Facility / Site: GORDHAB TATAOUINE Location within Site: Permit No: Permit Type: Date:
FALL RESTRAINT COMPLETE THE SECTION BELOW IF THIS JSA IS NOT PART OF A PERMIT PACK
GLOVES:
• Poor communication
• A valid permit to work Project Emergency
• incompetent workers
• Competent workers response plan
• trips and falls
1. Job preparation • TBM (medical treatment)
• pinch point Proper fire
• Certified equipment
• heavy load extinguisher
• PTW/TBT
2. Test pits •
• Underground utilities Proper PPE
• Unknown underground • Competent workers
utilities • Certified equipment
• Repetitive movement • Ensure good communication
• Electrical shock • Ensure close supervision
Project Emergency
• Contact with people • Planned break response plan
• Hand injuries • Protect the hole after task finishing (medical treatment)
• Hard barricading Proper fire
• Pinch point
• Identify the hole extinguisher
• Trips and falls
• Coordinate with STEG to deenergize electrical cables if needed
• Poor communication
• Non competent workers
• Poor supervision
• Silica exposure
• Struck by equipment
• Entanglement h • Dust mask to be worn to avoid inhalation contact and respiratory
• Severe injuries Back pain system protection Project Emergency
• Falling/Flying Debris • Use ear plugs and adequate PPE response plan
4. HOUSEKEEPING • Tool Malfunction and • Ensure machine guard are well fixed (medical treatment)
Electric Shock • Frequent breaks should be taken for recovering Proper fire
extinguisher
• Loss of Control Over Tool • Ensure work area is clear of other workers.
• Excessive Noise • Housekeeping and cleaning the area after EACH SHIFT
• Looseness Perforator bit