Professional Documents
Culture Documents
Division: Biratnagar
Fiscal Year: 2020/2021(2077/2078)
Division Total
Link From Section Section Pavement
Length Link Section (Km) To (Km) Length (Km) Terrain Type
14.00 F05401-A 0.00 8.00 8.00 P STGB
F05401-B 11.00 14.00 3.00 P STGB
F05401-C 8.00 11.00 3.00 P STGB
19.00 F05601-A 0.00 19.00 19.00 P GR
28.00 F06001-A 0.00 19.35 19.35 P STGB
F06001-B 19.35 19.99 0.64 P STGB
F06001-C 19.99 25.00 5.01 P STGB
F06001-D 25.00 28.00 3.00 P STGB
7.66 F06002-A 28.00 35.66 7.66 P ER
1.73 F06002A-A 35.66 37.39 1.73 P ER
22.00 F06101-A 0.00 19.97 19.97 P GR
F06101-B 19.97 22.00 2.03 P ER
30.00 F06102-A 22.00 24.80 2.80 P STGB
F06102-B 24.80 35.10 10.30 P ER
F06102-C 35.10 52.00 16.90 P GR
23.00 F06201-A 0.00 4.98 4.98 P STGB
F06201-B 4.98 23.00 18.02 P STGB
9.95 F06301-A 0.00 7.99 7.99 P STGB
F06301-B 7.99 9.95 1.96 P GR
10.54 F06301A-A 11.22 20.49 9.27 P GR
F06301A-B 9.95 11.22 1.27 P GR
2.60 F21001-A 0.00 2.60 2.60 P STGB
26.11 NH01-006-A 54.75 63.45 8.70 P STGB
NH01-006-B 63.45 70.45 7.00 P STGB
NH01-006-C 70.45 80.86 10.41 P STGB
10.19 NH01-007-A 80.86 81.00 0.14 P AMGB
NH01-007-B 81.00 90.00 9.00 P AMGB
NH01-007-C 90.00 91.05 1.05 P AMGB
1.35 NH01-008-A 91.05 92.40 1.35 P AMGB
15.24 NH01-009-A 101.64 107.64 6.00 P AMGB
NH01-009-B 92.40 101.64 9.24 P AMGB
3.41 NH01-010-A 107.64 111.05 3.41 P AMGB
23.88 NH01-011-A 111.05 130.00 18.95 P AMGB
NH01-011-B 130.00 134.93 4.93 P STGB
6.02 NH01-012-A 134.93 140.95 6.02 P AMGB
18.41 NH05-003-A 47.97 66.38 18.41 P STGB
23.24 NH05-004-A 66.38 67.23 0.85 P STGB
NH05-004-B 67.23 77.05 9.82 P STGB
NH05-004-C 77.05 81.90 4.85 P STGB
NH05-004-D 81.90 83.86 1.96 P STGB
NH05-004-E 83.86 85.79 1.93 P STGB
NH05-004-F 85.79 87.47 1.68 P STGB
NH05-004-G 87.47 89.16 1.69 P STGB
NH05-004-H 89.16 89.45 0.29 P STGB
NH05-004-I 89.45 89.62 0.17 P STGB
33.16 NH05-005-A 102.32 105.71 3.39 P GR
NH05-005-B 105.71 109.68 3.97 P GR
NH05-005-C 109.68 109.70 0.02 P ER
NH05-005-D 109.70 109.73 0.03 P GR
NH05-005-E 109.73 109.82 0.09 P ER
NH05-005-F 109.82 109.86 0.04 P GR
NH05-005-G 109.86 110.05 0.19 P ER
NH05-005-H 110.05 110.16 0.11 P GR
NH05-005-I 110.16 114.67 4.51 P ER
NH05-005-J 114.67 116.25 1.58 P STGB
NH05-005-K 116.25 116.46 0.21 P ER
NH05-005-M 122.19 122.78 0.59 P AMGB
NH05-005-N 89.62 94.01 4.39 P STGB
NH05-005-O 94.01 94.43 0.42 P STGB
NH05-005-P 94.43 95.08 0.65 P STGB
NH05-005-Q 95.08 95.64 0.56 P GR
NH05-005-R 95.64 102.32 6.68 P GR
4.64 NH06-001-A 0.00 4.64 4.64 H GR
10.72 NH07-004-A 55.20 65.92 10.72 P STGB
6.64 NH08-001-A 0.00 4.00 4.00 P STGB
