Professional Documents
Culture Documents
.00
0.00
ABUT. ABUT.
-1
0.
00
.0
STA. 25+913.986 STA. 25+949.986
0
EXP. EXP.
EL. = 6.463m EL. = 6.449m
--11.
0.000
BACK OF BACKWALL -2 BACK OF BACKWALL
N: 1,625,935.436 .00 N: 1,625,959.752
E: 492,668.001 36000 E: 492,641.455 -1.00
TO MALABON
-1
-
.0
1.0
0
0
-1
.0
25+700 0 26+100
25+800 25+900 26+000
-1
.0
0
-2.0
TO NMIA
-1.00
-1.00
-2.
00
-1.00
-1
00.
NOTE: 1A LOCATION PLAN
RB1-01 RB1-01 SCALE 1:1000
THE CONTRACTOR SHALL CONDUCT GEOTECHNICAL INVESTIGATION WITHIN
THE LOCATION OF THE BRIDGE, BORING REQUIREMENTS FOR LOCATION
NUMBER, SPACING AND DEPTH SHALL CONFORM TO THE REQUIREMENTS OF
ARTICLE 4.122 OF THE DESIGN GUIDELINES, CRITERIA AND STANDARDS FOR
PUBLIC WORKS AND HIGHWAYS (DPWH), BUREAU OF DESIGN (BOD) 2004.
DS
DS
DS
DS
DS
NMIA DS
EXPRESSWAY
DS
DS
MANILA
NORTH
RAILWAY
R.O.W
NMIA
EXPRESSW
AY
MANILA
NORTH
RAILWAY
R.O.W
SUMMARY OF QUANTITIES EXPRESSW
NMIA
AY
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
ITEM NO. DESCRIPTION QUANTITY UNIT
103 (1) a STRUCTURE EXCAVATION (INCLUDES HAULING OUT OF MATERIALS), FOR ARMOUR ROCK 545.19 cu.m.
302 (2) EMULSIFIED ASPHALT 1098.16 sq.m.
DS
DS
DS
DS
DS
DS
DS
DS
ROAD
5
HOUSE
GUARD
BUILDING
ADMINISTRATION
OMC
STP
ROAD
6
TANK
WATER
DOMESTIC
ROAD
HOUSE
2
ROAD
PUMP
3
TANK
WATER
HOUSE
FIRE
ROAD
GUARD
1
HOUSE
POWER
HOUSE
CUSTOMER
TRANFORMER
ROAD
OUTDOOR
4
310 (1) c BITUMINOUS CONCRETE SURFACE WEARING COURSE, HOT LAID, 50 MM THICK (DECK SLAB OVERLAY) 1098.16 sq.m.
400 (17) k.1 BORED PILES, 1.80 M DIA. (RB-1) 504.00 m
400 (23) k1.1 PERMANENT CASING; 1800MM DIAMETER, 12MM THK. (RB-1) 252.00 m
400 (26) b PILE INTEGRITY TEST 6.00 ea.
400 (27) b HIGH STRAIN DYNAMIC TESTING (P. D. A.), 1800 MM DIA. (RIVER BRIDGE) 4.00 ea.
401 (2) c CONCRETE RAILINGS, PARAPET 174.60 m
403 (5) a1 STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTED, @ EXPANSION JOINT 3197.52 kg.
EMPLOYEE'S
VISITOR'S
PARKING
PARKING
A
CUSTOMER
HOUSE
TRANSFORMER
3
OUTDOOR
EXIT
POWER
1
HOUSE
ENTRANCE/
2
GUARD
1
HOUSE
DRIVEWAY
GATE
A
B
EMPLOYEE'S
PARKING
B
WATER
2
FIRE
TANK
MOTORCYCLE
1
PUMP
HOUSE
PARKING
A
DOMESTIC
F
WATER
E
TANK
STP
GATE
2
GUARD
HOUSE
ADMIN
1
BUILDING
EXIT
A
OMC
B
6
DS
BUILDING
DS
MINI
BOOTH
1
BOOTH
DS
TOLL
DS
BOOTH
DS
TOLL
BOOTH
TOLL
TOLL
DS
BOOTH
DS
BOOTH
DS
TOLL
BOOTH
TOLL
BOOTH
TOLL
BOOTH
TOLL
TOLL
404 (1) b REINFORCING STEEL, GRADE 60 ( FY= 414 MPA) 149986.24 kg.
404 (3) a EPOXY-COATED REINFORCING STEEL BARS, GRADE 60, EXPANSION (ANCHOR BAR @ EXPANSION JOINT) 2556.80 kg.
405 (1) a3.1 STRUCTURAL CONCRETE , CLASS A, F'C = 20.68 MPA @ 28 DAYS (RIVER BRIDGE AND UNDERPASS) 121.44 cu.m.
405 (1) f STRUCTURAL CONCRETE, CLASS A, F'C = 31 MPA @ 28 DAYS 651.29 cu.m.
405 (1) e3 STRUCTURAL CONCRETE, F'C = 41 MPA @ 28 DAYS 1.06 cu.m.
406 (1) g9.4 PRESTRESSED STRUCTURAL CONCRETE MEMBER, L=34.932 M, TYPE V, I - GIRDERS (RB-1) 12.00 ea.
407 (8) LEAN CONCRETE, CLASS B , F'C = 16.5 MPA (BRIDGE) 18.80 cu.m.
412 (1) c2 ELASTOMERIC BEARING PADS, DURO 60, 660 MM X 660 MM X 76 MM THICK (TYPE V GIRDER) 24.00 ea.
413 (1) a COMPRESSIBLE RUBBER EXPANSION JOINT FILLER, 50 MM THICK 0.40 cu.m.
413 (2) a PREFORMED CORK JOINT FILLER, 10 MM THICK 0.28 cu.m.
413 (2) b PREFORMED CORK JOINT FILLER, 20 MM THICK 0.88 cu.m.
413 (2) c PREFORMED CORK JOINT FILLER, 30 MM THICK 1.32 cu.m.
413 (2) d PREFORMED CORK JOINT FILLER, 50 MM THICK 0.12 cu.m.
413 (5) ELASTOMERIC , HOT APPLIED EXPANSION JOINT SEALANT 0.01 cu.m. 1A BANTILAN
414 (1) g FORMS AND FALSEWORK (BRIDGE, TOTAL ESTIMATED AREA : 1,436.16 SQ.M.), (RB-1) 1.00 l.s. RB1-01 RB1-01 RIVER BRIDGE 1
419 (1) CORRUGATED STEEL PLATE, 2 MM THICK 13857.54 kg.
505 (2) GROUTED RIPRAP, CLASS A 80.63 cu.m.
511 (3) a6 GEOTEXTILE SEPARATOR (EMBANKMENT HEIGHT, 9 M) 6922.60 sq.m.
511 (3) b6 FILTER FABRIC (EMBANKMENT HEIGHT, 9 M) 4627.22 sq.m.
511 (5) a6
511 (5) b3
BI-AXIAL GEOGRID (EMBANKMENT HEIGHT, 9 M)
GRS (GEOGRID AT BOTTOM OF APPROACH SLAB; EMBANKMENT HEIGHT, 9 M)
2989.00
17872.16
sq.m.
sq.m.
1B KEY PLAN
RB1-01 RB1-01 SCALE NTS
1501 (2) b ARMOR ROCK, 500 MM 1382.24 cu.m.
1501 (2) c QUARRY RUN FILTER ROCK, 200-300 MM 867.23 cu.m.
517 (1) a.2 BRIDGE DRAIN, 100 MM DIA. 14.00 ea.
DESIGN WAIVER
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND LOCATION PLAN, SUMMARY OF
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 QUANTITIES AND KEY PLAN
EFREN L. BACANI JOZ CARLOS G. ORDILLANO ATTY. ALVIN A. CARULLO RB1-01 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
The distance of the Bore Hole is too far from the bridge.
BH-32
DIST. FROM ABUT. ABUT.
BEG. OF BRIDGE = 141.71m
BEG.OFBRIDGE N: 1625819.483 A B ENDOFBRIDGE
STA.2 5+913.986 E: 492586.541 STA.2 5+949.986 ABUT. ABUT.
EL.= 6.463 EXP. EXP. EL.= 6.449
BACKOFBACKWALL
N:1,625,935.436
36000
TOTAL LENGTH OF BRIDGE (BACK TO BACK OF BACKWALL)
BACKOFBACKWALL
N:1,625,959.752
A B
E:492,668.001 534 34932 534 E:492,641.455 EXP. EXP.
GIRDER LENGTH
541 34932 527
BEG.OFBRIDGE ENDOFBRIDGE
STA.2 5+913.986 STA.2 5+949.986
EL.= 6.463 EL.= 6.449
BACKOFBACKWALL BACKOFBACKWALL
N:1,625,935.436 N:1,625,959.752
E:492,668.001 END DIAPHRAGM PSC GIRDER (AASHTO TYPE V) E:492,641.455
WINGWALL WINGWALL
PSC GIRDER (AASHTO TYPE V)
115
SHOULDER
OUTER
1
2500
BORING LOG
N - BLOWS
D SC
NGL 10 20 30 40 50
BH-32
LANE
2000x1500(min)
3500
1
ROD
WEIGHT
2000x1500(min)
ABUTMENT COPING
AL L
2
ABUTMENT COPING
B
SLA
LAB
TO MALABON
KW
HAMMER
ALL
14700
WEIGHT
ACH
S
C
4
KW
LANE
A
ACH
3500
RO
5
BAC
O
20°
P
6
R
P
APP
A
PRESSED
7
LANE
3500
8
Ø1800 BORED PILE
9
SHOULDER
10
Pa = 6434 kN LENGTH = 42m
1000
Pu = 19302 kN 11
Pa = 6434 kN
℄ OF MAIN ALIGNMENT
12
Pu = 19302 kN
220mm THK DECK SLAB 13
14 PRESSED
17
MEDIAN
25+900
43000
43000
18
15000
19
20
21 PRESSED
12470 22
23
24
2000x1500mm ABUTMENT COPING
25
SHOULDER
INNER
26
1198
1000
27
28
LANE
3500
29
30
PILE TIP PILE TIP
MH
ELEV. = -39.637m 31
ELEV. = -39.598m
LL
LAB
TO NMIA
LANE
3500
WA
32
B
GM
SLA
LL
HS
14700
K
33
WA
C
BA
ACH
SM
A
34
K
PRO
BAC
PRO
35
LANE
SM
3500
AP
36
AP
SHOULDER
OUTER
2500
NOTES:
1. DESIGN FLOOD LEVEL:
DESIGN FLOOD LEVEL (100-YEAR) = +2.50m
400mm THK END DIAPHRAGM DESIGN FLOOD LEVEL (50-YEAR) = +2.45m
2. DESIGN RIVER DISCHARGE:
WINGWALL DESIGN RIVER DISCHARGE (100-YEAR) = 205.66 CU.M/SEC
WINGWALL
DESIGN RIVER DISCHARGE (50-YEAR) = 183.36 CU.M/SEC.
