You are on page 1of 1

A B C D E F G H I J

STATUS OF DRAWING

DP.G4 - DISC09 TUTUP HOUSING BEARING CMT


1 Tutup Housing Bearing Bajak Besar Model CMT 1

Mat : Casting
Qty : 4 Pcs
BILL OF MATERIAL
No. Mark Description Mat'l Qty

1 DISC09 Tutup Housing Bearing Bajak Basar CMT Casting 4 Pcs

2 2

3
ISOMETRIK ISOMETRIK 3

TUTUP HOUSING BEARING TUTUP HOUSING BEARING

15 18 10 13 Note :
1. All Dimensions are in mm unless otherwise noted.

4 4

REV NO. DATE DESCRIPTION DWN CHK'D APP


0 13-03-2017 For Approval Eng - -

Drat 12 Gang
PEMBERI TUGAS

95 - 96
PT. LAMBANG JAYA

116
116

85

116
75

35

75

35
55

55

95
85
5 FINAL APPROVAL BY : 5

CHECKED BY APPROVED BY APPROVED BY

TANDA TANGAN:

NAMA Andri Supiandi


JABATAN Ops. Manager
TANGGAL

KONTRAKTOR

PT. LAMBANG JAYA


Steel Fabricator, Equipments Manufacturer Turn Key Plant Contractor
for Palm Oil Mill, Tapioca Starch Plant Office/Workshop

JL. Raya Hajimena No. 165 Km. 14 Natar - Lampung - Indonesia


6 6
30 DRAWN BY CHECKED BY APPROVED BY
47,63 TANDA TANGAN:

56 NAMA Changgi Pungky Ade Andri Supiandi


JABATAN Drafter Ka. Sie. Eng Ops. Manager
TANGGAL
PROYEK / PEKERJAAN

TAMPAK ATAS TAMPAK BAWAH BAJAK GAJAH 4 DISC


TAMPAK SAMPING TUTUP HOUSING BEARING
TUTUP HOUSING BEARING TUTUP HOUSING BEARING
JUDUL GAMBAR

7 DETAIL PART LEG DISC - 09 7


DP.G4 - DISC09
NO. GAMBAR 38 SCALE NTS

FILE GAMBAR

REFF. GAMBAR

A B C D E F G H I J

You might also like