You are on page 1of 3

REPUBLIQUE DU CAMEROUN REPUBLIC OF CAMEROON

Paix-Travail-Patrie Peace-Work-Fatherland
****************************** ******************************
MINISTERE DES ENSEIGNEMENTS SECONDAIRES MINISTERY OF SECONDARY EDUCATION
***************************** ******************************
REGIONAL DELEGATION FOR THE CENTRE
.

DELEGATION REGIONALE POUR LE CENTRE ******************************


****************************** MFOUNDI DIVISIONAL DELEGATION
DELEGATION DEPARTEMENTALE DU MFOUNDI ******************************
******************************
LYCEE BILINGUE D’APPLICATION GOVERNMENT BILINGUAL PRACTISING HIGH
********************************* SCHOOL
*********************************
N°D’IMMATRICULATION : 5LHIGSBD112399092 IMMATRICULATION N°: 5LHIGSBD112399092
*********************************
TEL. : 222 22 43 57 BP. : 864-YAOUNDE *********************************
PHONE: 222 22 43 57- P.O BOX : 864-YAOUNDE.
DEPARTEMENT DE DEPARTMENT OF
TRAVAIL MANUEL Année scolaire  2019-2020 School Year MANUAL LABOUR

ANNUAL EDUCATIONAL PROJECT


Level IV: Form IV
Hourly volume per week: 02 hours
Annual hourly volume: 50 hours
GENERAL OBJECTIVES OF THE COURSE
1. To provide the student with the manual skill and sense of dignity of Manual labour.
2. Encourage learners to develop a taste for creation and a spirit of creativity.
3. Make learners effective professionals for the growth and emergence of our country.

DATE MODULES/AC COMPETENCES THEORETICAL PRACTICAL TEACHING PEOPLE EVALUATION


TIVITIES CONTENTS CONTENTS MATERIALS INVOLVED INDICATORS
From - Channeling water - Water channeling - Gutter installation - Masonry - Partners/Experts - Student tools
02/09/2019 LANDSCAPIN - Manufacture - Materials used in - Calculate dosages equipment - Supervisors - Compliance
To G AND blocks and bricks of masonry - Identify the - Sand, gravel, - Students with work
11/10/2019 MASONRY various shapes - The mason's tools moulds cement instructions
- Dosing and mixing of - Select the
- Quality of the
materials materials and mix
them
work done
- Mould the
bricks/blocks
From - Model and sculpt - Present and define the - Mixing colours - Partners/Experts - Student tools
14/09/2019 CRAFT a clay pot material -Prepare clays (mix Drawing and - Supervisors - Compliance
To INDUSTRY: - Concept of oil painting materials, model sculpture - Students with work

1/2
22/11/2019 Painting and - Concept of modelling and mould objects, equipment instructions
sculpture and moulding. decorate, sculpt, - Quality of the
-Concept of sculpture finish and dry work done
objects)
From MAINTENAN Make a simple - Piping in sanitary - Execution of - Partners/Experts - Student tools
25/11/2019 CE WORK : pipe connection installation various connection Sanitary - Supervisors - Compliance
To - Frequent breakdowns work installation - Students with work
(Maintenance of - Connection processes - Monitoring and
17/01/2020 sanitary material instructions
maintenance of a
installations and - Quality of the
piping network
work done
various piping - Determination of
systems) frequent failures and
security measures
From -Describe the - The choice of material - Physical choice - Carpenter's - Partners/Experts - Student tools
20/01/2020 CARPENTRY: object - The constitution of the of wood toolbox - Supervisors - Compliance
To Manufacture of an -Draw the object object - Tracing the - Wood and - Students with work
28/02/2020 orientation plate or - Identify the - The drawing of the elements other materials instructions
a simple sign object - Wood
necessary tools - Quality of the
- The function of the measurement and
and materials and work done
object sawing
specify their - The carpenter's tools - Assembly of the
respective parts
functions - Finishing of the
set
From AGRICULTU - Choose the site, -Characteristics of the Realization of the - Agricultural - Partners/Experts - Student tools
02/03/2020 RE : prepare the soil, soils to be used, climate, school's field plan, equipment - Supervisors - Compliance
To sow, maintain the preparatory work, species fertility test, soil - Root - Students with work
Crop to be sown, ridge/bush treatment, choice of
24/04/2020 production plantation, protect vegetable instructions
sowing, fertilizers, inputs, cultivation
(Production of the plantation, sell seeds - Quality of the
weeding, pests, market technique practice,
the product - Fertilizers work done
seed legumes) and costs. application of control
methods. - Insecticides
From
27/04/2020 GENERAL REVISIONS - FIXING OF COMPETENCES – END OF YEAR EVALUATION
To
08/05/2020

2/2
Done in Yaoundé, on the……………………………………
THE PEDAGOGICAL FACILITATOR THE VICE PRINCIPAL THE PRINCIPAL

3/2

You might also like