3. DESIGN VELOCITY:
DESIGN VELOCITY (100-YEAR) = 0.59 m/s
DESIGN VELOCITY (50-YEAR) = 0.53 m/s
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 TO STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B GENERAL PLAN AND ELEVATION
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI EFREN L. BACANI JOZ CARLOS G. ORDILLANO ATTY. ALVIN A. CARULLO
A3 = 1:2
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
RB1-02 -
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
CL OF MAIN ALIGNMENT
2081
2104
1973
1967
TOP OF COPING TOP OF COPING
ELEV = 3.865 m ELEV = 3.907 m
ARMOR ROCK
1796
ARMOR ROCK
1752
1545
1500
1348 2625 2625 2625 2625 2625 1215 1348 2625 2625 2625 2625 2625 1215 500mm
500mm +2.450 M - D.F.L.
QUARRY RUN FILTER QUARRY RUN FILTER
PSCG AASHTO 100mm THK. LEAN 100mm THK. LEAN PSCG AASHTO
ROCK 300mm 2000x1500mm ROCK 300mm
TYPE V CONCRETE (TYP) CONCRETE (TYP) TYPE V
COPING BEAM 1844 6000 6000 1844 1844 6000 6000 1844
1800Ø BORED PILE
LENGTH = 42m
what material is
this?
PILE TIP NATURAL 1. provide the following for the design of abutment protection;
PILE TIP
ELEV = -39.637m GRADE LINE
ELEV = -39.637m - design calculations
- settlement analysis
- global stability analysis
ABUTMENT A does the total pile length consider the 5-meter depth of - scour protection design (as the hydrology study indicates a approximate 5-
scouring based on th hydological study? meter depth of scour will probably occur
1A CROSS SECTION (SKEWED) 2. is geotextile not required?
RB1-03 RB1-03 SCALE 1:150 3. Provide separate sheet or drawing for magnified detail of the abutment
protection.
CL OF MAIN ALIGNMENT
1962
1956
1540
1500
1348 2625 2625 2625 2625 2625 1215 ARMOR ROCK 500mm
500mm
+2.450 M - D.F.L.
QUARRY RUN FILTER QUARRY RUN FILTER
PSCG AASHTO 100mm THK. LEAN PSCG AASHTO
ROCK 300mm 100mm THK. LEAN ROCK 300mm
TYPE V CONCRETE (TYP) TYPE V
1844 6000 6000 CONCRETE (TYP) 1844 6000 6000 1844
1844
1800Ø BORED PILE
LENGTH = 42m
NATURAL
GRADE LINE
PILE TIP PILE TIP
ELEV = -39.598m ELEV = -39.598m
ABUTMENT B
1B CROSS SECTION (SKEWED)
RB1-03 RB1-03 SCALE 1:150
DESIGN WAIVER
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+113.986 - STA 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND ABUTMENT CROSS SECTIONS
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-03 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
1C
RB1-
0 Ø36 x 2000 LONG EPOXY END DIAPHRAGM
4 RB
1-04 COATED ASTM A615 ANCHOR 30mm THK PREFORMED A
BARS @ ±250 O.C. (TYP) EXPANSION JOINT
CORK FILLER (TYP) BEARING PAD END OF GIRDER
450 50 EXPANSION JOINT COVER
GAP
GAP
30
30
300
APPROACH SLAB 300 END DIAPHRAGM
300
SHEAR KEY
BACKWALL BEARING PAD
Ø10 SPIRAL @50 PITCH
1000
1348 2625 2625 2625 2625 2625 1215
AROUND STEEL CASING RISER
0
400
TOP OF COPING
0
500
WINGWALL
AASHTO GIRDER
20mm THK. PREFORMED
EXPANSION JOINT CORK FILLER
1000
1500 (MIN.)
36mmØ x 2000 LONG
EPOXY COATED ASTM A615
ANCHOR BAR (DEFORMED)
APPROACH SLAB
0
100
ABUTMENT COPING
15688
375 2668
1C SECTION
RB1-04 RB1-04 SCALE 1:30
OUTER SHLDR 2mm THK
50mm THK WEARING
220mm THK DECK SLAB COURSE CORRUGATED STEEL PLATE
STEEL DECKING
2.3% SLOPE
2.8% SLOPE
1804 533
1804 1804 1804
2110
1804 32 32 32 32
32 32
1971
32 32 32 32 GAP GAP
32 32 GAP GAP GAP GAP
GAP GAP GAP GAP
GAP GAP
550
550
550
550
669
550
550
550
550
550
550
119
128
1745
1500
150
150
DESIGN WAIVER
GRAPHIC SCALE:
1000 0 2000 6000
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
0
100
15688
0
500
APPROACH SLAB
WINGWALL
B
END OF GIRDER
B
450
450 50 EXPANSION JOINT COVER
50
10mm PREFORMED EXPANSION 220mm THK CONCRETE DECK SLAB
30 30 30
JOINT CORK FILLER WITH
GAP
100
2000
30
300
APPROACH SLAB END DIAPHRAGM
300
30mm THK PREFORMED
300
EXPANSION JOINT SHEAR KEY
CORK FILLER (TYP)
BACKWALL BEARING PAD
Ø10 SPIRAL @50 PITCH
1000
AROUND STEEL CASING RISER
(AT ABUTMENT B ONLY)
TOP OF COPING
1000
1500 (MIN.)
36mmØ x 2000 LONG
EPOXY COATED ASTM A615
ANCHOR BAR (DEFORMED)
15688
(TO NLEX)
2.5% SLOPE
3.0% SLOPE
2086
533 1804 1804
32 32 32 32
2000
1960
32 32 32 32
32 32 32 32 GAP GAP GAP GAP
GAP GAP GAP GAP
GAP GAP GAP GAP
550
130
139
1769
1500
1C SECTION
150
150
150
DESIGN WAIVER
GRAPHIC SCALES:
1000 500 0 1000
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Network - Component 1 STA. 25+913.986 TO STA. 25+949.986
Expressway Corp. RENARDET
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND ABUTMENT B COPING PLAN,
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 ELEVATION & SECTION
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-05 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
LOC. 1 (SEE TABLE) LOC. 1 (SEE TABLE)
25+900
COORDINATES
BEG.OFBRIDGE
ENDOFBRIDGE MARK STATION NORTHING EASTING REMARKS
STA.2 5+913.986
STA.2 5+949.986
EL.= 6.463
EL.= 6.449 25+907.551 1625916.252 492659.155 LOC.1 (SEE PLAN)
BACKOFBACKWALL
BACKOFBACKWALL
N:1,625,935.436
N:1,625,959.752 25+909.647 1625921.813 492661.407 LOC.2 (SEE PLAN)
E:492,668.001
E:492,641.455
ABUT. 25+911.743 1625927.375 492663.659 LOC.3 (SEE PLAN)
A
25+918.363 1625944.940 492670.770 LOC.4 (SEE PLAN)
DESIGN WAIVER
NOTE:
THE DESIGN CONSULTANT SHALL BE HELD FULLY 1. STATIONS ARE TAKEN AT CENTERLINE OF ALIGNMENT UNLESS OTHERWISE NOTED.
RESPONSIBLE FOR THE FAILURE OF THE FACILITY / IES DUE
TO FAULTY DESIGN EXCEPT FOR CHANGES MADE WITHOUT
2. VERIFY INDICATED COORDINATES WITH CIVIL DRAWINGS.
THE CONFORMITY OF THE CONSULTANTS.
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B BORED PILE LAYOUT AND COORDINATES
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO
A3 = 1:2
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
RB1-06 -
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
ABUT. ABUT.
A B
EXP. EXP.
36000
TOTAL LENGTH OF BRIDGE (BACK TO BACK OF BACKWALL)
534 34932 534
GIRDER LENGTH
134
134
134
134
SHOULDER
134
OUTER
8
2500
8
LANE
3500
INT
INT
INT
DIA
DIA
DIA
14710
PHR
PHR
PHR
LANE
3500
TO MALABON
AGM
AGM
AGM
LANE
3500
20.447°
SHOULDER
INNER
121
121
121
121
1000
5
121
5
5
℄ OF MAIN ALIGNMENT
20.447°
25+900
43000
15000
-
8727 8727 8727 8727
SHOULDER
134
134
134
134
INNER
1000
134
8
8
LANE
3500
INT
INT
INT
LANE
3500
DIA
DIA
DIA
TO NMIA
14710
PHR
PHR
PHR
AGM
AGM
AGM
LANE
3500
SHOULDER
OUTER
2500
121
121
121
121
5
5
121
5
5
DESIGN WAIVER
GRAPHIC SCALE:
5000 0 5000 10000
1 GIRDER FRAMING / SLAB OFFSET PLAN SCALE 1:200
RB1-07 RB1-07 SCALE 1:200
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
GIRDER FRAMING / SLAB OFFSET PLAN
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-07 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
5518
EXPANSION JOINT
Ø16 TRANS. TOP &
5-Ø16 ADD'L TRANS.
S6 S7 450 50 BOT BARS @ 150
TOP & BOT BARS
50
220
50
Ø16 LONGI.
TOP BARS @ 200
14700
Ø16 LONGI.
BOT BARS @ 200
1C DETAIL AT ABUTMENT
RB1-08 RB1-08 SCALE 1:15
CL OF BRIDGE
14700
1D
RB1-08 RB1-08
Ø16 LONGI. TOP Ø16 TRANS. TOP
S3 S1
BARS @ 200 (TYP.) BARS @ 150 (TYP.)
1D DETAIL
RB1-08 RB1-08 SCALE 1:15
GRAPHIC SCALES:
1B TYPICAL SECTION AT MIDSPAN
1000 0 2000 6000
RB1-08 RB1-08 SCALE 1:30
SCALE 1:100
SCALE 1:30
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
DECK SLAB REINFORCEMENT PLAN,
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 SECTION AND DETAILS
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-08 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
T. T.
ABU ABU
A B
XP. 9960 12000 .
75 E S3b S3c EXP
75
S3a 1420 1420 S3b 1420
12000 Ø16 LONGI. TOP BARS @ 200
5029 S3
5606 12000
S3b S3e
75
75
S3d 1420 1420 S3b 1420
9383
12000
T . T.
ABU ABU
A B
. 9960 12000 .
