You are on page 1of 2

118

Elev=113.95 m

Elev=113.95 m

Elev=113.90 m
Elev=113.90 m

x=3.35 m

x=3.35 m

x=4.85 m
x=4.85 m

Elev=11 4.00 m
117

x=0.00 m
116
MAIN DRIVEWAY WIDTH MAIN DRIVEWAY WIDTH

6700
115 1520 3350 3350 1500

-3% -1.5% -1.5% -3%


114

113
PART OF LEFT TURN PART OF RIGHT TURN
DRIVEWAY WIDTH DRIVEWAY WIDTH

130 820
112 3480 4170

111

110

109
NGE=107.31 m

108

107

106

105

104
-10 -5 0 +5 +10

118

Elev=113.95 m

Elev=113.95 m

Elev=113.89 m

Elev=113.84 m
Elev=113.94 m
Elev=113.89 m

x=3.35 m

x=3.35 m

x=7.52 m

x=9.14 m
x=4.32 m
x=5.82 m

Elev=114.00 m
117

x=0.00 m
116
MAIN DRIVEWAY WIDTH MAIN DRIVEWAY WIDTH
PART OF LEFT TURN PART OF LEFT TURN
DRIVEWAY SHOULDER 6700
DRIVEWAY SHOULDER
115 (REFER TYPICAL SHOULDER CROSS 1506 965 3350 3350 4174 1616 (REFER TYPICAL SHOULDER CROSS SECTION W=1.5m)
SECTION W=1.5m)

3% 1.5% 1.5% 1.5% 3%


114

113
PART OF LEFT TURN PART OF RIGHT TURN
DRIVEWAY WIDTH DRIVEWAY WIDTH

112

111

110

109

108

107

NGE=107.31 m
106

105

104
-10 -5 0 +5 +10 +15

PREPARED BY: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED (AS PER PLAN SUBMITTED): RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

ENGR. RAYMOND R. ESTO C.Y. 2018 TO 2020 PROJECT


"AS STAKED" PLAN FOR
FFC 001 - ENSURE SAFE AND RELIABLE NATIONAL ROAD
ALEJANDRO S. ABELLA ISABELO C. GUINGAB JR. JAIME P. CATOLOS JR. ALEXANDER D. NOLA, CESO IV LORETA M. MALALUAN, CESO IV PDD
DATE:___________ SYSTEM BRIDGE - REPLACEMENT OF PERMANENT
WEAK BRIDGES SHEET PILE DETAILS REPUBLIC OF THE PHILIPPINES
PROJECT INSPECTOR OIC, CHIEF CONSTRUCTION DIVISION CHIEF, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OFFICE-IN-CHARGE
1
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CAGAYAN
ABUSAG BRIDGE
FREY-FIL CORPORATION
TEODORICO A. GUICO
(B04258LZ) & APPROACHES
AT ABUTMENT B DATE:______________ DATE:______________ DATE:_____________ DATE:______________ OFFICE OF THE REGIONAL DIRECTOR
DATE:___________
BRIDGE 2
PROJECT MANAGER Along Baybayog - Baggao - Dalin - Sta. Margarita Road REGIONAL OFFICE II
CONTRACTOR DATE:___________ Baggao, Cagayan TUGUEGARAO CITY, CAGAYAN
PREPARED BY: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED (AS PER PLAN SUBMITTED): RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.

ENGR. RAYMOND R. ESTO C.Y. 2018 TO 2020 PROJECT


"AS STAKED" PLAN FOR
FFC 001 - ENSURE SAFE AND RELIABLE NATIONAL ROAD
ALEJANDRO S. ABELLA ISABELO C. GUINGAB JR. JAIME P. CATOLOS JR. ALEXANDER D. NOLA, CESO IV LORETA M. MALALUAN, CESO IV PDD
DATE:___________ SYSTEM BRIDGE - REPLACEMENT OF PERMANENT
WEAK BRIDGES SHEET PILE DETAILS REPUBLIC OF THE PHILIPPINES
PROJECT INSPECTOR OIC, CHIEF CONSTRUCTION DIVISION CHIEF, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR OFFICE-IN-CHARGE
2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CAGAYAN
ABUSAG BRIDGE
FREY-FIL CORPORATION
TEODORICO A. GUICO
(B04258LZ) & APPROACHES
AT ABUTMENT B DATE:______________ DATE:______________ DATE:_____________ DATE:______________ OFFICE OF THE REGIONAL DIRECTOR
DATE:___________
BRIDGE 2
PROJECT MANAGER Along Baybayog - Baggao - Dalin - Sta. Margarita Road REGIONAL OFFICE II
CONTRACTOR DATE:___________ Baggao, Cagayan TUGUEGARAO CITY, CAGAYAN