You are on page 1of 7
Project's location / Project Project name — [Pumping system presizing at Khartoum: j Location County [Sudan = Site Khartoum NASASSE sy @& Open site PHerizory Free horizon % Cancel ff OK System Specification Pumping system definition ;-Water needs © Yeatly average © Seasonnaly data © Monthy data | Whole ‘Year needs 1.0 Wi/day Pipes Length [0.0 Head (Level diference] | [EO meter Int. diam [00 mm ;-Pump technology © DE positive displacement © AC positive cisplacement © Centitagal Water unit Head [mete >] Flow [n?fday >| ; Power converter © Direct coupiing © Dit with curent Booster © Cascading @ MPPT converter | Pump layout Surtace ® Deep well Collector plane orientation Tilt 30° Azimuth 0° 2 an. ‘Winter Meteo Yield Transposition Factor FT = 1.18 Loss by respect to optimum 0.3% Global on coll plane 1251 kWh/m? [& Show Optimisation ®| a ii Tit [7] |30 ea Azimuth [] [0 % Concel —— Next so izing and Results (ee ees) Input Data Op Khartoum Plane: tit = 20°, azimuth = Tank volume Autonomy Head (pumping height) 50 meter! Constant use |e |aje =| S| | Energy IkWhidey] 400.0 réfday || Required "LOL" jsation Parameter Energy needs 170.5 kivhiday 200 Water needs 400.0 m3/day 150 50 Jan Feb Mar Apr May By Load Project ER Save T T T T T Available Solar energy 164.6 kWhiday dun Jul Aug Sep Oct 2 Bint % Cancel Nov Dec Year “1 500 400 '300 ‘Water needs (maiday] 100 Af OK Sizing and Results Input Data} Results Khartoum Away nom poner 29004 Wp Plane: tit = 300, azimuth =0° Tark volume Pump power 22982 Ww Autonomy Head fpumping height) 50 meteiw’ Inwestmentenst 317224 US$ Constant use 400.0 nefday |) Required "LOL" Water cost 0.23 Us$/m3 his {20/7 T T T T Av. tank fing state 45.1 % Gc Missing water $.0.% 100 80 =|, B 60 40 20 D Jan Feb Mar = Apr May Load Project BR Save Jun ExBiin Jul Aug Sep Oct Nov 3% Cancel Dec Year sing CRO ee Sl Tnput Data Optimisation Parameter Results Khartoum Tank velume Sor na Auay nom power 29004 Wp Plane: tit = 90°, azimuth =0° eect Pump power 22962 W Autonomy 5.0 days Head [pumping height) 50 meterw — Investment cost 317224 US$ Constant use 400.0 i/dap | Required "LOL" 50% | Water cost 0.23 UStm3 . incid. | PVavail. )PVneeds [PV Excess [pumped w]tissing W] Missing ] Fuel —s lkwhine.day| swhiday | Kwhiday | kWhiday | meiday | meiday % iter | | Joan. ce | ea | ios | oo | se | 00 00 00 [= Feb. 7A 1e42 | 1705 140 | 06.1 0.0 00 00 | Mar, 7 1845 170.5 144 388.8 0.0 0.0 0.0 | BB |Apr. 66 WAZ 170.5 43 3914 0.0 0.0 0.0 =! |may 56 es | 1705 00 336 o4 of a4 June 53 02 | 1705 00 wes | 734 1a | e260 July 52 vasa | 1705 00 set | 313 203 | 7163 Aug. 85 1442 | 1705 00 ss33 | 617 134 | S34 62 reg | 1705 00 ars | 218 54 1858 oct. 67 1758 | 1705 00 ang 0.0 0.0 00 | Nov. 7.0 4817 170.5 0.0 426.1 0.0 0.0 0.0 | B>| Joc | sr | mer | mos | ov | aos | ov | ov | ov 2 | |vear 63 1646 | 1705 24 3e05 | 200 50 2074.7 BY Load Project ER Save EY Brint % Cancel SOK izing and Results ita) Input Data Optimisation Parameter ‘Results Khartoum Tene vak a Anaynom pover 28967 Wp Plane: tit = 30°, azimuth =0° ark volume 2000, ms Pump power 22932 W Autonomy 5o days: Head (pumping height) = 50 meterw nyu . Investment cost 316823 US$ Constant use 400.0 nf/day || Recuired "LOL BO BI | water cost 0.23 US$/m3 Economic gross evaluation Module cost 11176 uss Gee Pump and accessories 29904 US$ United StatesUS$ i Regulator cost 49105 uss Transpott/Fitting 226638 US$ Bstes B Total investment 316823 US$ Loan Annuities 25423 US$eur Duration 20 years: Maintenance costs 5981 US$¥yr Total Yearly cost 31403 US$/yr Co a ‘Water cost 0.23 US$/m3 Ann, factor: 0.080 These values should only be considered as an order E of magnitude. Mote precise evaluations willbe il availabe with detailed simulation Edit costs 2 * BS Load Project ER Save ES Print Hidden PVSYST Parameter Edition i) — |) a) These parameters should be modified anly by expert users | Category [Specie Pre-siaing cocts (al aysteme) Ei Identifier Value Default i Loan duration (= expected system lifetime) [20.00 Yeas I | =| PY Modules specific cast. 1 Kwe fron Eu J PV Modules specific cost, <10kWp [QO Eu 7 PY Modules specific cast, < 100kWp [1.00 Eurtw PV Modules speciic cost, > 100kWp [1.00 Euvw Custom modules avercost [1.30 ratio I# Inverters specific cost, <5kWe [BOD00 Eurkw Ie f Inverters specific cost,» 5kWe [P0000 Ewrkw i Invetters specific cost, >20kWwp [B0Q00 Eur I Flat roof supports specific cost [068 Eur Iw [¥ Save modifications for other sessions % Concel

You might also like