EXP S4b S4c EXP
75
75
S4a 1420 1420 S4b 1420
12000 5029
5606 12000
S4b S4e
75
75
S4d 1420 1420 S4b 1420
9383
12000
DESIGN WAIVER
GRAPHIC SCALE:
1 DECK SLAB LONGITUDINAL REINFORCEMENT LAYOUT 1000 0 2000 6000
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
DECK SLAB LONGITUDINAL REINFORCEMENT LAYOUT
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-09 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
CL OF BRIDGE
14700
DECK WIDTH
75
Ø16 TRANS. TOP
75
1420 S1
S1a 4096 BARS @150 (TYP) SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES
4096
S1a b b a
Ø16 TRANS. TOP a a a
75
S1
75 BARS @150 (TYP)
1420
S1b 11925 A B C
11925 S2b
BAR SHAPE
75
Ø16 TRANS. BOT
75
1420 S2
BARS @150 (TYP) DIMENSIONS (OUT TO OUT) LENGTH TOTAL UNIT
S2a 4096 BAR SIZE QTY SPACING BAR TOTAL VOLUME
ITEM EACH BAR LENGTH WEIGHT
MARK (mm) (mm) SHAPE WEIGHT (kg) (m3)
(mm) (m) (kg/m)
4096 a b c d e
S2a
75
Ø16 TRANS. BOT S1a 16 198 150 B 75 11925 12000 2376.00 1.578 3750.13
75
S2
1420 BARS @150 (TYP)
S2b 11925
S1b 16 198 150 B 75 4096 4171 825.86 1.578 1303.48
S2a 16 198 150 B 75 11925 12000 2376.00 1.578 3750.13
S2b 16 198 150 B 75 4096 4171 825.86 1.578 1303.48
S3a 16 38 400 B 75 9960 10035 381.33 1.578 601.87
11925 S5b S3b 16 152 400 C 12000 12000 1824.00 1.578 2878.89
75
ADD'L Ø16 TRANS. S3c 16 38 400 B 75 5029 5104 193.95 1.578 306.12
S5a S5b
75
75
ADD'L Ø16 TRANS.
S5a S5b
75
1420 TOP BARS @150 (TYP) S4b 16 148 400 C 12000 12000 1776.00 1.578 2803.13
S5b 11925 DECK SLAB 155.27
S4c 16 37 400 B 75 5029 5104 188.85 1.578 298.07
S4d 16 37 400 B 75 5606 5681 210.20 1.578 331.76
11925 S5d S4e 16 37 400 B 75 9383 9458 349.95 1.578 552.33
S5a 16 37 150 B 75 11925 12000 444.00 1.578 700.78
75
ADD'L Ø16 TRANS.
75
4096
S5c 16 37 150 B 75 11925 12000 444.00 1.578 700.78
S5c S5d 16 37 150 B 75 4096 4171 154.33 1.578 243.58
75
ADD'L Ø16 TRANS.
75
S6a 1420
5084
1420
S6b 11925
11925 S7b
75
75
5084
S7a
75
75
GRAPHIC SCALE:
1000 0 1000 3000
1 DECK SLAB TRANSVERSE REINFORCEMENT LAYOUT, SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES SCALE 1:75
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
DECK SLAB TRANSVERSE REINFORCEMENT LAYOUT,
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE
EFREN L. BACANI
PROJECT MANAGER/TEAM LEADER
JULITA B. BINGCO
HEAD, REGULATION DIVISION
ATTY. ALVIN A. CARULLO
EXECUTIVE DIRECTOR
RB1-10 -
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
400
ED1 2-Ø20 TOP BARS
50 220
ED4 Ø12 STIRRUPS @ 200
1600
ED5 2-Ø20 BOT BARS
213 (MAX.)
126 (MIN.)
TOP OF ABUT COPING
20
DOWEL BARS OF GIRDER (TYP) ED3
ED5 2-Ø20 BOT BARS (TYP) 4-Ø20 E.F. SIDE BARS (TYP)
ED2 2-Ø20 ADD'L BOT BARS AASHTO TYPE V GIRDER
20mm THK PREFORMED
Ø12 STIRRUPS ED1 2-Ø20 CONT. TOP BARS EXPANSION JOINT CORK FILLER ED2a 2-Ø20 ADD'L BOT 20mm THK. PREFORMED
ED4 BARS (TYP)
@ 200 (TYP) EXPANSION JOINT
CORK FILLER 36mmØ x 2000 LONG
EPOXY COATED
ASTM A615 ANCHOR BAR
300
50 220
@ 200 (TYP) RB1-11 RB1-11
ID1 2-Ø20 CONT. TOP BARS ID3 4-Ø20 E.F. SIDE BARS (TYP)
DOWEL BARS OF GIRDER (TYP)
1712
ID3
SPACED @ 220 (MAX.)
1442
1600
ID4 Ø12 STIRRUPS @ 200
TYPICAL INTERMEDIATE
1B TYP. ELEVATION OF INTERMEDIATE DIAPHRAGM 1D DIAPHRAGM DETAIL
RB1-11 RB1-11 SCALE 1:40 RB1-11 RB1-11 SCALE 1:25 DESIGN WAIVER
GRAPHIC SCALES:
1000 500 0 1000 2000
SCALE 1:40
1 DIAPHRAGM REINFORCEMENT ELEVATION AND SECTION DETAILS 500 250 0 500 1500
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
DIAPHRAGM REINFORCEMENT ELEVATION
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 AND SECTION DETAILS
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-11 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
COMPRESSIVE STRENGTH OF CONCRETE, f'c = 31MPa
10425 YIELD STRENGTH OF REINFORCING BAR, fy = 414MPa
2310
ID1a SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES
ID1b
LENGTH TOTAL UNIT TOTAL CONCRETE
75
ID1 2-Ø20 CONT. TOP BARS DIMENSIONS (OUT TO OUT)
BAR SIZE QTY SPACING BAR
75
75
75
75
c
75
7472 TOTAL WEIGHT OF FOUR (4) END DIAPHRAGMS @ EXPANSION ABUTMENT: 2093.51 26.64
C
ID1a 20 2 AS SHOWN B 75 10425 10500 21.00 2.466 51.79
7472
a ID1b 20 2 AS SHOWN B 75 7472 7547 15.09 2.466 37.22
2310 f
ED1b ID2 20 10 AS SHOWN C 350 1632 350 2332 23.32 2.466 57.51 4.03
e
ED1a d b
75
ED1 2-Ø20 CONT. TOP BARS ID3 20 40 220 C 350 1632 350 2332 93.28 2.466 230.04
75
c
10425 ID4 12 65 200 D 1365 200 1365 200 110 110 3350 217.75 0.888 193.32
D
TOTAL WEIGHT OF ONE (1) INTERMEDIATE DIAPHRAGM: 569.89 4.03
TOTAL WEIGHT OF SIX (6) INTERMEDIATE DIAPHRAGMS: 3419.33 24.16
NOTE: ALL QUANITIES SHALL BE VERIFIED DURING CONSTRUCTION
DESIGN WAIVER
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND DIAPHRAGM REINFORCEMENT LAYOUT, SCHEDULE OF
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 REINFORCEMENT AND ESTIMATED QUANTITIES
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE
EFREN L. BACANI
PROJECT MANAGER/TEAM LEADER
JULITA B. BINGCO
HEAD, REGULATION DIVISION
ATTY. ALVIN A. CARULLO
EXECUTIVE DIRECTOR
RB1-12 -
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
1E ABUT. 1D 1C 1B ABUT.
1675 510 SPAN LENGTH, Lmax =30540 510 1675 END OF GIRDER
END OF GIRDER END BLOCK
LIFTING HOOK 8-12.7mmØ
LIFTING HOOK 8-12.7mmØ
℄ OF ABUT.
1H PRESTRESSING STRANDS
END AT ABUT.
PRESTRESSING STRANDS RB1-13RB1-13 SIDE BARS @ TOP FLANGE
SUPPORT INTENTIONALLY ROUGHENED SURFACE ℄ OF INT. DIAPHRAGM WEB BARS TOP BARS PRESTRESSING CABLES
INT. DIAPHRAGM
END DIAPHRAGM
1G 1F
1600
RB1-13 RB1-13 RB1-13 RB1-13
SIDE BARS
℄ OF INT. DIAPHRAGM DOWEL BARS FOR
STIRRUPS BOTTOM BARS @ BOTTOM FLANGE
8728(MAX) INT. DIAPHRAGM
GCL/4
150
G7b G7b
150
150
102 76 127
G7 2-Ø25 TOP BARS
300
G7 2-Ø25 TOP BARS G7 2-Ø25 TOP BARS G7 2-Ø25 TOP BARS
102 76
320
G11 5-Ø20 BARS
G2 Ø12 TIES
G2 Ø12 TIES
250
212
320
330 102 G9a G9b G9c G9d
G6 5-Ø12 WEB BARS E.F. @ EVERY OTHER STIRRUPS
212
1-Ø12 SIDE G6 G6a 5-Ø12 WEB BARS E.F. 10-Ø25 STRAIGHT DOWEL BARS FOR
320
G6b
250
BARS E.F. 203 G6a SHALL BE ALTERNATED G13b
G6 G6a 5-Ø12 WEB BARS E.F. INTERIOR GIRDER
10-Ø25 STRAIGHT DOWEL BARS Ø12 CROSS TIES SAME
G13 G9
FOR INTERIOR GIRDERS SPACING AS STIRRUPS
838
838
838
212
320
1600
650 8-Ø12 SIDE BARS E.F. 10-Ø25 DOWEL BARS FOR
1600
1600
1600
250
G4a G13c
TO MATCH G4 EXTERIOR GIRDER
340
G10
Ø10 CROSS TIES G4 8-Ø20 SIDE BARS E.F.
212
250
360
10-Ø25 DOWEL BARS G8a Ø12 TIES
94
G13a
FOR EXTERIOR GIRDERS
PRESTRESSING CABLES
340
G6c 1-Ø20 SIDE BAR E.F.
254
254
254
1-Ø12 SIDE G8 Ø12 TIES
G6b G6c 1-Ø20 SIDE BAR E.F.
BAR E.F.
380
G6c 1-Ø20 SIDE BAR E.F. G5a 2-Ø25 BOTTOM BARS
300
1-Ø20 SIDE G5a 2-Ø25 BOTTOM BARS G5a 2-Ø25 BOTTOM BARS
140
203
203
203
G6c G5a 2-Ø25 BOTTOM BARS
BAR E.F.
