Requirements of Work

Over Rigs in Well Services


Corporate Well Services
Work over job plan

 Aim to contribute 7-8 % of oil production


through engineered intervention.
 Arrest pressure decline / sustain
production from matured fields by
addressing reservoir related problems
 Address safety related issues
Onshore Work over operations
• Average wells worked over per year – 1500
• 85-90 rigs deployed every year
• Mix of rig capacity 30 MT to 150 MT
• Mix of ONGC owned and Charter hired
• Presently 57 own rigs and 25 charter hired rigs in
operation
ONGC Owned Charter Hired
Rig Capacity Under Under
In operation In operation
commissioning mobilisation
30 MT (140 HP) 0 0 3 0
50 MT (300 HP) 29 0 7 1
100 MT (525 HP) 27 1 10 1
150 MT & above (650 HP) 1 2 5 0
Total 57 3 25 2
Offshore Work over operations
 Average wells worked over per year – 100
 10-12 rigs required every year
 Mix of jack up drilling rigs & Modular work over rigs
 Mix of ONGC owned and Charter hired

Rig type ONGC Owned Charter Hired

Modular Rigs with capability


for 6” drain hole drilling 0 1+2*

Jack up Drilling rigs 2-3 4-5

Note: *Presently there is only one modular rig in operation. 2 rigs are under
mobilisation
Points to ponder

 Ever increasing requirement of Work over operations to


arrest pressure decline in mature fields.
 Ageing of owned Work Over rigs leading to efficiency
reduction.
Rig requirement – Onshore
As per present work plan
 Acquisition plan - replace ageing fleet over next 2-4 years in phased
manner
Owned Rig
No. of rigs Age range
Capacity
50 MT 20 22-28 yrs
100 MT 23 21-30 yrs
150 MT 1 27 yrs
Total 44
 Charter Hiring plan –
– Total requirement 28-30 rigs for three years period.
– Tenders expected to be invited as under
Expected Yr of No. of Rigs - capaicity-wise
tendering as per
30T 50T 100T 150 T Total
present work plan
2015-16 4 2 3 4 13
2016-17 0 0 6 1 7
2017-18 4 6 5 3 18
2018-19 0 1 3 2 6
Total 8 9 17 10 44
Note: In case of any change in work program, there may be addition / deletion to above.
Rig requirement – Offshore
As per present work plan

 Charter Hiring plan – 3 Modular rigs to be in operation


after mobilisation of 2 rigs
 Continue to deploy jack up drilling rigs as per requirement
(owned & charter hired)
In Additional
Rig type operation deployment Total Rigs
Modular Rigs with
capability for 6” drain 1 2 3
hole drilling

Jack up rigs 6-8 1-2 7-10


Looking for

 Acquisition of new rigs (50-150MT) with latest technology


for efficient operation and safety.
 Charter hiring of Rigs – to be able to provide rigs with 30-
150 MT capacity.
 Expected to fulfill tender conditions, comply all industry
standards / safety requirements and provide back ups for
accessories and spares and.
 Ensure Timely Delivery / mobilisation.
Offshore Engineering Services
In Summation....
 Contractors/Vendors are solicited to participate in the tenders.

 Tenders are available at “ tenders.ongc.co.in ”

 Address of Offshore Engineering Services , Mumbai :


Executive Director – Chief Offshore Engineering Services
4th Floor, 11 High, ONGC Office
Bandra-Sion Link Road,
Sion (West), Mumbai-400017
Ph: 022-24088422
Fax: 0091-22-24088500
Contact persons for Technical / commercial queries :
1. S.V. Haviryaji, Head Offshore Design
2. S.C. Aggarwal, Head Offshore Works
3. Manas Chakraborty, Head Material Management
4. Mrs H.K. Joshi, Head Finance