You are on page 1of 12

011-, t /hlJ1f

Oy· zLf' Z;1J


Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CENTRAL OFFICE
Manila

o 6 APR 2020
MEMORANDUM

FOR REGIONAL DIRECTORS


DISTRICT ENGINEERS
This Department

SUBJECT Construction of Rainwater Collectors in Public Facilities- FY 2020

This has reference for the Construction of RWCS for FY 2020 in compliance tor RA 6716: An
Act of Providing for the Construction of Water Wells, Rainwater Collectors, Development of
Spring and Rehabilitation of Existing Water Wells in all Barangays in the Philippines.

Please be informed that the Department has allotted the amount of P847,OOO,OOO
for the
Construction of RWCS nationwide. The specific amount thereto has been appropriated and
were approved for released to the DPWH Regional and District Engineering Offices (see
Annex A) as per Memorandum dated February 20, 2020.

In view hereof, all Offices shall identify and submit the list of beneficiaries using the attached
Form in Annex Band C. The forms shall be submitted in hard and electronic file to the
Proarammina Division. Plannina Service (copy furnished Environmental and Social
Safeguards Division (ESSD)) for the assignment of Project ID.

Hereunder are the guidelines for the selection of design and beneficiaries of RWCS FY 2020:

Guidelines on Selection of Beneficiaries for the Construction of RWCS FY 2020

1. Beneficiaries
The RWCS shall be installed within the public market/ public school! public building in
all Barangays in the Philippines. A minimum of twelve (12) beneficiaries shall be the
target per Implementing Office.

2. Location
The area/location that will be considered must be either of the following:

a) Must have no existing water supply or source of water is limited and scarce
b) Areas considered as Waterless Municipalities
c) Areas under the Risk Resiliency Program Targets
3. Design of RWCS

Prototypes of RWCS set by the Bureau of Design (BOD) from 2014-2019 can be used
depending on the location. Further, preference of the Proponent may also be
considered as design of such RWCS based on their evaluation and assessment. The
design should take its consideration on the appropriateness to the location, maximizing
capacity vis-a-vis area of source and necessity of the beneficiaries. All design
preference of the proponent not conforming to the prototypes set by DPWH from 2014-
2019 shall be subject for the approval of the Bureau of Design (BOD).

4. Cost of Rainwater Collection System

The cost of the RWCS shall only be intended for the construction which includes
hauling cost of the RWCS and other ancillary parts to maximize the use of RWCS such
as gutter, downspout, wash areas (for Public Schools) as needed. Cost incurred for
the acquisition of land for the location of RWCS shall not be included.

For strict compliance.

MARIA CATALINA E. C RAL, Ph.D, CESO I


Undersecretary for Planning and PPP

cc: Engr. MILAGROS C. MANAYSAY


Chief, Programming Division, Planning Service

End: 1) Annex A: Memorandum dated February 20, 2020 released of Fund to the Offices
2) Annex B: List of Beneficiaries FY 2020
3) Annex C: Project Profile per Beneficiaries