NH08-001-B 4.00 6.64 2.64 P STGB
1.58 NH08-002-A 6.64 7.20 0.56 P STGB
NH08-002-B 7.20 8.22 1.02 P STGB
8.25 NH08-003-A 8.22 16.46 8.24 P STGB
11.61 NH08-004-A 16.46 28.07 11.61 P STGB
11.09 NH08-005-A 28.07 39.16 11.09 P STGB
10.13 NH08-006-A 39.16 49.29 10.13 P STGB
12.32 NH08-007-A 49.29 54.67 5.38 H STGB
NH08-007-B 54.67 61.61 6.94 H STGB
1.61 NH09-005-A 85.28 86.89 1.61 P ER
18.80 NH09-007-A 131.24 135.24 4.00 P STGB
NH09-007-B 135.24 150.04 14.80 P GR
Pavement No of RM Length Skilled Labour Unskilled Labour
Width (m) Lanes Lane factor (Km) Rate (NRs/Day) Rate (NRs/Day)
4.80 1 1.00 8.00 663.17 586.77
4.80 1 1.00 3.00 663.17 586.77
4.80 1 1.00 3.00 663.17 586.77
5.60 1 1.00 19.00 663.17 586.77
5.50 1 1.00 19.35 663.17 586.77
5.50 1 1.00 0.64 663.17 586.77
5.50 1 1.00 5.01 663.17 586.77
5.50 1 1.00 3.00 663.17 586.77
5.00 1 1.00 7.66 663.17 586.77
5.00 1 1.00 1.73 663.17 586.77
4.50 1 1.00 19.97 663.17 586.77
4.50 1 1.00 2.03 663.17 586.77
4.50 1 1.00 2.80 663.17 586.77
4.50 1 1.00 10.30 663.17 586.77
4.50 1 1.00 16.90 663.17 586.77
6.80 1 1.00 4.98 663.17 586.77
6.80 1 1.00 18.02 663.17 586.77
6.20 1 1.00 7.99 663.17 586.77
4.00 1 1.00 1.96 663.17 586.77
4.00 1 1.00 9.27 663.17 586.77
4.00 1 1.00 1.27 663.17 586.77
3.50 1 1.00 2.60 663.17 586.77
7.20 2 1.00 8.70 663.17 586.77
7.20 2 1.00 7.00 663.17 586.77
7.20 2 1.00 10.41 663.17 586.77
7.20 2 1.00 0.14 663.17 586.77
7.20 2 1.00 9.00 663.17 586.77
7.20 2 1.00 1.05 663.17 586.77
7.20 2 1.00 1.35 663.17 586.77
7.20 2 1.00 6.00 663.17 586.77
7.20 2 1.00 9.24 663.17 586.77
7.20 2 1.00 3.41 663.17 586.77
7.20 2 1.00 18.95 663.17 586.77
7.20 2 1.00 4.93 663.17 586.77
7.20 2 1.00 6.02 663.17 586.77
4.55 1 1.00 18.41 663.17 586.77
6.00 1 1.00 0.85 663.17 586.77
6.00 1 1.00 9.82 663.17 586.77
6.00 1 1.00 4.85 663.17 586.77
6.00 1 1.00 1.96 663.17 586.77
6.00 1 1.00 1.93 663.17 586.77
6.00 1 1.00 1.68 663.17 586.77
6.00 1 1.00 1.69 663.17 586.77
6.80 1 1.00 0.29 663.17 586.77
7.33 2 1.00 0.17 663.17 586.77
4.00 1 1.00 3.39 663.17 586.77
4.00 1 1.00 3.97 663.17 586.77
4.50 1 1.00 0.02 663.17 586.77
4.00 1 1.00 0.03 663.17 586.77
4.50 1 1.00 0.09 663.17 586.77
4.00 1 1.00 0.04 663.17 586.77
4.50 1 1.00 0.19 663.17 586.77
4.00 1 1.00 0.11 663.17 586.77
4.50 1 1.00 4.51 663.17 586.77
6.20 1 1.00 1.58 663.17 586.77
4.50 1 1.00 0.21 663.17 586.77
7.20 2 1.00 0.59 663.17 586.77
7.33 2 1.00 4.39 663.17 586.77
7.33 2 1.00 0.42 663.17 586.77
7.33 2 1.00 0.65 663.17 586.77
4.50 1 1.00 0.56 663.17 586.77
4.50 1 1.00 6.68 663.17 586.77
4.74 1 1.00 4.64 663.17 586.77
3.50 1 1.00 10.72 663.17 586.77