2-Ø25 BOTTOM BARS 2-Ø25 BOTTOM BARS G5 2-Ø25 BOTTOM BARS G5 2-Ø25 BOTTOM BARS
G5 G5
40mm CLEAR COVER 2-Ø25 BOTTOM BARS
VARIES G5b 2-Ø25 BOTTOM BARS G5b
(ALL AROUND) G5b 2-Ø25 BOTTOM BARS 650 711 650
711 G5b 2-Ø25 BOTTOM BARS 711
711
1B TYP. SECTION 1C TYP. SECTION 1D TYP. SECTION @ END BLOCK 1E TYP. SECTION @ ANCHORAGE
RB1-13 RB1-13 SCALE 1:15
RB1-13 RB1-13 SCALE 1:15 RB1-13 RB1-13 SCALE 1:15 RB1-13 RB1-13 SCALE 1:15
1067 1067
G13 G13a
6-Ø25 DOWEL BARS FOR
171
376 157.5 157.5 376 376 157.5 157.5 376 INT. DIAPHRAGM
G2 Ø12 TIES G7 G7a G7b 6-Ø25 TOP BARS
50 50 50 50 G1 Ø12 STIRRUPS
4TH DEGREE POLYNOMIAL CURVE
20mm @ MIDSPAN
150
157.5 50
15mm @ QUARTER
300
300
305
320
INTENTIONALLY ROUGHENED 1 1
SURFACE 4 GCL 4 GCL
C2 C2 8727.5 8727.5
34910
320
320
1600
1600
ANCHOR HEAD OF
838
360
157.5 157.5
157.5 157.5
50
50
300
457
50
50
92.5
200.5 155 155 200.5 200.5 155 155 200.5 Ø10 CROSS TIES 1000 500 0 1000 3000
6-Ø25 BOTTOM BOTTOM OF GIRDER
G5 G5a G5b @ EVERY OTHER G10
711 711 Ø12 TIES G8 BARS
STIRRUPS SCALE 1:60
1F ELEVATION @ FIXED END 1G ELEVATION @ EXPANSION END 1H CROSS TIES & DOWEL BARS SCALE
500 0 500
1:20
RB1-13 RB1-13 SCALE 1:20 RB1-13 RB1-13 SCALE 1:20 RB1-13 RB1-13 SCALE 1:20 DESIGN WAIVER
SCALE 1:15
THE DESIGN CONSULTANT SHALL BE HELD FULLY
5000 0 5000 10000
RESPONSIBLE FOR THE FAILURE OF THE FACILITY / IES DUE
TO FAULTY DESIGN EXCEPT FOR CHANGES MADE WITHOUT
SCALE 1:200
1 PSC GIRDER REINFORCEMENT DETAIL 1/2 THE CONFORMITY OF THE CONSULTANTS.
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B PSC GIRDER REINFORCEMENT DETAIL 1/2
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO
A3 = 1:2
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
RB1-13 -
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
TOTAL GIRDER CASTING LENGTH = 34910
50 24@75 7@75 22@100 18@125 14@150 10@175 18@200 14@250(MAX.) 14@250(MAX.) 18@200 10@175 14@150 18@125 22@100 7@75 24@75 50
1275 525 2200 2250 2100 1750 3600 3355 3355 3600 1750 2100 2250 2200 525 1275
7@50 7@50
G1 G2a G3 G1 G2 G1 G2 G1 G2 G1 G2 G1 G2 G2 G1 G2 G1 G2 G1 G2 G1 G2 G1 G3 G2a G1
350 350
G1 G2 G3a G3b G3c G3d G3e G3f G3f G3e G3d G3c G3b G3a G2 G1
G2a G3 1-Ø12 SIDE BAR E.F. G3 G2a
G6 G6a 5-Ø12 WEB BARS E.F. 6-Ø25 TOP BARS G7 G7a G7b G6b
@ TOP FLANGE
400
400 850 850 850
L = 9000 L = 10500
L=6660 L = 10500
G6
400 400
L = 10500 850 850 L = 9000 850
L = 10500 L=6660
G6a
END OF GIRDER
END OF GIRDER
510 1675
510 1675
45@50=2250 7@50 = 350 50 END OF GIRDER
20@50=1000 25@50=1250 400
G11 5-Ø20 BARS G13b G13c
8-Ø12 BARS G12a Ø12 BAR EACH SIDE 510 1650
G4a G7 G7a G7b 6-Ø25 TOP BARS 8-Ø25 DOWEL BARS
TO MATCH G4 Ø12 TIES G2a G7 G7a G7b 6-Ø25 TOP BARS 100
G7 2-Ø25 TOP BARS G7 2-Ø25 TOP BARS 400 FOR END DIAPHRAGM
Ø12 STIRRUPS G3 Ø12 STIRRUPS G1 (EXPANSION END ONLY)
Ø12 STIRRUPS G3a
G3a
G3b
G3b Ø12 TIES G2
G3 Ø12 STIRRUPS
G3c
320
650
G12 G3d Ø12 CROSS TIES G9 G11 5-Ø20 BARS
1-Ø12 SIDE BAR E.F. G6b EACH SIDE
G3d
G3e G1 Ø12 STIRRUPS 100 G12 2-Ø20 BARS EACH SIDE
G3e
5-Ø12 WEB BARS E.F.
320
G3f
G3f
50 148
G3g
1600
1600
G6 G6a
254
G11 5-Ø20 BARS
G9b
G3g
340
G9f
711
203
315
G3g
G9e
G3g 1-Ø12 SIDE BAR E.F. G6b
148 50
G9c
254
340
G9d
Ø12 TIES G8a
G9a
Ø10 TIES G10
Ø12 TIES G8
140
650
EACH SIDE
300 700 700 VARIES 5-Ø12 WEB BARS E.F. G6a G6 500(MIN.)
8-Ø25 DOWEL BARS Ø12 CROSS TIES G9f 700 700 VARIES
LAP LAP 500(MIN.) (EXPANSION SUPPORT)
G13b G13c
G5a G5b 4-Ø25 BOT. BARS LAP 500(MIN.)
6-Ø25 BOT BARS G5 G5a G5b Ø12 CROSS TIES G9 6-Ø25 BOT BARS G5 G5a G5b Ø12 CROSS TIES G9e
8-Ø20 G8b 1-Ø12 TIE
G4 G5a G5b 4-Ø25 BOT. BARS Ø12 CROSS TIES G9d
SIDE BARS
Ø12 CROSS TIES G9c
G8b 1-Ø12 TIE
Ø12 CROSS TIES G9b
DESIGN WAIVER
GRAPHIC SCALES:
THE DESIGN CONSULTANT SHALL BE HELD FULLY
1000 500 0 1000 3000
RESPONSIBLE FOR THE FAILURE OF THE FACILITY / IES DUE
TO FAULTY DESIGN EXCEPT FOR CHANGES MADE WITHOUT SCALE 1:60
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND PSC GIRDER REINFORCEMENT DETAIL 2/2
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE
EFREN L. BACANI
PROJECT MANAGER/TEAM LEADER
JULITA B. BINGCO
HEAD, REGULATION DIVISION
ATTY. ALVIN A. CARULLO
EXECUTIVE DIRECTOR
RB1-14 -
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
℄
L/20 L/20 L/20 L/20 L/20 L/20 L/20 L/20 L/20 L/20
355.5
711
355.5
-X
℄ OF GIRDER
CABLE C5 X5 = 155 X5 = 155 X5 = 155 X5 = 155 X5 = 155 X5 = 155 X5 = 155 X5 = 155 X5 = 155 X5 = 155 X5 = 155
CABLE C4 X4 = -155 X4 = -155 X4 = -155 X4 = -155 X4 = -155 X4 = -155 X4 = -155 X4 = -155 X4 = -155 X4 = -155 X4 = -155
CABLE C3 X3 = 0 X3 = 0 X3 = 0 X3 = 0 X3 = 0 X3 = 0 X3 = 0 X3 = 0 X3 = 0 X3 = 0 X3 = 0
CABLE C2 X2 = 0 X2 = 0 X2 = 0 X2 = 0 X2 = 0 X2 = 0 X2 = 0 X2 = 0 X2 = 0 X2 = 0 X2 = 0
CABLE C1 X1 = 0 X1 = 0 X1 = 0 X1 = 0 X1 = 0 X1 = 0 X1 = 0 X1 = 0 X1 = 0 X1 = 0 X1 = 0
NOTE:
DISTANCE ARE FROM CENTERLINE OF GIRDER 1A PLAN SHOWING PRESTRESSING CABLES
RB1-15 RB1-15 SCALE 1:60
34910
L/20 L/20 L/20 L/20 L/20 L/20 L/20 L/20 L/20 L/20 14036 510 1600
500 LIFTING HOOK 8-12.7mmØ CABLE C1 CABLE C4 & C5 INTENTIONALLY ROUGHENED 500
LIFTING HOOK 8-12.7mmØ
PRESTRESSING STRANDS CABLE C2 SURFACE PRESTRESSING STRANDS
CABLE C3
Y1
Y2
Y4 & Y5
Y3
CABLE C5 Y5 = 300 Y5 = 267 Y5 = 237 Y5 = 211 Y5 = 188 Y5 = 169 Y5 = 153 Y5 = 141 Y5 = 132 Y5 = 127 Y5 = 125 PARABOLIC TENDONS
CABLE C4 Y4 = 300 Y4 = 267 Y4 = 237 Y4 = 211 Y4 = 188 Y4 = 169 Y4 = 153 Y4 = 141 Y4 = 132 Y4 = 127 Y4 = 125
CABLE C3 Y3 = 660 Y3 = 558 Y3 = 467 Y3 = 387 Y3 = 318 Y3 = 259 Y3 = 211 Y3 = 173 Y3 = 146 Y3 = 130 Y3 = 125
CABLE C2 Y2 = 980 Y2 = 839 Y2 = 714 Y2 = 603 Y2 = 506 Y2 = 425 Y2 = 358 Y2 = 307 Y2 = 270 Y2 = 247 Y2 = 240
CABLE C1 Y1 = 1300 Y1 = 1120 Y1 = 960 Y1 = 818 Y1 = 695 Y1 = 591 Y1 = 506 Y1 = 440 Y1 = 393 Y1 = 364 Y1 = 355 WARNING ON VARIATION
- INITIAL FORCE AT END OF JACK FOR CABLE 1, 2 IS 2065 kN AND CABLE 3, 4, & 5 IS 1928 kN.
NOTE: 1. ANY VARIATION IN THE NUMBER OF STRANDS PER CABLE, TYPE OF
- TOTAL JACKING FORCE 9914 kN ANCHORAGE AND STRESSING ON ONE END OR BOTH ENDS SHALL
DISTANCE ARE FROM BOTTOM OF GIRDER TO CENTER OF CABLE
1B ELEVATION SHOWING PRESTRESSING CABLES - EFFECTIVE PRESTRESSING FORCE AT SERVICE 7983 kN (AT SUPPORTS) GUARANTEE THAT THE GIRDER IS PRESTRESSED FOR ITS FULL LENGTH.
