Memo 097.7 - 040620 - Construction of Rainwater Collectors Public Facilities
Memo 097.7 - 040620 - Construction of Rainwater Collectors Public Facilities
o 6 APR 2020
MEMORANDUM
This has reference for the Construction of RWCS for FY 2020 in compliance tor RA 6716: An
Act of Providing for the Construction of Water Wells, Rainwater Collectors, Development of
Spring and Rehabilitation of Existing Water Wells in all Barangays in the Philippines.
Please be informed that the Department has allotted the amount of P847,OOO,OOO
for the
Construction of RWCS nationwide. The specific amount thereto has been appropriated and
were approved for released to the DPWH Regional and District Engineering Offices (see
Annex A) as per Memorandum dated February 20, 2020.
In view hereof, all Offices shall identify and submit the list of beneficiaries using the attached
Form in Annex Band C. The forms shall be submitted in hard and electronic file to the
Proarammina Division. Plannina Service (copy furnished Environmental and Social
Safeguards Division (ESSD)) for the assignment of Project ID.
Hereunder are the guidelines for the selection of design and beneficiaries of RWCS FY 2020:
1. Beneficiaries
The RWCS shall be installed within the public market/ public school! public building in
all Barangays in the Philippines. A minimum of twelve (12) beneficiaries shall be the
target per Implementing Office.
2. Location
The area/location that will be considered must be either of the following:
a) Must have no existing water supply or source of water is limited and scarce
b) Areas considered as Waterless Municipalities
c) Areas under the Risk Resiliency Program Targets
3. Design of RWCS
Prototypes of RWCS set by the Bureau of Design (BOD) from 2014-2019 can be used
depending on the location. Further, preference of the Proponent may also be
considered as design of such RWCS based on their evaluation and assessment. The
design should take its consideration on the appropriateness to the location, maximizing
capacity vis-a-vis area of source and necessity of the beneficiaries. All design
preference of the proponent not conforming to the prototypes set by DPWH from 2014-
2019 shall be subject for the approval of the Bureau of Design (BOD).
The cost of the RWCS shall only be intended for the construction which includes
hauling cost of the RWCS and other ancillary parts to maximize the use of RWCS such
as gutter, downspout, wash areas (for Public Schools) as needed. Cost incurred for
the acquisition of land for the location of RWCS shall not be included.
End: 1) Annex A: Memorandum dated February 20, 2020 released of Fund to the Offices
2) Annex B: List of Beneficiaries FY 2020
3) Annex C: Project Profile per Beneficiaries
4.1.4 MCESU/MVOL/RBdR
·,
Republic of the Philippines
,DEPARTMENT' OF PUBLIC WORKS AND HIGHWAYS
CENTRAL OFFICE
Manila
- - - -. r- .. -~ .-,
i.. '.' :.~.~ •••
MErJlORANDUM
TO GENEVIEVE E. CUARESMA
Officer-In-Charge, Office of the Dir~ctor
Finance Service
This Department .,
Please release to the following Regional/District Offices concerned, the total amount of
P215,985,OOO.00 tor the R-alnwater Collectors In Public facilities in Regions: lX, X, Xl, Xl!, and
XIII (see attached Annex "A'j, to be charged against the appropriations for
Construction/Rehabilitation of Water Supply/Septage and Sewerage/Rain Water Collectors - Rain
Water Collectors in Public Facilities, comprehensively released to the Central Office, through
National Budget Circular No. 578 dated 06 January 2020, FY 2020 General Appropriations Act
G (GAA), R.A. 11465, as follows:
Region/UACS/lmplementing Office Amount (P)
.'