7.33 2 1.00 4.00 663.17 586.77
7.33 2 1.00 2.64 663.17 586.77
7.33 2 1.00 0.56 663.17 586.77
7.33 2 1.00 1.02 663.17 586.77
7.75 2 1.00 8.24 663.17 586.77
8.00 2 1.00 11.61 663.17 586.77
7.64 2 1.00 11.09 663.17 586.77
7.50 2 1.00 10.13 663.17 586.77
5.83 1 1.00 5.38 663.17 586.77
5.83 1 1.00 6.94 663.17 586.77
5.00 1 1.00 1.61 663.17 586.77
5.50 1 1.00 4.00 663.17 586.77
3.50 1 1.00 14.80 663.17 586.77
421.14
Labour Quantity Qyantity Skilled Labour Quantity Skilled Labour Unskilled Labour
(MD/Km/D) (MD/Km/D) Quantity (MD/Yr) (MD/Yr) Cost (NRs '000) Cost (NRs '000)
0.05 0.20 146.00 584.00 96.82 342.67
0.05 0.20 54.75 219.00 36.31 128.50
0.05 0.20 54.75 219.00 36.31 128.50
0.05 0.20 346.75 1387.00 229.95 813.85
0.05 0.20 353.14 1412.55 234.19 828.84
0.05 0.20 11.68 46.72 7.75 27.41
0.05 0.20 91.43 365.73 60.64 214.60
0.05 0.20 54.75 219.00 36.31 128.50
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.05 0.20 364.45 1457.81 241.69 855.40
0.00 0.00 0.00 0.00 0.00 0.00
0.05 0.20 51.10 204.40 33.89 119.94
0.00 0.00 0.00 0.00 0.00 0.00
0.05 0.20 308.43 1233.70 204.54 723.90
0.05 0.20 90.89 363.54 60.27 213.31
0.05 0.20 328.87 1315.46 218.09 771.87
0.05 0.20 145.82 583.27 96.70 342.25
0.05 0.20 35.77 143.08 23.72 83.96
0.05 0.20 169.18 676.71 112.19 397.07
0.05 0.20 23.18 92.71 15.37 54.40
0.05 0.20 47.45 189.80 31.47 111.37
0.05 0.20 158.78 635.10 105.29 372.66
0.05 0.20 127.75 511.00 84.72 299.84
0.05 0.20 189.98 759.93 125.99 445.90
0.05 0.20 2.56 10.22 1.69 6.00
0.05 0.20 164.25 657.00 108.93 385.51
0.05 0.20 19.16 76.65 12.71 44.98
0.05 0.20 24.64 98.55 16.34 57.83
0.05 0.20 109.50 438.00 72.62 257.01
0.05 0.20 168.63 674.52 111.83 395.79
0.05 0.20 62.23 248.93 41.27 146.06
0.05 0.20 345.84 1383.35 229.35 811.71
0.05 0.20 89.97 359.89 59.67 211.17
0.05 0.20 109.87 439.46 72.86 257.86
0.05 0.20 335.98 1343.93 222.81 788.58
0.05 0.20 15.51 62.05 10.29 36.41
0.05 0.20 179.22 716.86 118.85 420.63
0.05 0.20 88.51 354.05 58.70 207.75
0.05 0.20 35.77 143.08 23.72 83.96
0.05 0.20 35.22 140.89 23.36 82.67
0.05 0.20 30.66 122.64 20.33 71.96
0.05 0.20 30.84 123.37 20.45 72.39
0.05 0.20 5.29 21.17 3.51 12.42
0.05 0.20 3.10 12.41 2.06 7.28
0.05 0.20 61.87 247.47 41.03 145.21
0.05 0.20 72.45 289.81 48.05 170.05
0.00 0.00 0.00 0.00 0.00 0.00
0.05 0.20 0.55 2.19 0.36 1.29
0.00 0.00 0.00 0.00 0.00 0.00
0.05 0.20 0.73 2.92 0.48 1.71
0.00 0.00 0.00 0.00 0.00 0.00
0.05 0.20 2.01 8.03 1.33 4.71
0.00 0.00 0.00 0.00 0.00 0.00
0.05 0.20 28.84 115.34 19.12 67.68
0.00 0.00 0.00 0.00 0.00 0.00
0.05 0.20 10.77 43.07 7.14 25.27