RB1-15 RB1-15 SCALE 1:60 - EFFECTIVE PRESTRESSING FORCE AT SERVICE 7094 kN (AT MIDSPAN) 2. THE CENTROID OF THE PROPOSED NEW CABLES SHALL BE THE SAME
- EACH CABLE SHALL BE STRESSED AT THE SAME TIME AT BOTH ENDS AS THAT IN THE DRAWING.
3. THE PRESTRESSING FORCE SHALL PRACTICALLY BE IDENTICAL AT
1067 1067 SEQUENCE & FORCES OF STRESSING @ END OF JACK: BOTH ENDS AND SHALL BE FULLY ACTIVE AT THE CENTERLINE OF
100
THE BEARING PADS.
CABLE C1 2065 kN CABLE C4 1928 kN
4. ALL ANCHORAGES, LIVE TYPE ANG DEAD TYPE SHALL BE SUPPORTED
127
BY APPROVED CERTIFICATES.
300
300
C1
102
5. ANY REQUEST FOR VARIATION THAT DOES NOT MEET THE ABOVE
C1 15-T12.7 G14 6 - Ø12
330 102 CABLE C3 1928 kN SHOULD NOT BE PERMITTED.
C1 15-T12.7 G14 6 - Ø12 @100
320
203
320
C2 CABLE C1
C2 15-T12.7 CONCRETE COVER:
C2 15-T12.7 G15 6 - Ø12
NOTES ON PRESTRESSING: - 40mm CLEAR UNLESS SHOWN OTHERWISE
838
CABLE C2
320
1600
C3 1. THE TYPE OF TENDONS WHICH WILL BE USED IN
C4 14-T12.7 POST TENSIONING AND ALL NECESSARY ADDITIONAL DETAILS
C3 14-T12.7 G16 6 - Ø12
254 INCLUDING THOSE FOR END ANCHORAGES, METHODS
G16 6 - Ø12 @100 CABLE C3 TO BE EMPLOYED AND PROCEDURES TO BE FOLLOWED, SHALL BE AS
360
360
C4 APPROVED BY THE ENGINEER. THE TENDONS SHALL BE DRAPED END ANCHORAGES.
125 115 115
G17 6 - Ø12
254
ON THE PLANS. AFTER SECURING THE END ANCHORAGES ALL TENDONS TENSIONING DUCTS AND ANCHORAGES, REBAR REARRANGEMENT
203
300
SHALL BE PRESSURE GROUTED IN THEIR CONDUITS IN A12ORDANCE SHALL BE DONE WITH THE APPROVAL OF THE ENGINEER.
C5 14-T12.7 WITH "SPECIFICATIONS".
C5 14-T12.7 11. HANDLING OF PRESTRESSED CONCRETE (PSC) GIRDERS: GIRDERS SHALL
200.5 155 155 200.5 200.5 155 155 200.5
2. PRESTRESSING STEEL SHALL BE SEVEN-WIRE UNCOATED LOW- BE MAINTAINED IN AN UPRIGHT POSITION AND SHALL BE LIFTED BY
711 711 SUITABLE DEVICES PROVIDED AT THE ENDS OF GIRDER.
RELAXATION STRANDS CONFORMING TO AASHTO M203 (ASTM A416)
GRADE 270. THE CONTRACTORS PROPOSED LIFTING DETAILS SHOULD
1C SECTION @ MIDSPAN 1D SECTION @ ENDS 1E SIDE VIEW @ ANCHORAGE 3. DESIGN PARAMETERS:
BE GIVEN CAREFUL CONSIDERATION BEFORE BEING SUBMITTED
ON SHOP DRAWINGS FOR APPROVAL. THE USE OF HOLES FOR
RB1-15 RB1-15 SCALE 1:20 RB1-15 RB1-15 SCALE 1:20 FRICTION CURVATURE COEFFICIENT, u=0.25/RAD LIFTING PURPOSES WILL NOT BE PERMITTED.
RB1-15 RB1-15 SCALE 1:20 FRICTION WOBBLE COEFFICIENT, K=0.005/M
12. SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW PRIOR TO
100 100 4. NON-PRESTRESSING STEEL, fy = 414 MPa (AASHTO M31 GRADE 60) FABRICATION. FABRICATION SHALL START ONLY AFTER APPROVAL
CABLE C1, C2, C3 CABLE C4 CABLE C5 OF SHOP DRAWINGS. SHOP DRAWINGS SHALL INCLUDE THE
5. CONCRETE STRENGTH FOR GIRDERS @ 28 DAYS, f'c = 50 MPa (CLASS P1)
CALCULATED ELONGATION OF THE PRESTRESSING TENDONS
6. CONCRETE STRENGTH FOR GIRDERS @ TRANSFER, f'ci = 40 MPa CORRESPONDING TO THE REQUIRED JACKING FORCE.
7. SHEATING OR DUCTS SHALL BE APPROVED BY THE ENGINEER. 13. IN CONFORMITY WITH AASHTO SECTIONS 10.1.2 AND 10.2.1 AND PRIOR
148
200.5
THEY SHALL BE STRONG ENOUGH TO WITHSTAND THE VIBRATION TO FABRICATION OR PRESTRESSED CONCRETE GIRDER, THE CONTRACTOR
OF THE CONCRETE WITHOUT SUFFERING ANY DAMAGE OR DEFORMATION SHALL PREPARE AND SUBMIT FOR REVIEW AND APPROVAL OF THE ENGINEER
50
AND SHALL BE MORTAR TIGHT. COMPLETE PLANS, DETAILED DRAWINGS, STRUCTURAL DESIGN CALCULATION AND
8. END ANCHORAGE DEVICE: OTHER NECESSARY PRESENTATION COVERING THE UNDERTAKING OF THE
a) ANCHORAGE DEVICE SHALL WITHSTAND A FORCE OF NOT CONTRACTOR AND IN CONSIDERATION OF THE FOLLOWING:
711
315
PORTIONS SHALL BE PROTECTED FROM CORROSION AT ALL TIMES. c) HANDLING AND TRANSPORT SYSTEM TO TRANSFER PRECAST PSC GIRDERS
FROM CASTING YARD TO BRIDGE SITE;
200.5
PLUGS UNTIL USED. THE ANCHORAGE DEVICES SHALL BE d) ERECTION EQUIPMENT AND PROCEDURE TO BE UTILIZED TO INSTALL PSC
KEPT FREE FROM MORTAR, LOOSE RUST, GREASE, TAR GIRDERS IN FINAL POSITION.
PAINT, OIL, MUD OR ANY OTHER COATING.
1F PLAN @ ANCHORAGE FOR C1, C2 & C3 1G PLAN @ ANCHORAGE FOR C4 & C5 GRAPHIC SCALES:
RB1-15 RB1-15 SCALE 1:10 RB1-15 RB1-15 SCALE 1:10 DESIGN WAIVER
1 PSC GIRDER CABLE LAYOUT AND DETAILS THE CONFORMITY OF THE CONSULTANTS.
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B PSC GIRDER CABLE LAYOUT AND DETAILS
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO
A3 = 1:2
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
RB1-15 -
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
COMPRESSIVE STRENGTH OF CONCRETE, f'c = 50 MPa
YIELD STRENGTH OF REINFORCING BAR, fy = 414MPa
SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES
a a
a a d c c e d a a
f
i b a a g b g b e d b
e a a c a a a c e
e
hg c e f c b b d a d b
d b b b a d c b f c f c f c
b d c c b b c
g b e d g
f e e d b d
a a a c
c b e
A B C D E F G H I J K L M N O P Q R
BAR SHAPE
DIMENSIONS (OUT TO OUT) LENGTH TOTAL UNIT
BAR SIZE SPACING (mm)
BAR
PER BAR LENGTH WEIGHT
TOTAL CONCRETE
ITEM QTY
MARK (mm) SHAPE a b c d e f g h i WEIGHT (kg) VOLUME (m3)
(mm) (m) (kg/m)
REINFORCING BARS
G2 12 206 VARIES A 990 70 320 335 55 55 335 320 70 2550 525.30 0.888 466.37
G3 12 124 VARIES C 635 1710 110 110 1710 4275 530.10 0.888 470.63
G3a 12 2 AS SHOWN C 560 1710 110 110 1710 4200 8.40 0.888 7.46
G3b 12 2 AS SHOWN C 485 1710 110 110 1710 4125 8.25 0.888 7.32
G3c 12 2 AS SHOWN C 415 1710 110 110 1710 4055 8.11 0.888 7.20
G3d 12 2 AS SHOWN C 335 1710 110 110 1710 3975 7.95 0.888 7.06
G3e 12 2 AS SHOWN C 260 1710 110 110 1710 3900 7.80 0.888 6.92
G3f 12 2 AS SHOWN C 260 1710 110 110 1710 3900 7.80 0.888 6.92
G5a 25 2 AS SHOWN I 9000 12000 10500 8580 40080 80.16 3.853 308.89
G5b 25 2 AS SHOWN I 12000 12000 10500 5580 40080 80.16 3.853 308.89
G6a 12 5 AS SHOWN I 10500 10500 9000 6660 36660 183.30 0.888 162.74
G6b 12 2 AS SHOWN I 5760 9000 9000 10500 34260 68.52 0.888 60.83
G6c 20 2 AS SHOWN I 10500 10500 10500 7560 39060 78.12 2.466 192.66
G7a 25 2 AS SHOWN I 9000 12000 13500 7410 41910 83.82 3.853 322.99 24.86
G7b 25 2 AS SHOWN I 12000 13500 10500 5640 41640 83.28 3.853 320.91
G8 12 124 VARIES F 630 150 525 55 55 525 150 2090 259.16 0.888 230.09
G8a 12 120 VARIES N 630 150 380 275 275 380 150 2240 268.80 0.888 238.64
G10 10 536 VARIES E 155 110 110 375 201.00 0.617 123.92
G14 12 12 AS SHOWN R 620 320 620 320 110 110 2100 25.20 0.888 22.37
G15 12 12 AS SHOWN R 620 320 620 320 110 110 2100 25.20 0.888 22.37
G16 12 12 AS SHOWN R 620 320 620 320 110 110 2100 25.20 0.888 22.37
G17 12 12 AS SHOWN R 620 320 620 320 110 110 2100 25.20 0.888 22.37
TOTAL WEIGHT OF TWELVE (12) GIRDERS FOR TWO (2) CARRIAGEWAYS: 71274.72 298.36
DOWEL BARS
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+949.986 - STA 27+113.397
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B PSC GIRDER SCHEDULE OF REINFORCEMENT
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO
A3 = 1:2 AND ESTIMATED QUANTITIES
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
RB1-16 -
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
14943 15688
CB4c CB4d
CB4a CB4b CB4a CB4b CB4a CB4b CB4c CB4d CB4c CB4d CB4e CB4f CB4e CB4f CB4e CB4f
Ø12 @ 300 STAGGERED
Ø20 STIRRUPS Ø20 STIRRUPS 8-Ø20 STIRRUPS BW3 Ø20 VERT. BARS Ø16 HOR. BARS
Ø20 8-Ø20 Ø20 STIRRUPS Ø20 STIRRUPS 8-Ø20 STIRRUPS Ø20 STIRRUPS CROSS TIES BW1 @ 150 E.F. (MAX) BW2
@ 125(TYP.) @125 (TYP.) (TYP.) @ 200 E.F. (MAX)
STIRRUPS STIRRUPS (TYP.) @125 (TYP.) @125 (TYP.) (TYP.) @125 (TYP.)
