Periodic Maintenance

Division: Biratnagar
Fiscal Year: 2020/2021(2077/2078)

From Length Pavement From


Link Code Link Name (Km) To (Km) (Km) Type (Km)
F05401 Duhabi (KRM)-Inarwa 0.00 8.00 8.00 STGB 0.00
8.00 11.00 3.00 STGB 0.00
11.00 14.00 3.00 STGB 0.00
F06001 Bardanga-Urlabari (MRM) 0.00 19.35 19.35 STGB 0.00
19.35 19.99 0.64 STGB 0.00
19.99 25.00 5.01 STGB 0.00
25.00 28.00 3.00 STGB 0.00
F06102 Kanepokhari-Dandagaun 22.00 24.80 2.80 STGB 0.00
F06201 Ghinaghat (MRM)-Biratchok 0.00 4.98 4.98 STGB 0.00
4.98 23.00 18.02 STGB 0.00
F06301 Inerwa (MRM)-Kaptanganj
Pakli - Chatara Ghat (Koshi 0.00 7.99 7.99 STGB 0.00
F21001 Bridge) 0.00 2.60 2.60 STGB 0.00
NH01-006 Mawa-Harichamod 54.75 63.45 8.70 STGB 0.00
63.45 70.45 7.00 STGB 0.00
70.45 80.86 10.41 STGB 0.00
NH01-007 Harichamod-Budhi Khola 80.86 81.00 0.14 AMGB 0.00
81.00 90.00 9.00 AMGB 0.00
90.00 91.05 1.05 AMGB 0.00
NH01-008 Budhi Khola-Itahari 91.05 92.40 1.35 AMGB 0.00
NH01-009 Itahari-Sakhawa Gachhi 92.40 101.64 9.24 AMGB 0.00
Sakhawa Gachhi-Sunsari 101.64 107.64 6.00 AMGB 0.00
NH01-010 bridge 107.64 111.05 3.41 AMGB 0.00
NH01-011 Sunsari bridge-Koshi Barrage 111.05 130.00 18.95 AMGB 0.00
130.00 134.93 4.93 STGB 0.00
NH01-012 Koshi Barrage-Bharadaha 134.93 140.95 6.02 AMGB 0.00
NH05-003 Ratuwa Nadi - Rangeli 47.97 66.38 18.41 STGB 0.00
NH05-004 Rangeli - Biratnagar 66.38 67.23 0.85 STGB 0.00
67.23 77.05 9.82 STGB 0.00
77.05 81.90 4.85 STGB 0.00
81.90 83.86 1.96 STGB 0.00
83.86 85.79 1.93 STGB 0.00
85.79 87.47 1.68 STGB 0.00
87.47 89.16 1.69 STGB 0.00
89.16 89.45 0.29 STGB 0.00
89.45 89.62 0.17 STGB 0.00
NH05-005 Biratnagar - Laukahi 122.19 122.78 0.59 AMGB 0.00
89.62 94.01 4.39 STGB 0.00
94.01 94.43 0.42 STGB 0.00
94.43 95.08 0.65 STGB 0.00
114.67 116.25 1.58 STGB 0.00
NH07-004 Kalabanjar - Chatara 55.20 65.92 10.72 STGB 0.00
NH08-001 Rani (IB) - Biratnagar 0.00 4.00 4.00 STGB 0.00
4.00 6.64 2.64 STGB 0.00
NH08-002 Biratnagar - Kanchanbari 6.64 7.20 0.56 STGB 0.00
7.20 8.22 1.02 STGB 0.00
NH08-003 Kanchanbari - Duhabi 8.22 16.46 8.24 STGB 0.00
NH08-004 Duhabi - Itahari 16.46 28.07 11.61 STGB 0.00
NH08-005 Itahari - Seuti bridge 28.07 39.16 11.09 STGB 0.00
NH08-006 Seuti bridge -Base Camp 39.16 49.29 10.13 STGB 0.00
NH08-007 Base Camp - Bhedetar 49.29 54.67 5.38 STGB 0.00
54.67 61.61 6.94 STGB 0.00
NH09-007 Dharan - Chatara 131.24 135.24 4.00 STGB 0.00
Total
Section Length Pavement Pavement Area Volumn Last surfacing
To (Km) (Km) Width (m) (sqm) Terrain Group surfacing (Year)
0.00 0.00 4.80 0.00 P High 2011 9
0.00 0.00 4.80 0.00 P High 2015 5
0.00 0.00 4.80 0.00 P High 2015 5
0.00 0.00 5.50 0.00 P High 2013 7
0.00 0.00 5.50 0.00 P High 2016 4
0.00 0.00 5.50 0.00 P High 2016 4
0.00 0.00 5.50 0.00 P High 2016 4
0.00 0.00 4.50 0.00 P Moderate 9999 0
0.00 0.00 6.80 0.00 P High 2015 5
0.00 0.00 6.80 0.00 P High 2012 8
0.00 0.00 6.20 0.00 P Low 2012 8
0.00 0.00 3.50 0.00 P Low 9999 0
0.00 0.00 7.20 0.00 P High 2020 0
0.00 0.00 7.20 0.00 P High 2014 6
0.00 0.00 7.20 0.00 P High 2016 4
0.00 0.00 7.20 0.00 P High 2020 0
0.00 0.00 7.20 0.00 P High 2019 1
0.00 0.00 7.20 0.00 P High 2009 11
0.00 0.00 7.20 0.00 P High 2009 11
0.00 0.00 7.20 0.00 P High 2017 3
0.00 0.00 7.20 0.00 P High 2020 0
0.00 0.00 7.20 0.00 P High 2020 0
0.00 0.00 7.20 0.00 P High 2020 0
0.00 0.00 7.20 0.00 P High 2020 0
0.00 0.00 7.20 0.00 P High 2010 10
0.00 0.00 4.55 0.00 P High 2008 12
0.00 0.00 6.00 0.00 P High 2008 12
0.00 0.00 6.00 0.00 P High 2016 4