0.05 0.20 80.12 320.47 53.13 188.04
0.05 0.20 7.67 30.66 5.08 17.99
0.05 0.20 11.86 47.45 7.87 27.84
0.05 0.20 10.22 40.88 6.78 23.99
0.05 0.20 121.91 487.64 80.85 286.13
0.05 0.33 84.68 558.89 56.16 327.94
0.05 0.20 195.64 782.56 129.74 459.18
0.05 0.20 73.00 292.00 48.41 171.34
0.05 0.20 48.18 192.72 31.95 113.08
0.05 0.20 10.22 40.88 6.78 23.99
0.05 0.20 18.62 74.46 12.34 43.69
0.05 0.20 150.38 601.52 99.73 352.95
0.05 0.20 211.88 847.53 140.51 497.31
0.05 0.20 202.39 809.57 134.22 475.03
0.05 0.20 184.87 739.49 122.60 433.91
0.05 0.33 98.19 648.02 65.11 380.24
0.05 0.33 126.66 835.92 83.99 490.49
0.00 0.00 0.00 0.00 0.00 0.00
0.05 0.20 73.00 292.00 48.41 171.34
0.05 0.20 270.10 1080.40 179.12 633.95
7168.42 29478.42 4,753.88 17,297.05
Cost (NRs ER Cost Cost (NRs Cost (NRs Labour Cost) (@1.7% of Labour)
'000) (NRs/Km) '000) '000) (NRs '000) (NRs '000)
439.50 439.50 35.16 7.47
164.81 164.81 13.18 2.80
164.81 164.81 13.18 2.80
1,043.80 1,043.80 83.50 17.74
1,063.03 1,063.03 85.04 18.07
35.16 35.16 2.81 0.60
275.23 275.23 22.02 4.68
164.81 164.81 13.18 2.80
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1,097.09 1,097.09 87.77 18.65
0.00 0.00 0.00 0.00 0.00 0.00
153.82 153.82 12.31 2.62
0.00 0.00 0.00 0.00 0.00 0.00
928.44 928.44 74.27 15.78
273.59 273.59 21.89 4.65
989.97 989.97 79.20 16.83
438.95 438.95 35.12 7.46
107.68 107.68 8.61 1.83
509.27 509.27 40.74 8.66
69.77 69.77 5.58 1.19
142.84 142.84 11.43 2.43
477.95 477.95 38.24 8.13
384.56 384.56 30.76 6.54
571.89 571.89 45.75 9.72
7.69 7.69 0.62 0.13
494.43 494.43 39.55 8.41
57.68 57.68 4.61 0.98
74.17 74.17 5.93 1.26
329.62 329.62 26.37 5.60
507.62 507.62 40.61 8.63
187.34 187.34 14.99 3.18
1,041.06 1,041.06 83.28 17.70
270.84 270.84 21.67 4.60
330.72 330.72 26.46 5.62
1,011.39 1,011.39 80.91 17.19
46.70 46.70 3.74 0.79
539.48 539.48 43.16 9.17
266.44 266.44 21.32 4.53
107.68 107.68 8.61 1.83
106.03 106.03 8.48 1.80
92.29 92.29 7.38 1.57
92.84 92.84 7.43 1.58
15.93 15.93 1.27 0.27
9.34 9.34 0.75 0.16
186.24 186.24 14.90 3.17
218.10 218.10 17.45 3.71
0.00 0.00 0.00 0.00 0.00 0.00
1.65 1.65 0.13 0.03
0.00 0.00 0.00 0.00 0.00 0.00
2.20 2.20 0.18 0.04
0.00 0.00 0.00 0.00 0.00 0.00
6.04 6.04 0.48 0.10
0.00 0.00 0.00 0.00 0.00 0.00
86.80 86.80 6.94 1.48
0.00 0.00 0.00 0.00 0.00 0.00
32.41 32.41 2.59 0.55
241.17 241.17 19.29 4.10
23.07 23.07 1.85 0.39
35.71 35.71 2.86 0.61
30.76 30.76 2.46 0.52
366.98 366.98 29.36 6.24
384.10 384.10 30.73 6.53
588.93 588.93 47.11 10.01
219.75 219.75 17.58 3.74
145.03 145.03 11.60 2.47
30.76 30.76 2.46 0.52
56.04 56.04 4.48 0.95
