SECTION A-A METALLIC ( ALU ) OR CONCRETE STAIRS TO ACCES

To be defined by civil engineering

SECTION B-B
R
07

R
07

R
10
R
VALVES CHAMBER 1 06
EXCES SLUDE DELIVERY TO THICKENER

SLUDGE BIOLOGICAL VALVES CHAMBER 2


STORAGE TANK
SECTION C-C
SLUDGE LIFTING
STATION RECYCLING

R
05

PLAN VIEW DECANTED SLUDGE FROM CLARIFIER A VALVES CHAMBER 1


R ACCESS TRAP METALLIC ( ALU ) OR CONCRETE STAIRS TO ACCES
DECANTED SLUDGE FROM CLARIFIER B 10 To be defined by civil engineering

R
11
DESIGN BUIL AND OPERATE
OF WASTE WATER TREATMENT PLANT

R BUILDER CONSULTING
B 07 B

SLUDGE BIOLOGICAL R
STORAGE TANK 06 CIVIL ENGINEERING
R EXCES SLUDE DELIVERY TO THICKENER
09 SLUDGE LIFTING STATION RECYCLING
A R
AND SLUDGE BIOLOGICAL STORAGE TANK
R 05
08 PLAN VIEW AND SECTIONS

A
C

UP-DATED ALLS LEVELS FOLLOWING FINISHED GROUND LEVEL


B 21.01.19 VPH WM BPH APV
VALVES CHAMBER 1 SLUDGE LIFTING VALVES CHAMBER 2 BPH
1200.00 BECOMES 1142.50

A VPH WM FIRST TRANSMISSION


STATION RECYCLING IND Dated Visa Visa Visa MODIFICATION

SCALE

35532 NOYAL SUR VILAINE - FRANCE Nr of BUSINESS 03477

Nr PLAN 03477-PGC14 B