CHECK LIST FOR ULTRASO
Instructions

 Instruct user (doctors and Technicians ) to Freeze the machine when not in use .
 Try to be there on site at the time of PM ( Preventive Maintenance ) till the time engineer left site.
Try to inspect Ultrasound room on routine basis for cleriness around machine
Try to instruct user to hang the probe properly
There should not be bundle of wires and probe connectors
Cleaning of Fan Filter
Locking of machine tyres
Screen down at the time of shipment from one dept to another
Machine put to sleep mode and during off time switched off
Competent staff to operate machine / Avoid multiple untrained users to use machine
FOR ULTRASOUND MACHINE / ECHO MACHINE
Benefit

We can control the unwanted firing of Crystals and increase the life time of Cardiac probe
We can learn how to open , Close , Diagnosoe and replacement of Ultrasound parts.
We can control breakdown of machine due to dust as Active and passive components 70% affact from dirt only.
Unnecessary and inproper hanging result in breakage of Transducer probe.
Matrix of cables around machine result in damage to connectors, probe cable .
Fan filter cleaning is mandatory to maintain ambiance temprature inside Echo mahcine
We can stop mechanical damage by 40% by locking machine on one place and unlock only at the time of cleaning
We can prevent damage to screen by folding down of screen as per the model
We can improve the effeciency of processor boards inside machine .
Try to provide customer orientation trainiing to staff by company /BME for max. utilization of features
Frequency

Daily basis
Quarterly basis
Daily basis
Weekly basis.
Weekly basis.
Weekly basis.
Weekly basis.
As and if Required.
Daily basis
Monthly Basis.