@125 (TYP.)
2079
1975
CB1c 16-Ø32 TOP BARS
CB1b 16-Ø32 TOP BARS
CB1a 16-Ø32 TOP BARS
5-Ø32 SIDE
CB1a CB1b CB1c 16-Ø32 TOP BARS CB2 16-Ø32 BOT BARS CB6 5-Ø32 LONGI.
5-Ø32 SIDE BARS E.F.
CB3
BARS E.F. A CB3
SIDE BARS E.F.
2830 2830
1747
B
1500
100
2000
8-Ø20 STIRRUPS 8-Ø20 STIRRUPS
CB4a CB4b CB4c CB4d CB4e CB4f (TYP.)
(TYP.)
8-Ø20 STIRRUPS
CB2 16-Ø32 BOT BARS
(TYP.)
450
Ø16 DOWEL
BW6
BARS @ 300
310
2-Ø25 HOR.
BW4
BARS
300
Ø12 STAGGERED
BW3 Ø20 STIRRUPS @ 125 Ø20 STIRRUPS @ 125
Ø16 BARS CROSS TIES @ 300 8-Ø20 STIRRUPS
BW5 300
@ 100
CB4 CB4 CB4
Ø12 CROSS TIES Ø20 VERT. BARS @150 E.F. 250 250 250 250 250 250 250
CB5 BW1
@ 450 (MAX) (MAX)
CLR
50
1000
MIN
600
CB3
SIDE BARS E.F.
1000
CB4a CB4c CB4e Ø20 STIRRUPS
CLR
100
CLR
50
CB4b CB4d CB4f Ø20 STIRRUPS BOT BARS 1800Ø BORED PILE
DESIGN WAIVER
Ø16 STIRRUPS COPING BEAM
250 1500 250 250 1500 250 THE DESIGN CONSULTANT SHALL BE HELD FULLY
RESPONSIBLE FOR THE FAILURE OF THE FACILITY / IES DUE
TO FAULTY DESIGN EXCEPT FOR CHANGES MADE WITHOUT
2000 2000 THE CONFORMITY OF THE CONSULTANTS.
GRAPHIC SCALES:
1000 500 0 1000 3000
SCALE 1:50
1 ABUTMENT A REINFORCEMENT COPING PLAN, ELEVATION AND SECTION DETAILS 1000 500 0 1000
RB1-17 RB1-17 SCALE AS SHOWN SCALE 1:30
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 TO STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
ABUTMENT A COPING REINFORCEMENT PLAN,
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 ELEVATION AND SECTION DETAILS
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-17 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
15689
14943
Ø16 HOR. BARS
Ø12 @ 300 STAGGERED BW3 BW2
571 1800 1703 2497 1800 954 3246 1800 572 Ø20 VERT. BARS @ 200 E.F. (MAX)
CROSS TIES BW1 @ 150 E.F. (MAX)
CB4a CB4b CB4a CB4b CB4a CB4b CB4c CB4d CB4c CB4d CB4c CB4d CB4e CB4f CB4e CB4f CB4e CB4f
Ø20 STIRRUPS 8-Ø20 STIRRUPS Ø20 STIRRUPS Ø20 STIRRUPS 8-Ø20 STIRRUPS Ø20 STIRRUPS Ø20 STIRRUPS 8-Ø20 STIRRUPS Ø20 STIRRUPS
@125 (TYP.) (TYP.) @125 (TYP.) @125 (TYP.) (TYP.) @125 (TYP.) @125 (TYP.) (TYP.) @125 (TYP.)
2086
CB1a CB1b CB1c 16-Ø32 TOP BARS 16-Ø32
1960
CB3
5-Ø32 SIDE
CB2 16-Ø32 BOT BARS 16-Ø32 CB1c
BARS E.F. 16-Ø32 CB1b TOP BARS
CB1a TOP BARS
5-Ø32 SIDE TOP BARS
CB6 5-Ø32 LONGI.
BARS E.F. CB3a
SIDE BARS E.F.
2830
2830
2000
100
1769
1500
A
8-Ø20 STIRRUPS 8-Ø20 STIRRUPS
CB4a CB4b CB4c CB4d 8-Ø20 STIRRUPS CB4e CB4f (TYP.)
B (TYP.)
CB2 16-Ø32 BOT BARS
(TYP.)
275
Ø16 DOWEL
BW6
BARS @ 300
310
Ø16 HOR. BARS
BW2
@ 200 E.F. (MAX)
300
2-Ø25 HOR.
BW4
BARS
300
Ø20 STIRRUPS @ 125 8-Ø20 STIRRUPS Ø20 STIRRUPS @ 125
Ø12 STAGGERED
BW3 CB4 CB4 CB4
Ø16 BARS CROSS TIES @ 300
BW5 300 250 250 250 250 250 250 250
2495
@ 100
CLR
50
1000
CLR
MIN
5-Ø32 LONGI. 600
1500
129
CB3
SIDE BARS E.F.
1000
129 129
CB4a CB4c CB4e Ø20 STIRRUPS
CLR
CLR
100
50
CB2a CB2b 16-Ø32 BOT BARS
BOT BARS 1800Ø BORED PILE
1C SECTION
RB1-18 RB1-18 SCALE 1:30
GRAPHIC SCALES:
1000 500 0 1000 3000
SCALE 1:50
1 ABUTMENT B COPING REINFORCEMENT PLAN, ELEVATION AND SECTION DETAILS 1000 500 0 1000
RB1-18 RB1-18 SCALE AS SHOWN SCALE 1:30
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 TO STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
ABUTMENT B COPING REINFORCEMENT PLAN,
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 ELEVATION AND SECTION DETAILS
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-18 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
COMPRESSIVE STRENGTH OF CONCRETE, f'c = 31MPa
YIELD STRENGTH OF REINFORCING BAR, fy = 414MPa
SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES
5079
8041 a b
c
a
c a
f
a a
e
a d b b b
b b c d
CB1c
900
900
e
CB1a c c
900 a
8031 A B C D E F G
CB1a CB1b CB1c 16-Ø32 TOP BARS
900
DIMENSIONS (OUT TO OUT) TOTAL UNIT TOTAL
BAR SIZE BAR LENGTH PER CONCRETE
ITEM QTY SPACING (mm) LENGTH WEIGHT WEIGHT
MARK (mm) SHAPE BAR (mm) VOLUME (m3)
(m) (kg/m) (kg)
a b c d e f
900
CB2a
CB2a 32 16 AS SHOWN A 900 11100 12000 192.00 6.313 1212.16
CB2 16-Ø32 BOT BARS
CB2b 32 16 AS SHOWN A 900 7218 8118 129.89 6.313 820.03
CB2b
CB4a 20 34 125 D 1900 1325 1900 1325 230 230 6910 234.94 2.466 579.40 50.99
CB2b 2840
900
COPING
CB4b 20 34 125 D 910 1325 910 1325 230 230 4930 167.62 2.466 413.38
900
BEAM
CB2 16-Ø32 BOT BARS CB4c 20 44 125 D 1900 1477 1900 1477 230 230 7214 317.42 2.466 782.80
CB2a CB4d 20 44 125 D 910 1477 910 1477 230 230 5234 230.30 2.466 567.94
11100 CB4e 20 46 125 D 1900 1595 1900 1595 230 230 7450 342.70 2.466 845.15
CB4f 20 46 125 D 910 1595 910 1595 230 230 5470 251.62 2.466 620.53
BW2b
5084
BW2a
Ø16 HOR. BARS
BW2
@ 200 E.F. (MAX)
BW2b 1420
11925
11925
BW4b
BW4b
2210
11925
GRAPHIC SCALE:
1000 500 0 1000 3000
1 ABUTMENT A & B COPING REINFORCEMENT LAYOUT, SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES SCALE 1:50
RB1-19 RB1-19 SCALE 1:50
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 TO STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND
ABUTMENT A & B COPING REINFORCEMENT LAYOUT,
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-19 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
Ø20@75 SPIRAL TIES
3190
MATCH LINE
ABUTMENT BACKWALL
P3
P2b
Ø20@200 SPIRAL TIES
ABUTMENT COPING BEAM
2000
1120
P4 Ø20@200 SPIRAL TIES
P4
550 550
1500
SPIRAL TIES
Ø20@100
650
650
P8
3190
3190
12000
GROUTED RIPRAP
P3
P3 Ø20@75 SPIRAL TIES
1B
P1b
Ø20@200 SPIRAL TIES
RB1-20 RB1-21
1310
FGL
P4
P2a 18-Ø36 VERTICAL BARS
P1 P2
Ø20@75 SPIRAL TIES
8450
RB1-20 RB1-21
7800
12000
3190
3190
P3
12950
P3
P4 Ø20@200 SPIRAL TIES
P2b
3190
1120
P4
Ø20@200 SPIRAL TIES
P4
3190
3190
12000
STEEL CASING, L=26.0m from NGL
P3
12000
P1b
3190
3190
P4
P1d 18-Ø36 VERTICAL BARS
P2b
P4 Ø20@200 SPIRAL TIES
P3
P4
10860
NOTES ON CAGE INSTALLATION:
1E
LENGTH OF BORED PILE, L = 42000
THE REINFORCING STEEL CAGES CONSISTING OF THE STEEL SHOWN ON THE PLANS
P5 2-Ø20@2000
3190
3190
STIFFENER RING PLUS CAGE STIFFENER BARS, SPACERS, AND OTHER NECESSARY
RB1-20 RB1-21 APPURTENANCE SHALL BE COMPLETELY ASSEMBLED AND PLACED AS A UNIT IMMEDIATELY
Ø20@75 SPIRAL TIES
P2c
18-Ø36 VERTICAL BARS
6-Ø20 SPACER BARS CONCRETE PLACEMENT. THE REINFORCING CAGES SHALL BE RIGIDLY BRACED TO RETAIN
P6 @2000 (MAX VERT SPCG)
ITS CONFIGURATION DURING HANDLING AND CONSTRUCTION. INDIVIDUAL OR LOOSE BARS
P3
SHALL NOT BE USED.