452.68 452.68 36.21 7.70
637.82 637.82 51.03 10.84
609.25 609.25 48.74 10.36
556.51 556.51 44.52 9.46
445.35 445.35 35.63 7.57
574.49 574.49 45.96 9.77
0.00 0.00 0.00 0.00 0.00 0.00
219.75 219.75 17.58 3.74
813.07 813.07 65.05 13.82
22,050.93 0.00 22,050.93 1,764.07 374.87
of Labour Cost) of Labour Cost) (@ 9% of labour labour cost) (NRs Cost (NRs
(NRs '000) (NRs) cost) (NRs '000) '000) '000)
4.39 1.32 39.55 13.18 101.08
1.65 0.49 14.83 4.94 37.91
1.65 0.49 14.83 4.94 37.91
10.44 3.13 93.94 31.31 240.07
10.63 3.19 95.67 31.89 244.50
0.35 0.11 3.16 1.05 8.09
2.75 0.83 24.77 8.26 63.30
1.65 0.49 14.83 4.94 37.91
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
10.97 3.29 98.74 32.91 252.33
0.00 0.00 0.00 0.00 0.00
1.54 0.46 13.84 4.61 35.38
0.00 0.00 0.00 0.00 0.00
9.28 2.79 83.56 27.85 213.54
2.74 0.82 24.62 8.21 62.92
9.90 2.97 89.10 29.70 227.69
4.39 1.32 39.51 13.17 100.96
1.08 0.32 9.69 3.23 24.77
5.09 1.53 45.83 15.28 117.13
0.70 0.21 6.28 2.09 16.05
1.43 0.43 12.86 4.29 32.85
4.78 1.43 43.02 14.34 109.93
3.85 1.15 34.61 11.54 88.45
5.72 1.72 51.47 17.16 131.54
0.08 0.02 0.69 0.23 1.77
4.94 1.48 44.50 14.83 113.72
0.58 0.17 5.19 1.73 13.27
0.74 0.22 6.67 2.22 17.06
3.30 0.99 29.67 9.89 75.81
5.08 1.52 45.69 15.23 116.75
1.87 0.56 16.86 5.62 43.09
10.41 3.12 93.70 31.23 239.44
2.71 0.81 24.38 8.13 62.29
3.31 0.99 29.76 9.92 76.07
10.11 3.03 91.03 30.34 232.62
0.47 0.14 4.20 1.40 10.74
5.39 1.62 48.55 16.18 124.08
2.66 0.80 23.98 7.99 61.28
1.08 0.32 9.69 3.23 24.77
1.06 0.32 9.54 3.18 24.39
0.92 0.28 8.31 2.77 21.23
0.93 0.28 8.36 2.79 21.35
0.16 0.05 1.43 0.48 3.66
0.09 0.03 0.84 0.28 2.15
1.86 0.56 16.76 5.59 42.83
2.18 0.65 19.63 6.54 50.16
0.00 0.00 0.00 0.00 0.00
0.02 0.00 0.15 0.05 0.38
0.00 0.00 0.00 0.00 0.00
0.02 0.01 0.20 0.07 0.51
0.00 0.00 0.00 0.00 0.00
0.06 0.02 0.54 0.18 1.39
0.00 0.00 0.00 0.00 0.00
0.87 0.26 7.81 2.60 19.96
0.00 0.00 0.00 0.00 0.00
0.32 0.10 2.92 0.97 7.45
2.41 0.72 21.71 7.24 55.47
0.23 0.07 2.08 0.69 5.31
0.36 0.11 3.21 1.07 8.21
0.31 0.09 2.77 0.92 7.08
3.67 1.10 33.03 11.01 84.41
3.84 1.15 34.57 11.52 88.34
5.89 1.77 53.00 17.67 135.45
2.20 0.66 19.78 6.59 50.54
1.45 0.44 13.05 4.35 33.36
0.31 0.09 2.77 0.92 7.08
0.56 0.17 5.04 1.68 12.89
4.53 1.36 40.74 13.58 104.12
6.38 1.91 57.40 19.13 146.70
6.09 1.83 54.83 18.28 140.13
5.57 1.67 50.09 16.70 128.00
4.45 1.34 40.08 13.36 102.43
5.74 1.72 51.70 17.23 132.13
0.00 0.00 0.00 0.00 0.00
2.20 0.66 19.78 6.59 50.54
8.13 2.44 73.18 24.39 187.01
220.51 66.15 1,984.58 661.53 5,071.71
Total Estimate Cost Per Km Include/Exclu