0.00 0.00 6.00 0.00 P High 2008 12
0.00 0.00 6.00 0.00 P High 2016 4
0.00 0.00 6.00 0.00 P High 2016 4
0.00 0.00 6.00 0.00 P High 2015 5
0.00 0.00 6.00 0.00 P High 2015 5
0.00 0.00 6.80 0.00 P High 2012 8
0.00 0.00 7.33 0.00 P High 2015 5
0.00 0.00 7.20 0.00 P High 2009 11
0.00 0.00 7.33 0.00 P High 2015 5
0.00 0.00 7.33 0.00 P High 2011 9
0.00 0.00 7.33 0.00 P High 2015 5
0.00 0.00 6.20 0.00 P Low 2012 8
0.00 0.00 3.50 0.00 P Low 9999 0
0.00 0.00 7.33 0.00 P High 2014 6
0.00 0.00 7.33 0.00 P High 2011 9
0.00 0.00 7.33 0.00 P High 2015 5
0.00 0.00 7.33 0.00 P High 2011 9
0.00 0.00 7.75 0.00 P High 2010 10
0.00 0.00 8.00 0.00 P High 2011 9
0.00 0.00 7.64 0.00 P High 2011 9
0.00 0.00 7.50 0.00 P High 2020 0
0.00 0.00 5.83 0.00 H High 2013 7
0.00 0.00 5.83 0.00 H High 2013 7
0.00 0.00 5.50 0.00 P Moderate 2013 7
0.00 0.00
Road Maintenance Correction A+ACF)in resealing Option Rate ( NRs
Condition cycle (Years) Factor years now? (SD/AC) /sqm)
Fair 6 0 6 Yes SD 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 No 0.00
Good 6 2 8 No 0.00
Good 6 2 8 No 0.00
Good 6 2 8 No 0.00
Good 6 2 8 No 0.00
Good 7 2 9 No 0.00
Good 6 2 8 No 0.00
Good 6 2 8 Yes SD 0.00
Fair 8 0 8 Yes SD 0.00
Good 8 2 10 No 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 Yes SD 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 Yes AC 0.00
Fair 6 0 6 Yes AC 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 Yes AC 0.00
Fair 6 0 6 Yes SD 0.00
Good 6 2 8 Yes SD 0.00
Good 6 2 8 No 0.00
Good 6 2 8 Yes SD 0.00
Good 6 2 8 No 0.00
Good 6 2 8 No 0.00
Good 6 2 8 No 0.00
Good 6 2 8 No 0.00
Good 6 2 8 Yes SD 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 Yes AC 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 Yes SD 0.00
Fair 6 0 6 No 0.00
Fair 8 0 8 Yes SD 0.00
Good 8 2 10 No 0.00
Fair 6 0 6 Yes SD 0.00
Fair 6 0 6 Yes SD 0.00
Fair 6 0 6 No 0.00
Fair 6 0 6 Yes SD 0.00
Fair 6 0 6 Yes SD 0.00
Fair 6 0 6 Yes SD 0.00
Fair 6 0 6 Yes SD 0.00
Fair 6 0 6 No 0.00
Fair 5 0 5 Yes SD 0.00
Fair 5 0 5 Yes SD 0.00
Fair 7 0 7 Yes SD 0.00
Total Cost (NRs Contingency @5% VAT @ 13% (NRs Total Estimated
'000) (NRs '000 ) '000) Cost (NRs '000)
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
Remarks Status
RSDPOof2009-10
Pavement
STYPM Completed
and PHP II
RSDPO 2009-10 STYPM Completed
and PHP II, RBN 2014/015 (5th Yr)
Postal : PHP II, RBN 2014/015 (5th Yr)
RSDPAF 2011-12 SYPM Completed
0
RBN 2015/016 (6th Yr)
0
PHP I on going
RSDPAF project
2010-11 FYPM Completed,
RBN 2014/015 (5th Yr)
RSDPAF 2010-11 FYPM Completed
Postal P II
0
RBN 2020 Budget
RSDPAF 2012-13 TYPM Ongoing
0
RBN 2020 Budget
RBN 2018-19 ongoing
0
0
RBN 2017 Reseal
RBN 2020 Budget
RBN 2020 Budget
RBN 2020 Budget
RBN 2020 Budget
RBN 2014/015 (5th Yr) Not Done
Postal : PHP II
0
0
0
RBN 2015/016 (6th Yr)
0
RBN 2014/015 (5th Yr)
RBN 2014/015 (5th Yr)
RSDPAF 2010-11STYPM
RSDPO 2009-10 FYPM Completed
Completed
and ACQMP, RBN 2014/015 (5th Yr)
RSDPO 2009-10 STYPM Completed 0
and ACQMP,
RSDPO RBNSTYPM
2009-10 2014/015 (5th Yr)
Completed
and ACQMP
RSDPO 2009-10 STYPM Completed
and ACQMP, RBN 2014/015 (5th Yr)
Postal P II
RSDPAF 2012-13 TYPM ongoing and 0
ACQMP
RSDPO 2009-10 STYPM Completed
and ACQMP
RSDPO 2009-10 STYPM Completed
and ACQMP, RBNSTYPM
RSDPO 2009-10 2014/015 (5th Yr)
Completed
and ACQMP
ACQMP PROJECT
ACQMP PROJECT
ACQMP PROJECT
RBN 2020 Budget
RSDPAF 2011-12 SYPM Completed
RSDPAF 2011-12 SYPM Completed 0
and ACQMP