Process Design Basis Issued For Comments (Ifc) : Is Standard Format Available
Process Design Basis Issued For Comments (Ifc) : Is Standard Format Available
AVAILABLE - START
NO IS STANDARD YES
FORMAT
AVAILABLE
ADOPT STANDARD FORMAT WITH GENERATE WORD DOCUMENT. PROCESS DESIGN BASIS MAY
FOLLOWING HEADINGS INCLUDE BASIS FOR BUT NOT BE LIMITED TO:
1. ABBREVIATIONS & DEFINITIONS 1. DESIGN PRESSURE
2. INTRODUCTION 2. DESIGN TEMPERATURE
3. PROCESS DESCRIPTION 3. DESIGN OR MAXIMUM VELOCITIES FOR PIPING / PIPELINES
4. PROJECT SCOPE 4. NPSHA (PUMP HYDRAULICS)
5. DESIGN 5. FOULING FACTORS (HEAT EXCHANGERS)
6. DESIGN PHILOSOPHY 6. NOZZLE MOMENTUM VALUES (VESSELS / SEPARATORS)
7. DESIGN CRITERIA 7. PIPING ROUGHNESS VALUES
8. CODES & STANDARDS 8. OPERATION, CONTROL & SAFEGUARDING PHILOSOPHY
9. REFERENCES 9. ISOLATION PHILOSOPHY
10. LIST OF HOLDS 10. DRAIN PHILOSOPHY
11. APPENDICES 11. MATERIAL & CORROSION PHILOSOPHY
12. UTILITY REQUIREMENT & BATTERY LIMIT CONDITIONS FOR ISBL
13. CHEMICAL DOSING REQUIREMENT
14. FIRE, SMOKE & GAS DETECTION PHILOSOPHY
15. INSULATION REQUIREMENT
COMMENTS
1. BACK CHECK
2. SDC
REVISE TO NO COMMENTS
INCORPORATE
ISSUED FOR “IDC” IN FOLLOWING SEQUENCE
1. PIPING
2. C&A
3. MECHANICAL
4. ELECTRICAL
5. CIVIL
6. PIPELINE (IF APPLICABLE)
7. PROJECTS
YES
COMMENTS
1. REVISE TO INCORPORATE
IF IN AGREEMENT NO
2. DISCUSS TO REMOVE IF
NOT IN AGREEMENT
ISSUE TO CLIENT AS
“ISSUED FOR COMMENTS” (IFC)
PROCESS DESIGN BASIS
START
COMMENTS
CLIENT
REQUIREMENT
PIPING / e.g. MOC, INSULATION,
REVISE TO
PIPELINE ISOLATION, DRAIN INCORPORATE
PHILOSOPHY
e.g. CHANGED SOW, PROJECTS
e.g. CONTROL &
SAFEGUARGING CODES & STANDARDS
C&A
FIRE, SMOKE & GAS
DETECTION
1. BACK CHECK
2. “SDC”
YES
COMMENTS
NO
1. PIPING
2. C&A
3. MECHANICAL
4. ELECTRICAL
5. CIVIL
6. PIPELINE (IF APPLICABLE)
7. PROJECTS
YES
COMMENTS