(NRs '000) (NRs '000) de Reason for Not Including
540.58 67.57 1
202.72 67.57 1
202.72 67.57 1
1,283.88 67.57 1
1,307.53 67.57 1
43.25 67.57 1
338.54 67.57 1
202.72 67.57 1
0.00 0.00 1
0.00 0.00 1
1,349.42 67.57 1
0.00 0.00 1
189.20 67.57 1
0.00 0.00 1
1,141.98 67.57 1
336.51 67.57 1
1,217.66 67.57 1
539.90 67.57 1
132.44 67.57 1
626.40 67.57 1
85.82 67.57 1
175.69 67.57 1
587.88 67.57 1
473.01 67.57 1
703.43 67.57 1
9.46 67.57 1
608.15 67.57 1
70.95 67.57 1
91.22 67.57 1
405.44 67.57 1
624.37 67.57 1
230.42 67.57 1
1,280.50 67.57 1
333.13 67.57 1
406.79 67.57 1
1,244.01 67.57 1
57.44 67.57 1
663.56 67.57 1
327.73 67.57 1
132.44 67.57 1
130.42 67.57 1
113.52 67.57 1
114.20 67.57 1
19.60 67.57 1
11.49 67.57 1
229.07 67.57 1
268.26 67.57 1
0.00 0.00 1
2.03 67.57 1
0.00 0.00 1
2.70 67.57 1
0.00 0.00 1
7.43 67.57 1
0.00 0.00 1
106.76 67.57 1
0.00 0.00 1
39.87 67.57 1
296.64 67.57 1
28.38 67.57 1
43.92 67.57 1
37.84 67.57 1
451.38 67.57 1
472.44 101.82 1
724.38 67.57 1
270.29 67.57 1
178.39 67.57 1
37.84 67.57 1
68.92 67.57 1
556.80 67.57 1
784.52 67.57 1
749.38 67.57 1
684.51 67.57 1
547.78 101.82 1
706.62 101.82 1
0.00 0.00 1
270.29 67.57 1
1,000.07 67.57 1
27,122.65 1
Link
RSDPOStatus Notes
2009-10 STYPM
Completed
Postal : PHP II, RBN II
and PHP 2014/015 (5th
Yr)
Completed and PHP II, RBN
2014/015 (5th Yr)
RSDPAF 2011-12 SYPM 0
Completed
0
RBN 2015/016 (6th Yr)
0
0
0
PHP I
PHP I
PHP I on going project
0
RSDPAF 2010-11 FYPM 0
Completed, RBN 2014/015
RSDPAF 2010-11 FYPM (5th Yr)
Completed
Postal P II
Postal : PHP II
Postal : PHP II
Postal : PHP II
0
RBN 2020 Budget
RSDPAF 2012-13 TYPM Ongoing
0
RBN 2020 Budget
RBN 2018-19 ongoing
0
0
RBN 2020 Budget
RBN 2017 Reseal
RBN 2020 Budget
RBN 2020 Budget
RBN 2020 Budget
RBN 2014/015 (5th Yr) Not Done
Postal : PHP II
0
0
0
RBN 2015/016 (6th Yr)
0
RBN 2014/015 (5th Yr)
RBN 2014/015
RSDPAF (5thFYPM
2010-11 Yr)
Completed
Completed and ACQMP, RBN
2014/015 (5th Yr)
Postal : PHP II
Postal : PHP II
Postal : PHP II
Postal : PHP II
Postal : PHP II
Postal : PHP II
Postal : PHP II
Postal : PHP II
Postal : PHP II
Postal P II
Postal : PHP II
Completed and ACQMP, RBN 0
2014/015 (5th Yr)STYPM
RSDPO 2009-10
Completed
Completed and
and ACQMP
ACQMP, RBN
2014/015 (5th Yr)
0
Postal : PHP II
0
RSDPAF 2012-13 TYPM ongoing 0
and ACQMP
RSDPO 2009-10 STYPM
Completed
Completed and
and ACQMP
ACQMP, RBN
2014/015 (5th Yr)
RSDPO 2009-10 STYPM
Completed and ACQMP
ACQMP PROJECT
ACQMP PROJECT
ACQMP PROJECT
RBN 20202011-12
RSDPAF Budget SYPM
Completed
0
RSDPAF 2011-12 SYPM 0
Completed and ACQMP
ACQMP PROJECT