4.1.4 MCESU/MVOL/RBdR
·,
Republic of the Philippines
,DEPARTMENT' OF PUBLIC WORKS AND HIGHWAYS
CENTRAL OFFICE
Manila

- - - -. r- .. -~ .-,
i.. '.' :.~.~ •••

MErJlORANDUM

TO GENEVIEVE E. CUARESMA
Officer-In-Charge, Office of the Dir~ctor
Finance Service
This Department .,
Please release to the following Regional/District Offices concerned, the total amount of
P215,985,OOO.00 tor the R-alnwater Collectors In Public facilities in Regions: lX, X, Xl, Xl!, and
XIII (see attached Annex "A'j, to be charged against the appropriations for
Construction/Rehabilitation of Water Supply/Septage and Sewerage/Rain Water Collectors - Rain
Water Collectors in Public Facilities, comprehensively released to the Central Office, through
National Budget Circular No. 578 dated 06 January 2020, FY 2020 General Appropriations Act
G (GAA), R.A. 11465, as follows:
Region/UACS/lmplementing Office Amount (P)
.'
A. Reoion IXJ300205100013000 42,350,000
1. Regional Office IX 4,235,000
2. Isabela City District Engineering Office 4,235,000
3. Zamboanga City District Engineering Office 4,235,000
4. Zamboanga del Norte 1st District Engineering Office 4,235,000
5. Zamboanga del Norte 2nd District Engineering Office 4,235,000
6. Zamboanga del Norte 3rd District Engineering Office 4,235,000
7. Zamboanga del Sur 1st District Engineering Office 4,235,000
8. Zamboanga del Sur 2nd District Engineering Office 4,235,000
9. Zamboanga Sibugay 1st District Engineering Office 4,235,000
10. Zamboanga Sibugay 2nd District Engineering Office 4,235,000
B. Reoion X/300205100014000 55,055,000
o 1. Regional Office X
2. Bukidnon 1st District Engineering Office
4,235,000
4,235,000
3. Bukidnon 2nd District Engineering Office 4,235,000
4. Bukidnon 3rd District Engineering Office 4,235,000
5. Cagayan de Oro City 1st District Engineering Office 4,235,000
6. Cagayan de Oro City 2nd District Engineering Office 4,235,000
7. Camiguin District Engineering Office 4,235,000
8. Lanao del Norte 1st District Engineering Office 4,235,000
9. Lanao del Norte 2nd District Engineering Office 4,235,000
10. Misamis Occidentai 1st District Engineering Office 4,235,000
11. Misamis Occidental 2nd District Engineering Office 4,235,000
12. Misamis Oriental 1st District Engineering Office 4,235,000
B. Misamis Oriental 2nd District Engineering Office 4,235,000
'c. Reoion XI/300205100015000 38,115,000
1. Regional Office XI 4,235,000
2. Composteia Valley District Engineering Office 4,235,000
3. Davao City 2nd District Engineering Office 4,235,000
4. Davao City District Engineering Office 4,235,000
5. Davao dei Norte District Engineering Office 4,235,000
6. Davao del Sur District Engineering Office 4,235,000
7. Davao Occidental District Engineering Office 4,235,000
8. Davao Oriental 1st District Engineering Office 4,235,000
9. Davao Oriental 2nd District Engineering Office 4,235,000
Request for release of funds in the total amount of P2.15.9B5,OOO.OQfor the Rain Water Collectors in Public Fadlities
Page2of2

D. Reoion XIII 300205100016000 38,115,000


1. Regional Office XII . 3,811,500
2. Cotabato 1st District Engineering Office 3,811,500
3. Cotabato 2nd District Engineering Office . 3,811,500
4. CotabatQCity District Engineering Qffice 3,811,500
5. Cotdudlu Suu-Di~l1iLL Ellgil1eering Office 3,811,500
6. Sarangani District Engineering Office 3,811,500
7. South Cotabato 1st District Engineering Office 3,811,500
8. South Cotabato 2nd District Engineering Office 3,811,500
9. Sultan Kudarat 1st District Engineering Office 3,811,500
10. Sultan Kudarat 2nd District Engineering Office 3,811,500
E. Reaion XIII/3002051 00017000 42,350,000
1. Regional Office XIII 4,235,000
.'
2. Agusan del Norte District Engineering Office 4,235,000
3. Agusan del Sur 1st District Engineering Office 4,235,000
4. Agusan del Sur 2nd District Engineering Office 4,235,000
5. Butuan City District Engineering Office 4,235,000
6. Dinagat Islands District Engineering Office 4,235,000
7. Surigao del Norte 1st District Engineering Office 4,235,000
8. Surigao del Norte 2nd District Engineering Office 4,235,000
9. Surigao del Sur 1st District Engineering Office 4,235,000
10. Surigao del Sur 2nd District Engineering Office 4,235,000
Total 215,985,000
The release is being made on the basis of the lv1emorandumdated 03 February 2020 of Rosemarie

o
B. Del Rosario, Chief, Environmental and Social Safeguards Division (ESSD), and noted by Director
Constante A. Llanes, Jr., CESOIII, both in Planning Service.

This request for the release of funds is prepared by the Programming Division, Planning Service and
are recommended/approved by the concerned officials based on the Delegation of Authority under
the Department Order No. 220, Series of 2016.

It is understood that obligations/disbursements of the said funds shall be made in accordance with
the existing budgeting, accounting and auditing ruies and regulations.

