Professional Documents
Culture Documents
ANSWER ALL THE YELLOW BOXES. MAKE SURE TO MAXIMIZE SERVICE TO LOAD AND MINIMIZE THE COST.
TOTAL Q SCHED 980
TOTAL PROJ. LOAD 980
TOTAL Q COST 4835000
TOTAL DBC 62800000
OBJECTIVE 57965000
ANSWER ALL THE YELLOW BOXES. MAKE SURE TO MAXIMIZE SERVICE TO LOAD AND MINIMIZE THE COST.
TOTAL Q SCHED 60.00
TOTAL PROJ. LOAD 60.00
TOTAL Q COST 812,000.00
TOTAL DBC 5,538,000.00
OBJECTIVE 4,726,000.00