BEG. OF PROJECT @ SECTION 1

09

0+
BEG. OF ALIGNMENT "A"

.159

11
0

0+050.
STA. 0+000

4.8
END OF PROPOSED CONCRETE
ELEV. = 110.769m SHEET PILES @
STA. 0+114.832

32
END. OF PROPOSED CONCRETE .P. )

372
SHEET PILES @ C.S .51m
7
(H=
STA. 0+100.00

0+0
BEG. OF PROPOSED CONCRETE
SHEET PILES @

00
STA. 0+070.00 .
C.S.P )
.4m
C.S.P. (H=6 (H=6 BEG. OF PROPOSED CONCRETE

0+02

0
.4m)

12
C.S.P. SHEET PILES @
STA. 0+110.00
(H=7.51m)

0+
0

0+
0+040

11
0+
0+060

0
10
0+
0+070

5
0+0

10
0+080

0+090
0+086

0
95
W

)
C.S.P. (H=6 7.51m
.4m) . (H=
C.S.P

6
C.S.P.

.92
(H=7.5
1m)
C.S.P. END OF PROPOSED CONCRETE ABUTMENT A

8
661
SHEET PILES @
(H=6.4m)

9
BEG. OF PROPOSED CONCRETE STA. 0+114.832

0
SHEET PILES @
S

0+
STA. 0+060.00

0+078.
E

PT
SECTION PROFILE
LEFT SIDE

TOTAL WT. / METER


STA. REQ'D. CSP Quantity LENGHT(m) LENGHT WT.in KG
0+070 0+086 0.45 x 0.8 x 6.4m 19 121.6 105,062.4
0+086 0+095 0.45 x 0.8 x 7.51m 8 60.08 864 kg 51,909.12
0+095 0+100 0.45 x 0.8 x 6.4m 7 44.8 38,707.2
0+110 114.8320.45 x 0.8 x 7.51m 8 60.08 51,909.12 TOTAL WT.= 247,587.84 KG
SECTION PROFILE
RIGHT SIDE

TOTAL WT. / METER


STA. REQ'D. CSP Quantity LENGHT(m) LENGHT WT.in KG
0+060 0+070 0.45 x 0.8 x 6.4m 13 83.2 71,884.8
0+070 0+086 0.45 x 0.8 x 7.51m 25 187.75 864 kg 162,216
0+086 0+090 0.45 x 0.8 x 6.4m 8 51.2 44,236.8
0+090 0+114.832 0.45 x 0.8 x 7.51m 40 300.4 259,545.6 TOTAL WT.= 537,883.2 KG
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

001 - ENSURE SAFE AND RELIABLE NATIONAL


ROAD SYSTEM BRIDGE - REPLACEMENT OF PROPOSED CONCRETE
TEODORICO A. GUICO ISABELO C. GUINGAB JR. JOSE B. TOBIAS , CESE ALEXANDER D. NOLA, CESO IV MELANIO C. BRIOSOS, CESO III PDD
PROJECT MANAGER
PERMANENT WEAK BRIDGES
ABUSAG BRIDGE SHEET PILE ALONG REPUBLIC OF THE PHILIPPINES
PROJECT ENGINEER CHIEF, CONSTRUCTION DIVISION
JAIME P. CATOLOS JR.
ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR CAGAYAN
2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHIEF, PLANNING AND DESIGN DIVISION
DATE:___________ (B04258LZ) & APPROACHES
Along Baybayog - Baggao - Dalin - Sta. Margarita
ALIGNMENT "A" PROFILE DATE:______________ DATE:______________ DATE:_____________ DATE:______________ DATE:______________ BRIDGE 3
FREY-FIL CORPORATION Road Baggao, Cagayan STA. 0+000 - 0+114.83 REGIONAL OFFICE II
CONTRACTOR TUGUEGARAO CITY, CAGAYAN