MARIA CATALINA E. CABRAL, Ph.D., CE50 I


Undersecretary for Planning and PPP

Approved:

DIMAS S. SO U N, CE50 I
Undersecretary or .Mindanao Regional Operations
~
Cc: The Oire:tor,?anning S-"'I'Iice
TheDiv,sionChief,ESSD,P1anningServ;ce

4.1.3 AGV/LCG/PPRCJMQ-I
Fs36/18 February Z020
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CENTRAL OFFICE
Manila

FEB Z 1 2m , ·~FE2.2_'; 2:C?D_


MEMORANDUM .. tfJJ'f.{.J.r°'
, ,I

TO GeNeVIEVE E. GIJAR!,~MA
Officer- In-Charge, Office of the Director
Finance Service
This Department

Please release to the following Regional/District Offices concerned, the total amount of
fl355,740,OOO.OO lor the R~inw~ter Colleclors In PubliC:f~dlities hi Regions: If CAR, II, Iii, Iv-A,
and V (see attached Annex "A"), to be charged against the appropriations for
Construction/Rehabilitation of Water Supply/Septage and Sewerage/Rain Water Collectors - Rain
Water Collectors in 'Public Facilities, comprehensively released to the Central Office, through
National Budget Circular No. 578 dated 06 January. 2020, FY 2020 General Appropriations Act
(GAA), R.A. 11465, as follows:

I Region/UACS/Implementing Office Amount (P) I


A. Reoion I/300205100003000 46.585.000
1. Regional Office I . 4,235,000
2. Ilocos Norte 1st District Engineering Office 4,235,000
3. I1ocosNorte 2nd District Engineering Office 4,235,000
4. Ilocos Sur 1st District Engineering Office 4,235,000
5. I1ocosSur 2nd District Engineering Office 4,235,000
6. La Union 1st District Engineering Office 4,235,000
7. La Union 2nd District Engineering Office 4,235,000
8. Pi?ngi?sinan1st l2is.tricj:I;ngjnel:rillg, O.ffic;e 4,235,000.
9. Pangasinan 2nd District Engineering Office 4,235,000
10. Pangasinan 3rd District Engineering Office

o B.
11. Pangasinan 4th District Engineering Office
Cordillera Administrative Reoion (CARl/300205100004000
4,235,000
4,235,000
55.055.000
1. CAR Regional Office 4,235,000
2. Abra District Engineering Office 4,235,000
}.ApQYQQ J.$t j)i$trirt fngill~rillg 0ffi>:S! 4.J35,DDD
4. Apayao 2nd District Engineering Office 4,235,000
5.. Baguio City District Engineering Office 4,235,000
6. Benguet 1st District Engineering Office 4,235,000
7. Benguet 2nd District engineering Office 4,235,000
8. Ifugao 1st District Engineering Office 4,235,000
9. Ifugao 2nd District Engineering Office 4,235,000
10. LowerKalinga District Engineering Office 4,235,000
11. MountainProvince 2nd District Engineering Office . 4,235,000
12. Mt. Province District Engineering Office 4,235,000
13. Upper Kalinga District Engineering Office 4,235,000
C. Reqion II/3002051000OS000 50.820.000
1. Regional Office II 4,235,000
2. Batanes District Engineering Office' 4,235,000
3. Cagayan 1st District Engineering Office 4,235,000
4. Cagayan'2nd 'District'Engineering 'Office 4;235;000
5. Cagayan 3rd District Engineering Office 4,235,000
6. Isabela 1st District Engineering Office 4,235,000
7. Isabela 2nd District Engineering Office 4,235,000
8. Isabela 3rd District Engineering-Office 4,235,000
9. Isabeia 4th District Enqineerinq Office 4.:,nS.nnn
I

/
/

Re::pest for release of funds in the total amount of P35S,740,OOO.OO for the Rain Water CoIiectors in PutlIic Fadllties
Page2of3