A. Reoion IXJ300205100013000 42,350,000
1. Regional Office IX 4,235,000
2. Isabela City District Engineering Office 4,235,000
3. Zamboanga City District Engineering Office 4,235,000
4. Zamboanga del Norte 1st District Engineering Office 4,235,000
5. Zamboanga del Norte 2nd District Engineering Office 4,235,000
6. Zamboanga del Norte 3rd District Engineering Office 4,235,000
7. Zamboanga del Sur 1st District Engineering Office 4,235,000
8. Zamboanga del Sur 2nd District Engineering Office 4,235,000
9. Zamboanga Sibugay 1st District Engineering Office 4,235,000
10. Zamboanga Sibugay 2nd District Engineering Office 4,235,000
B. Reoion X/300205100014000 55,055,000
o 1. Regional Office X
2. Bukidnon 1st District Engineering Office
4,235,000
4,235,000
3. Bukidnon 2nd District Engineering Office 4,235,000
4. Bukidnon 3rd District Engineering Office 4,235,000
5. Cagayan de Oro City 1st District Engineering Office 4,235,000
6. Cagayan de Oro City 2nd District Engineering Office 4,235,000
7. Camiguin District Engineering Office 4,235,000
8. Lanao del Norte 1st District Engineering Office 4,235,000
9. Lanao del Norte 2nd District Engineering Office 4,235,000
10. Misamis Occidentai 1st District Engineering Office 4,235,000
11. Misamis Occidental 2nd District Engineering Office 4,235,000
12. Misamis Oriental 1st District Engineering Office 4,235,000
B. Misamis Oriental 2nd District Engineering Office 4,235,000
'c. Reoion XI/300205100015000 38,115,000
1. Regional Office XI 4,235,000
2. Composteia Valley District Engineering Office 4,235,000
3. Davao City 2nd District Engineering Office 4,235,000
4. Davao City District Engineering Office 4,235,000
5. Davao dei Norte District Engineering Office 4,235,000
6. Davao del Sur District Engineering Office 4,235,000
7. Davao Occidental District Engineering Office 4,235,000
8. Davao Oriental 1st District Engineering Office 4,235,000
9. Davao Oriental 2nd District Engineering Office 4,235,000
Request for release of funds in the total amount of P2.15.9B5,OOO.OQfor the Rain Water Collectors in Public Fadlities
Page2of2
o
B. Del Rosario, Chief, Environmental and Social Safeguards Division (ESSD), and noted by Director
Constante A. Llanes, Jr., CESOIII, both in Planning Service.
This request for the release of funds is prepared by the Programming Division, Planning Service and
are recommended/approved by the concerned officials based on the Delegation of Authority under
the Department Order No. 220, Series of 2016.
It is understood that obligations/disbursements of the said funds shall be made in accordance with
the existing budgeting, accounting and auditing ruies and regulations.
Approved:
DIMAS S. SO U N, CE50 I
Undersecretary or .Mindanao Regional Operations
~
Cc: The Oire:tor,?anning S-"'I'Iice
TheDiv,sionChief,ESSD,P1anningServ;ce
4.1.3 AGV/LCG/PPRCJMQ-I
Fs36/18 February Z020
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CENTRAL OFFICE
Manila
TO GeNeVIEVE E. GIJAR!,~MA
Officer- In-Charge, Office of the Director
Finance Service
This Department
Please release to the following Regional/District Offices concerned, the total amount of
fl355,740,OOO.OO lor the R~inw~ter Colleclors In PubliC:f~dlities hi Regions: If CAR, II, Iii, Iv-A,
and V (see attached Annex "A"), to be charged against the appropriations for
Construction/Rehabilitation of Water Supply/Septage and Sewerage/Rain Water Collectors - Rain
Water Collectors in 'Public Facilities, comprehensively released to the Central Office, through
National Budget Circular No. 578 dated 06 January. 2020, FY 2020 General Appropriations Act
(GAA), R.A. 11465, as follows:
o B.
