Professional Documents
Culture Documents
March 27, 2010 Faisal Yusuf bunker survey, Bunker Survey Calculation, marine
cargo surveyor, marine survey
** Question :
FO Tank No. 1 Center, Corrected Sounding = 3.27 Meter,
Temperature = 34*C,and density @ 15*C = 0.9903 (given density).
Tank Volume at Sounding 3.20 M = 157.20 Cubic Meter,
at Sounding 3.30 M = 163.60 Cubic Meter.
** Answer :
– The Quantity in Metric Ton = Oil Vol x VCF x WCF,
– Observe Volume = {(3.27 – 3.20) / (3.30 – 3.20) x (163.60 – 157.20)} + 157.20
= (0.07/0.10) x (6.40) + 157.20 = 4.48 + 157.20 = 161.68 Cu.M.
– T 54B (VCF) > Density @ 15*C 0.9903 = 0.9870 (see the above picture you need
to interpolate if any different numbers on both columns).
ASTM Table 54B – T 56 (WCF) : Density @15*C 0.9903 = 0.9892
(Quick formula with reducing factor for WCF is Density @ 15*C – 0.0011 = 0.9903 –
0.0011 = 0.9892).
We don’t need to see the table anymore.
– So, The Quantity in MT is 161.68 x 0.9870 x 0.9892 = 157.85 MT.
Sample calculation tanks sounding attached below (the Temp below should be 34 C).
Note : If you do calculation with Volume in Barrel, just uses ASTM Table 6B for
VCF, ASTM Table 11 for WCF in Long Ton and then ASTM Table 13 for WCF in
Metric Ton.
For the above calculation, you could download the software BunkerCal by follow this
link http://www.sevensurveyor.com/software/bunker-calculation/