10. Nueva Vizcaya 2nd District Engineering Office 4,235,000


11. Nueva Vizcaya District Engineering Office 4,235,000
12. QUirino District Engineering Office 4,235,000
D. Reqion ml30020S100006000 63.525,000
1. Regional Office III 4,235,000
2, Aurora District En\Jineerin€lOffjGe '1.~~5iQQQ
3. Bataan 1st District Engineering Office 4,235,000
4. Bataan 2nd District Engineering Office 4,235,000
5. Bulacan 1st District Engineering Office 4,235,000
6. Bulacan 2nd District Engineering Office 4,235,000
7. Nueva Ecija 1st District Engineering Office 4,235,000
8. Nueva Ecija 2nd District Engineering Office 4,235,000
9. Pampanga 1st District Engineering Office 4,235,000
10. Pampanga 2nd District Engineering Office 4,235,000
11. Pampanga 3rcf Dis~ict Engineerinq Offic-e 4,235,000
12. Tarlac 2nd District Engineering Office 4,235,000
13. Tarlac District Engineering Office 4,235,000
14. Zambales 1st District Engineering Office 4,235,000
15. Zambales 2nd District Engineering Office 4,235,000
E. Reqion N-A/300205100007000 71,995,000
1. Regional Office IV-A 4,235,000
2. Batangas 1st District ~ngineering Qffice 4,235,000
3. Batangas 2nd District Engineering Office 4,235,000
4. Batangas 3rd District Engineering Office 4,235,000

o 5. Batangas 4th District Engineering Office


6. Cavite 1st District Engineering Office
7. Cavite 2nd District Engineering Office
4,235,000
4,235,000
4,235,000
8. Cavite 3rd District Engineering Office 4,235,000
9. Laguna 1st District Engineering Office 4,235,000
10. Laguna 2nd District Engineering Office 4,235,000
11. Laguna 3rd District Engineering Office 4,235,000
12. Quezon 1st District Engineering Office 4,235,000
13. Quezon 2nd District Engineering Office 4,235,000
14. Quezon 3rd District Engineering Office 4,235,000
15. Quezon 4th District Engineering Office 4,235,000
16. Rizallst District Engineering Office 4,235,000
-17. Riz<'ll.2ndDistrict -EngineeringOffICe 4,235,llil0
F. Reqion V/300205100009000 67.760,000
1. Regional Office V 4,235,000
2. Albay 1st District Engineering Office 4,235,000
3. Albay 2nd District En-gineerin-gOffice 4,235,000
4. Albay 3rd District Engineering Office 4,235,000
5. Camarines Norte District Engineering Office 4,235,000
u. Cam<irine<;.sur 1st District €ngineering Gffi12e 4,235,GOQ
7. Camarines Sur 2nd District Engineering Office 4,235,000
8. Camarines Sur 3rd District Engineering Office 4,235.000
9.. Camarines Sur 4th District Engineering Office 4,235,000
10. Camarines Sur 5th District Engineering Office 4,235,000
11. Catanduanes District Engineering Office 4,235,000
• "
" .
".-'
/

Re~u:stfor releOlse of funds in the total am:)unt of P3551740,OOO.OO for the Rain Water Colle:tors in Public Fa:ilities
Page30f3

12. Masbate 1st District Engineering Office '<\,235,000


13. Masbate 2nd District Engineering Office 4,235,000
14. Masbate 3rd District Engineering Office 4,235,000
15. Sorsogon 2nd District Engineering Office 4,235,000
16. Sorsogon District Engmeering Office 4,235,000
-----
Total 355,740,000

The release is being .madeon the .basis.of the Ivlemorandum .dated .03 February 2020 of R()semarie
B. Del Rosarii>, Cnief, Environmelltal alld Social Safeguarcis Divisioll (ESSD), and Iloted by Director
Constante A. Llanes, Jr., CESOIII, both in Planning Service.

This request rer i'he release Gf Wiles is IOrelOar«fby t:!ie Pmgrammillg DivisiGIl, Plallilillg Serviee aile
are recommended/approved by the concerned officials based on the Delegation of Authority under
the Department Order No. 220, Series of 2016.

9f \:h~:;iliq fUnq:; :;hilll I;>~milq~ in ilc:corqiln~~ With


it i:; unq~r:;t99q thilt 91;>Ii99ti9n:;/qi:;l;>ur:;~m~nt:;
the existing budgeting, accounting and auditing rules and regulations.

Recommended by:

MARl Ii. A utA E. CABRAL, Ph.D., CESO I


Undersecretary for Planning and PPP

o
Approved :

Cc: The Director


Planning Service

The Division Chief


ESSD, Planning Seryice

4.1.3 AGV/LCG/PPRC/MCM
Fs34/18 February 2020
ANNEX B
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<Insert Name of Office>

Rainwater Collection System


List of Beneficiaries FY 2020

Region Project Type of Project Unit of City/Municipality X- y- Planned Start Duration Planned End Implementing
Component Work Component Measure Coordinate Coordinate Date (CDs) Date Office
Descriotion Cost Cmm/dd Cmm/dd
Region Construction of Construction <please enter Quirino District
II Rainwater of Rain Number of Engineering
Collection System Water unit per Office
(RWCS), <Insert Collector beneficiaries>
Name of
School>, <Insert
Citv/Municioalitv>