11. Pangasinan 4th District Engineering Office
Cordillera Administrative Reoion (CARl/300205100004000
4,235,000
4,235,000
55.055.000
1. CAR Regional Office 4,235,000
2. Abra District Engineering Office 4,235,000
}.ApQYQQ J.$t j)i$trirt fngill~rillg 0ffi>:S! 4.J35,DDD
4. Apayao 2nd District Engineering Office 4,235,000
5.. Baguio City District Engineering Office 4,235,000
6. Benguet 1st District Engineering Office 4,235,000
7. Benguet 2nd District engineering Office 4,235,000
8. Ifugao 1st District Engineering Office 4,235,000
9. Ifugao 2nd District Engineering Office 4,235,000
10. LowerKalinga District Engineering Office 4,235,000
11. MountainProvince 2nd District Engineering Office . 4,235,000
12. Mt. Province District Engineering Office 4,235,000
13. Upper Kalinga District Engineering Office 4,235,000
C. Reqion II/3002051000OS000 50.820.000
1. Regional Office II 4,235,000
2. Batanes District Engineering Office' 4,235,000
3. Cagayan 1st District Engineering Office 4,235,000
4. Cagayan'2nd 'District'Engineering 'Office 4;235;000
5. Cagayan 3rd District Engineering Office 4,235,000
6. Isabela 1st District Engineering Office 4,235,000
7. Isabela 2nd District Engineering Office 4,235,000
8. Isabela 3rd District Engineering-Office 4,235,000
9. Isabeia 4th District Enqineerinq Office 4.:,nS.nnn
I
/
/
Re::pest for release of funds in the total amount of P35S,740,OOO.OO for the Rain Water CoIiectors in PutlIic Fadllties
Page2of3
Re~u:stfor releOlse of funds in the total am:)unt of P3551740,OOO.OO for the Rain Water Colle:tors in Public Fa:ilities
Page30f3
The release is being .madeon the .basis.of the Ivlemorandum .dated .03 February 2020 of R()semarie
B. Del Rosarii>, Cnief, Environmelltal alld Social Safeguarcis Divisioll (ESSD), and Iloted by Director
Constante A. Llanes, Jr., CESOIII, both in Planning Service.
This request rer i'he release Gf Wiles is IOrelOar«fby t:!ie Pmgrammillg DivisiGIl, Plallilillg Serviee aile
are recommended/approved by the concerned officials based on the Delegation of Authority under
the Department Order No. 220, Series of 2016.
Recommended by:
o
Approved :
4.1.3 AGV/LCG/PPRC/MCM
Fs34/18 February 2020
ANNEX B
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<Insert Name of Office>
Region Project Type of Project Unit of City/Municipality X- y- Planned Start Duration Planned End Implementing
Component Work Component Measure Coordinate Coordinate Date (CDs) Date Office
Descriotion Cost Cmm/dd Cmm/dd
Region Construction of Construction <please enter Quirino District
II Rainwater of Rain Number of Engineering
Collection System Water unit per Office
(RWCS), <Insert Collector beneficiaries>
Name of
School>, <Insert
Citv/Municioalitv>
J-
DPWH BRIDGE ACCOMPLISHMENT (COMPLETED)
Jan 2016-Dec 2019
Funded under FY 2016-2019 GAA
REGIONAL SUMMARY
NATIONAL BRIDGES(NUMBER)
LOCAL
Construction of Rehabilitation/ Replacement of Replacement of Retrofitting /
REGION BRIDGES TOTAL
Bridge Widening New Permanent Major Repair of Bridges (Temporary Permanent Weak Strengthening of
(NUMBER)
Bridges Permanent Bridges to Permanent) Bridges Bridges
NOTE:
Data Is based on Project and Contract Management Applicarion (PCMA) and Project Monitoring System (PM5)
ANNEX C
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
<Insert Name of Office>
PROJECT PROFILE
RAINWATER COLLECrION SYSTEM
Scope of Work
Type of RWCS o Concrete o Steel Tank o Plastic Tank
Capacity/ liters
Consumption:
Consideration
Screening Questionnaire
o No gutter
o No downspout
o Others (please specify):
PROJECT PROFILE
RAINWATER COLLECTION SYSTEM
Supporting Documents
Prepared by:
Submitted by: