12 205 12 12 227 1 X 21 21 397.3

DIST. 2 12 121 12 12 143 1 X 52 52 619.7


4 RW-1 MAIN 2 12 34 12 10 57 1 X 334 334 1586.5

DIST. 2000 0 10 2000 1 X 5 5 833.3

4 RW-2 MAIN 2 12 34 12 10 57 1 X 103 103 489.3

DIST. 615 0 10 615 1 X 5 5 256.3

ADDITIONAL FOR LAP LENGTH 0.0 742.5 81.4 0.0 0.0 0.0
TOTAL LENGTH REQUIRED FOR RETAINING WALL
TOTAL QUANTITY FOR RETAINING WALL
Total Steel Required
Foundation 2.6 MT
B COLUMNS (UPTO 10')

1 C-1 1 18 120 16 137 1 X 10 10 114.2

TIES a 4 6 15 6 8 46 1 X 22 22 84.3

4 6 7 6 8 30 1 X 22 22 55.0

2 0 15 0 8 35 1 X 22 22 64.2

2 C-2 1 18 120 20 137 1 X 6 6 68.5

1 18 120 16 137 1 X 4 4 45.7

TIES a 4 9 15 9 8 52 1 X 22 22 95.3

4 9 7 9 8 36 1 X 22 22 66.0

2 0 15 0 8 35 1 X 22 22 64.2

ADDITIONAL FOR LAP LENGTH 30.0 0.0 0.0 12.8 6.9 0.0
TOTAL QUANTITY FOR COLUMNS (UPTO PLINTH)

Total Steel Required


Column (upto plinth) 0.2 MT
RETAINING WALL

1 RW-1 a 2 18 120 3 10 140 1 X 400 400 4666.7

b 2 18 120 3 10 184 1 X 334 334 5121.3

DIST. BARS c 2 6 2000 6 8 2011 1 X 12 12 2011.0

d 2 6 2000 6 8 2011 1 X 12 12 2011.0

B RW-2 a 2 18 120 3 10 140 1 X 123 123 1435.0

b 2 18 120 3 10 184 1 X 103 103 1579.3

DIST. BARS c 2 6 615 6 8 626 1 X 12 12 626.0

d 2 6 615 6 8 626 1 X 12 12 626.0

ADDITIONAL FOR LAP LENGTH 369.2 896.2 0.0 0.0 0.0 0.0
TOTAL LENGTH REQUIRED FOR LIFT WALL
TOTAL QUANTITY FOR LIFT WALL

Total Steel Required Lift 3.4 MT

STITCH FLOOR
1 a 442 8 442 1 X 67 67 2467.8

a 535 8 535 1 X 56 56 2496.7

2 a 391 8 391 1 X 67 67 2183.1

a 121 8 121 1 X 56 56 564.7

ADDITIONAL FOR LAP LENGTH 539.9 0.0 0.0 0.0 0.0 0.0
TOTAL LENGTH REQUIRED FOR STITCH FLOOR
TOTAL QUANTITY FOR STITCH FLOOR
Total Steel Required
Stitch Floor 1.0 MT
LIFT WALL

1 LIFT WALL a 2 18 93 10 110 1 X 18 18 165.0

b 2 18 93 10 184 1 X 18 18 276.0

DIST. BARS c 2 6 121 6 8 132 1 X 12 12 132.0

d 2 6 121 6 8 132 1 X 12 12 132.0

ADDITIONAL FOR LAP LENGTH 18.5 30.9 0.0 0.0 0.0 0.0
TOTAL LENGTH REQUIRED FOR LIFT WALL
TOTAL QUANTITY FOR LIFT WALL

Total Steel Required Lift 0.1 MT


14636.8 25519.7 1098.3 172.6 75.4 0.0
4462.4 7780.4 334.8 52.6 23.0 0.0
0.395 0.617 0.888 1.580 2.469 3.858
1762.7 4800.5 297.3 83.2 56.7 0.0
total weight kg 7000.4
add 2% for misllenious kg 140.01

total weight of steel req. kg 7140.4


total weight of steel req. mt 7.1403790961128
ESTIMATION STEEL QUANTITY ( SOHANA HOTEL)
DIA 8MM 10MM 12MM 16MM 20MM 25MM
QUANTITY 1762.7 4800.5 297.3 83.2 56.7 0.0
WASTAGE (2%) 35.253262 96.010009 5.9467302 1.6630463 1.134385 0
TOTAL QTY (KG) 1797.9 4896.5 303.3 84.8 57.9 0.0
TOTAL QTY (TONNE) 1.80 4.90 0.30 0.08 0.06 0.00

TOTAL STEEL QTY. 7.14 TONNE