Prepared by: Submitted by:

J-
DPWH BRIDGE ACCOMPLISHMENT (COMPLETED)
Jan 2016-Dec 2019
Funded under FY 2016-2019 GAA
REGIONAL SUMMARY

NATIONAL BRIDGES(NUMBER)
LOCAL
Construction of Rehabilitation/ Replacement of Replacement of Retrofitting /
REGION BRIDGES TOTAL
Bridge Widening New Permanent Major Repair of Bridges (Temporary Permanent Weak Strengthening of
(NUMBER)
Bridges Permanent Bridges to Permanent) Bridges Bridges

Luzon 439 81 S79 33 137 655 260 2,184


CAR 9 10 58 14 12 56 35 194
NCR 1 1 57 - 4 52 15 130
I 100 14 45 3 32 54 47 295
II 62 11 90 4 17 55 39 278
III 98 11 96 - 21 133 50 409
IV-A 104 1 56 - 10 129 43 343
IV-B 32 16 112 11 16 96 11 294
V 33 17 65 1 25 80 20 241
Visayas 238 18 249 1 29 531 59 1,125
VI 104 9 48 1 15 161 18 356
VII 32 6 96 - 5 100 27 266
VIII 102 3 105 - 9 270 14 503
Mindanao 294 88 263 11 50 338 154 1,198
IX 11 25 53 - 17 46 35 187
X 113 19 67 - 8 100 41 348
XI 73 38 54 - 10 53 43 271
XII 47 2 37 6 9 75 16 192
XIII 50 4 52 5 6 64 19 200
Total 971 187 1,091 45 216 1,524 473 4,507

NOTE:
Data Is based on Project and Contract Management Applicarion (PCMA) and Project Monitoring System (PM5)
ANNEX C
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<Insert Name of Office>

PROJECT PROFILE
RAINWATER COLLECrION SYSTEM

I Name of Implementing Office:

Description of the Proiect


Project Name: Construction of Rainwater Collection System (RWCS), < Insert
Name of Beneficiaries>, < Insert City/Municipality>

Project Component Cost:


Type of Beneficiaries:
o Public School o Public Building o Public Market
Project Location: City/ Municipality: I Region:

Geotagged Coordinates <attached photos of possible


location>

Scope of Work
Type of RWCS o Concrete o Steel Tank o Plastic Tank

Capacity/ liters
Consumption:

Other ancillary parts:


PROJECT PROFILE
RAINWATER COLLECITON SYSTEM

Consideration

Geographical o Coastal Areas o Upland o Lowland 0 Urban


Location :
Catchment Area: sq. meter
Percentage of
Serving Population
D PERCENTAGE

Total Population of the Area:


Total of Serving Population:

Purpose of RWCS o Drinking and other potable uses


o Toilet flushing
o Fire protection
o Garden irrigation-ornamental
o Others (please specify):
Does your RWCS will o Link to RA RA 6716 objectives and DPWH indicators and
support the targets
following: o Use of climate and risk information as basis for the proposed
design (amount of rainfall in the area, hazard maps etc.)
(check appropriate o Climate-resilient design features
boxjes) o Environmental risks/impact to be addressed
o Convergence/synergies with resilience investments by other
NGAs encouraged
o Consideration of poverty impacts

Screening Questionnaire

Will the RWCS be the DYes o No o No Opinion


only source of water
in the area? If No provide other source:

Is the catchment DYes o No o No Opinion


area can collect 75-
90% of rain water? If No provide reasons:

o No gutter
o No downspout
o Others (please specify):
PROJECT PROFILE
RAINWATER COLLECTION SYSTEM

Is the RWCS need DYes DNa o No Opinion


ancillary support to
maximize its used? If No, provide suggested ancillary support:

o Wash area connected to the RWCS as requested by the


Beneficiaries
o Provide gutter, downspout connected to RWCS
o Others (please specify):
Is the Number of Unit DYes DNa
is enough to cater
the population of the
target areas?

Supporting Documents

o Design of RWCS and Projected Cost based in DUPA


o Request of Beneficiaries (if any)

Prepared by:

Submitted by:

You might also like