3190
3190
12000
6360
NOTES ON LAP WELD CONNECTION:
Ø20@200 SPIRAL TIES
P2c
"STRUCTURAL WELDING CODE REINFORCEMENT STEEL".
P4 Ø20@200 SPIRAL TIES
P1b
2. CARE SHALL BE TAKEN NOT TO DAMAGE THE BORED PILE MAIN BARS DURING WELDING.
Ø20@200 SPIRAL TIES
3. SPIRAL REINFORCEMENT AND CONFINEMENT RINGS SHALL BE FULL STRENGTH LAP DOUBLE
FLARED V-GROOVE BUTT WELD
3270
4. CONFINEMENT RING REINFORCEMENT SHALL BE FULL STRENGTH SINGLE V-GROOVE BUTT WELD
1310
P4
1F
P4
RB1-20 RB1-21
900 900
CLR
CLR
CLR
Ø20@75 SPIRAL TIES
100
100
100
TIP OF PILE TIP OF PILE
1800
12000
3190
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND ABUTMENT BORED PILE
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 REINFORCEMENT DETAILS (1/2)
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-20 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
133 133 133 COMPRESSIVE STRENGTH OF CONCRETE, f'c = 31MPa
YIELD STRENGTH OF REINFORCING BAR, fy = 414MPa
P1a 18-Ø36 VERT BARS P1b 18-Ø36 VERT BARS P1c 18-Ø36 VERT BARS
100
100
100
SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES
P2a 18-Ø36 VERT BARS P2b 18-Ø36 VERT BARS P2c 18-Ø36 VERT BARS
b b
a a
P3 Ø20@75 SPIRAL TIES P3 Ø20@75 SPIRAL TIES P4 Ø20@200 SPIRAL TIES b a
a
b
a
c c
1800
1800
1800
1600
1600
1600
A B C D E
BAR SHAPE
100
100
(mm) (m) (kg/m) (m3)
a b c d
6-Ø20 SPACER BARS 6-Ø20 SPACER BARS 6-Ø20 SPACER BARS
P6 P6 P6
@2000 (MAX VERT SPCG) @2000 (MAX VERT SPCG) @2000 (MAX VERT SPCG)
P1a 36 18 AS SHOWN A 550 12950 13500 243.00 7.990 1941.65
1B SECTION 1C SECTION 1D SECTION
RB1-20 RB1-21 SCALE 1:20 RB1-20 RB1-21 SCALE 1:20 RB1-20 RB1-21 SCALE 1:20 P1b 36 54 AS SHOWN B 12000 12000 648.00 7.990 5177.73
133 P7 7-Ø20@200 E.W. @ TOP OF PILE P2b 36 54 AS SHOWN B 12000 12000 648.00 7.990 5177.73
700
LAP
100
1600
1600
P7 20 14 200 E 200 (max.) 150 3700 51.80 2.466 127.75
60°
SPIRAL
100
1I SPACER/STIFFENER DETAIL 1J SPLICE DETAIL THE DESIGN CONSULTANT SHALL BE HELD FULLY
RESPONSIBLE FOR THE FAILURE OF THE FACILITY / IES DUE
RB1-21 RB1-21 NOT TO SCALE RB1-21 RB1-21 NOT TO SCALE TO FAULTY DESIGN EXCEPT FOR CHANGES MADE WITHOUT
THE CONFORMITY OF THE CONSULTANTS.
GRAPHIC SCALES:
1 ABUTMENT BORED PILE REINFORCEMENT DETAILS (2/2) 500 0 500 1000
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND ABUTMENT BORED PILE
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 REINFORCEMENT DETAILS (2/2)
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-21 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
A B
4000 456 4000 456
1C 1D 1C
1D RB1-22 RB1-22 RB1-22 RB1-22
RB1-22 RB1-22 RB1-22 RB1-22
1100
W3 1-Ø25 ADD'L TOP BAR
W3 1-Ø25 ADD'L TOP BAR Ø25 HOR BARS @ 150 (MAX)
Ø25 HOR BARS @ 150 (MAX) W3 1-Ø25 ADD'L TOP BAR W5b Ø16 HOR BARS @ 150(MAX)
W5b (INNER FACE) W1
Ø16 HOR BARS @ 150(MAX) (INNER FACE) Ø16 HOR BARS @ 150(MAX) (OUTER FACE)
W1 W1 Ø16 HOR BARS @ 150 (MAX)
(OUTER FACE) (OUTER FACE) Ø25 HOR BARS @ 150(MAX)
900~921
Ø16 HOR BARS @ 150 (MAX) W4b
VARIES
W4b (OUTER FACE) W2 (INNER FACE)
Ø25 HOR BARS @ 150(MAX) (OUTER FACE) Ø25 HOR BARS @ 150(MAX)
W2 W2
(INNER FACE) (INNER FACE)
921
900
1966
(INNER FACE)
1977
3371
W5a
Ø25 HOR BARS @ 150 (MAX) W5a Ø25 HOR BARS @ 150 (MAX) W4b
Ø16 HOR BARS @ 150 (MAX)
(INNER FACE) (INNER FACE) (OUTER FACE)
2450
Ø25 HOR BARS @ 150 (MAX)
W4a
Ø16 HOR BARS @ 150 (MAX) W4a Ø16 HOR BARS @ 150 (MAX) W5a
(OUTER FACE) (OUTER FACE) (INNER FACE)
Ø16 HOR BARS @ 150 (MAX)
W4a
Ø12 STAGGERED (OUTER FACE)
Ø12 STAGGERED
1F
2450
CROSS TIES @ 400 Ø12 STAGGERED CROSS
2456
W8
CROSS TIES @ 400 HOR. W8
@300 VERT.
1F HOR. 300 VERT. RB1-22 RB1-22 W8 TIES @ 400 HOR. 300
1500~1540
RB1-22 RB1-22
1500~1545
VERT.
Ø20 VERT BARS
Ø20 VERT BARS W7 W6 3-Ø25 CONT EDGE BARS
W7 @200 E.F.
@ 200 E.F.
INNER FACE
OUTER FACE
3-Ø25 CONT EDGE BARS W6
3-Ø25 CONT EDGE BARS W6
600
b c
b a
b c c E F
A a a a
A B a c
a
B
d
C D b
b
b c
BAR SHAPE
4000 DIMENSIONS (OUT TO OUT) LENGTH UNIT
BAR SIZE SPACING BAR TOTAL TOTAL
APPROACH RAILING ITEM QTY EACH BAR WEIGHT VOLUME (m3)
Ø25 HOR BARS @ MARK (mm) (mm) SHAPE a b c d e f (mm)
LENGTH (m)
(kg/m)
WEIGHT (kg)
W2 150(MAX) (OUTER FACE) AS
W1 16 6 A 150 4350 250 4750 28.50 1.578 44.98
APPROACH SLAB SHOWN
W3 1-Ø25 ADD'L TOP BAR Ø12 STAGGERED ABUTMENT AS
BACKWALL CORBEL W2 25 6 B 150 3650 710 250 4760 28.56 3.853 110.05
W8 CROSS TIES 450 BACKWALL SHOWN
Ø25 HOR BARS @ 150(MAX) @ 400 HOR. 300 VERT. AS
W2 W3 25 1 A 150 4350 250 4750 4.75 3.853 18.30
(INNER FACE) SHOWN
INNER FACE AS
W4a 16 7 E 150 4670 4820 33.74 1.578 53.25
W7 Ø20 VERT BARS @ 200 E.F. SHOWN
600
557~921
VARIES
AS
350
W-1 SHOWN
W7 Ø20 VERT BARS @ 200 E.F. AS
W5b 25 9 B 150 3650 710 250 4760 42.84 3.853 165.08
Ø16 HOR BARS @ 150 (MAX) SHOWN
W4b W1 Ø16 VERT BARS @ 150 E.F. (OUTER FACE) AS
(OUTER FACE) W6 25 3 F 918 4375 1970 7263 21.79 3.853 83.96
Ø25 HOR BARS @ 150 (MAX) SHOWN
W5b W6 3-Ø25 CONT EDGE BARS AS
(INNER FACE) W7 20 40 B 150 3650 710 250 4760 190.40 2.466 469.56
SHOWN
TOP OF COPING BEAM AS
W6 3-Ø25 CONT EDGE BARS
Ø12 STAGGERED CROSS
1E SECTION W8 12 17
SHOWN
C 110 535 100 745 12.67 0.888 11.24
1:40
TOTAL WEIGHT OF ONE (1) W-1 WINGWALL: 1,179.54 4.33
W8 TIES @ 400 HOR. 300 RB1-22 RB1-22 SCALE
VARIES
AS
OUTER FACE
AS
594
DESIGN WAIVER
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND WINGWALL REINFORCEMENT SECTION AND
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 DETAILS, SCHEDULE OF REINFORCEMENT
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-22 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR AND ESTIMATED QUANTITIES
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
14991
1C
RB1-04 Ø16 LONGI. BOT
RB1-04 S4 Ø16 LONGI. TOP
BARS @ 250 S3
BARS @ 250
0
100
10300
1850
S3a
S3b Ø16 LONGI. TOP
S3
200
BARS @ 250
200
6157
6157
0
500
1850
S3b
S3a
Ø16 LONGI. TOP
200
S3
200
BARS @ 250
10300
0
400
10300
WINGWALL S4a
1850
200
S4b
200
Ø16 LONGI. BOT
S4
14388 6157
BARS @ 250
10
10 6157
1850
S4b
S4a
200
Ø16 LONGI. BOT
A S4
200
BARS @ 250
10300
10
10300
B S6a 1850
S6b
200
S6 Ø16 LONGI. TOP & BOT BARS @ 250
200
10mm PREFORMED EXPANSION 6462
200
BARS @ 250 S6a
200
S6 Ø16 LONGI. TOP & BOT BARS @ 250
10300
ABUTMENT COPING
15688
14991
Ø16 LONGI. TOP & BOT BARS @ 250 S6 Ø25 TRANS. TOP & BOT BARS @ 250 S5
1000
50
SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES
a A B
200
300
b b b APPROACH SLAB
a c a
B 5000
50
A c C
10mm PREFORMED EXPANSION
BAR SHAPE 50mm THK
JOINT CORK FILLER WITH 12x12mm
300
LENGTH TOTAL UNIT CONCRETE LEAN LEAN CONCRETE
S3 Ø16 LONGI. TOP BARS @ 250 SEALANT
BAR SIZE QTY SPACING BAR DIMENSIONS (OUT TO OUT) EACH BAR LENGTH WEIGHT TOTAL
VOLUME CONCRETE
ITEM WEIGHT (kg)
MARK (mm) (mm) SHAPE
(mm) (m) (kg/m) (m3) VOLUME (m3) CONCRETE SEAT PAD EXPANSION JOINT
a b c S1 Ø16 TRANS. TOP BARS @ 250 DECK SLAB
S1 16 62 250 A 200 4486 200 4886 302.93 1.578 478.13 TOP OF PAVEMENT
300
S2 25 77 200 A 200 4486 200 4886 376.22 3.853 1449.72 COMPACTED BASE COURSE
250
300
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND APPROACH SLAB REINFOREMENT DETTAILS,SCHEDULE
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 OF REINFORCEMENT AND ESTIMATED QUANTITIES
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-23 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
WINGWALL
1348 2625 2625 2625 2625 2625 1215
SK4
Ø20@125 (MAX)
HOR HOOPS (TYP)
SK1b 4-Ø20 ADD'L U-BARS SK2
Ø20@125 (MAX)
HOR HOOPS (TYP)
A
450
533
B
50
500
500
2000
SK3a 14-Ø20 U-BARS
SK3a 14-Ø20 U-BARS
1804 1804 1804 1804 1804 SK1d 14-Ø20 U-BARS SK1a 14-Ø20 U-BARS Ø20@125(MAX)
SK1c 14-Ø20 U-BARS SK1a 14-Ø20 U-BARS SK4
Ø20@125(MAX) SK1a 14-Ø20 U-BARS HOR HOOPS (TYP)
SK4
HOR HOOPS (TYP)
119
MIN.
128
750
1348 2625 2625 2625 2625 2625 1215
130
MIN.
750
139
1769
1500
GRAPHIC SCALE:
1 ABUTMENT COPING SHEAR KEY AND END BLOCK REINFORCEMENT DETAILS, SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES 1000 500 0 1000 3000
RB1-24 RB1-24 SCALE AS SHOWN SCALE 1:50
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND ABUTMENT COPING SHEAR KEY AND END BLOCK
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 REINFORCEMENT DETAILS AND SCHEDULE
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-24 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
ABUT. ABUT.
A B
EXP. EXP.
36000
SPAN 1
489 489
54 54
GAP GAP
A A A A A A A A A A
1C 1B
RB1-25RB1-25 RB1-25RB1-25
3471
SEGMENT LENGTH (TYP.) 1D
20 20 RB1-25 RB1-25 COMPRESSIVE STRENGTH OF CONCRETE, f'c = 31MPa
450 YIELD STRENGTH OF REINFORCING BAR, fy = 414MPa
20mm PREFORMED JOINT FILLER P4 Ø16 L-SHAPED BARS @ 150 P1 14-Ø12 HOR. BARS
P2 Ø16 BARS @ 150 SCHEDULE OF REINFORCEMENT AND ESTIMATED QUANTITIES
P3 Ø16 BARS @ 150 165 75 210
b
c d
c
150
d
a a b b
a a
e
100
A
1100
C D
625
100 B
P2 Ø16 BARS @ 150
BAR SHAPE
P1 14-Ø12 HOR BARS DIMENSIONS (OUT TO OUT) LENGTH TOTAL UNIT CONCRETE
BAR SIZE QTY SPACING BAR TOTAL
1100
ITEM EACH BAR LENGTH WEIGHT VOLUME
R25 MARK (mm) (mm) SHAPE WEIGHT (kg)
220
250
2-100mmØ PIPE P2 16 24 150 B 850 110 80 140 250 1430 34.32 1.578 54.17 0.90
1B PARAPET REINFORCEMENT DETAIL CONDUIT TYPE A
PARAPET
P3 16 24 150 C 250 400 450 150 1250 30.00 1.578 47.35
RB1-25 RB1-25 SCALE 1:20 P3 Ø16 BARS @ 150 P4 16 24 150 D 250 1000 1250 30.00 1.578 47.35
TOTAL FOR ONE (1) TYPE A PARAPET: 192.409 0.896
225
A B TOTAL FOR FORTY (40) TYPE A PARAPETS: 7696.354 35.821
DRIP MOLD AS
P1 12 14 SHOWN A 4405 4405 61.67 0.888 54.75
4000 465 P2 16 31 150 B 850 110 80 140 250 1430 44.33 1.578 69.97 1.15
SEE SLAB DETAILS APPROACH P3 16 31 150 C 250 400 450 150 1250 38.75 1.578 61.16
PARAPET P4 16 31 150 D 250 1000 1250 38.75 1.578 61.16
1D P4 Ø16 L-SHAPED BARS @ 150 P1 14-Ø12 HOR. BARS
RB1-25 RB1-25 TOTAL FOR ONE (1) APPROACH PARAPET: 247.040 1.152
R2 P2 Ø16 BARS @ 150
P3 Ø16 BARS @ 150
TOTAL FOR EIGHT (8) APPROACH PARAPETS: 1976.322 9.216
00 350
NOTE: ALL QUANITIES SHALL BE VERIFIED DURING CONSTRUCTION
1D SECTION
RB1-25 RB1-25 SCALE 1:10
1100
GRAPHIC SCALES:
5000 0 5000
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND PARAPET WALL REINFORCEMENT DETAIL,
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 SCHEDULE OF REINFORCEMENT
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-25 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR AND ESTIMATED QUANTITIES
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
CL OF GIRDER/RISER
BEARING PAD
R2 Ø12@100(MAX)
RISER
OF GIRDER/RISER/
CL BEARING PAD
CL OF GIRDER/RISER/
CLR
50
700 BEARING PAD
660 ELASTOMERIC
BEARING PAD
700
RISER BEARING PAD
CL OF RISER/
Ø12 TIES R3
R1 R2 Ø12@100(MAX)
SLOPE 0.0%
700 TOP OF RISER TOP OF RISER
50
TOP OF COPING TOP OF COPING
R1 Ø12@100(MAX)
20°
140 (MAX.)
50 50
50 (MIN.)
10mm THK
(MIN.)
CLR
RECESSED AREA
50
400
ROUGHENED SURFACE
50 50
BEFORE GROUTING
CLR CLR
700
COPING
a
e
f
b
d b
a c
BAR SHAPE
DIMENSION (OUT TO OUT) UNIT
LENGTH PER TOTAL TOTAL CONCRETE
ITEM BAR MARK BAR SHAPE SPACING (mm) QTY BAR SIZE WEIGHT
a b c d e f BAR (m) LENGTH (m) WEIGHT (kg) VOLUME (m3)
(kg/m)
R1 A 100 7 12 535 600 535 1.67 11.7 0.888 10.4
R2 A 100 7 12 535 600 535 1.67 11.7 0.888 10.4 DESIGN WAIVER
RISER 0.05
THE DESIGN CONSULTANT SHALL BE HELD FULLY
R3 B AS SHOWN 1 12 600 600 600 600 110 110 3.60 3.6 0.888 3.2 RESPONSIBLE FOR THE FAILURE OF THE FACILITY / IES DUE
TO FAULTY DESIGN EXCEPT FOR CHANGES MADE WITHOUT
TOTAL WEIGHT FOR 1 RISER: 24.0 THE CONFORMITY OF THE CONSULTANTS.
SCALE 1:20
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 BANTILAN RIVER BRIDGE (RB1)
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 STA. 25+913.986 - STA. 25+949.986
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND RISER REINFORCEMENT DETAILS, SCHEDULE OF
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 REINFORCEMENT AND ESTIMATED QUANTITIES
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-26 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN
BEG.OFBRIDGE ENDOFBRIDGE
ABUT. ABUT.
STA.2 5+913.986 STA.2 5+949.986
EL.= 6.463
BACKOFBACKWALL
A B EL.= 6.449
BACKOFBACKWALL
N: 1,625,935.436 EXP. EXP. N: 1,625,959.752
E: 492,668.001 36000 E: 492,641.455
TOTAL LENGTH OF BRIDGE (BACK TO BACK OF BACKWALL)
534 34932 534
GIRDER LENGTH
100mmØBD
PSC GIRDER (AASHTO TYPE V) (TYP. TO 7)
6911
LANE
ABUT.
3500
ABUT.
ALL
LAB
A B
B
TO MALABON
KW
S
SLA
ALL
14700
ACH
BAC
EXP. EXP.
KW
LANE
H
3500
O
BA C
OA
PP R
R
A
APP
BACKOFBACKWALL BACKOFBACKWALL
N: 1,625,935.436 N: 1,625,959.752
℄ OF MAIN ALIGNMENT
15000
100mmØBD
(TYP. TO 21)
2500x1400mm COPING BEAM
SHOULDER
INNER
1000
2000x1500(min) 2000x1500(min)
ABUTMENT COPING ABUTMENT COPING
LANE
3500
LL
B
LENGTH = 42m
TO NMIA
SLA
LANE
WA
3500
LAB
ALL
14773
H
S
OAC
KW
BA
ACH
R
A
PILE TIP
O
APP
PILE TIP
B
LANE
R
3500
ELEV. = -39.637m
P
ELEV. = -39.598m
AP
1B GENERAL ELEVATION
SHOULDER
OUTER
2500
BRIDGE DRAIN 1
3000 5000
SEE DETAIL RB1-27 S-6
400mm THK END DIAPHRAGM 100mmØBD
(TYP. TO 7)
WINGWALL
1A GENERAL PLAN
RB1-27 RB1-27 SCALE 1:200
DESIGN WAIVER
GRAPHIC SCALE:
1 RIVER BRIDGE DRAIN 5000 0 5000 10000
CONSULTANTS: SUBMITTED BY: PROJECT TITLE: REVISIONS SCALE FACTOR: SHEET CONTENT: DRAWING NO.
REV. DATE DESCRIPTION
SMC Northern Access Link Greater Capital Region Integrated Expressways A1 = 1:1 NALEX PHASE 1 SECTION 1
CHECKED AND REVIEWED BY: INDEPENDENT CONSULTANT RECOMMENDING APPROVAL: APPROVED BY:
Expressway Corp. RENARDET
Network - Component 1 BANTILAN RIVER BRIDGE (RB1)
CONSULTING ENGINEERS Northern Access Link Expressway (NALEX) A2 = 1:1.4 SHEET NO. SIZE
Geneva - SWITZERLAND STA. 25+913.986 TO STA. 25+949.986
MARIA CHERRY A. DELOS REYES EDWIN D. PRIETO NORBERTO A. CONTI
(SEE COVER SHEET FOR SIGNATURE) (SEE COVER SHEET FOR SIGNATURE)
Phase 1 Section 1B A3 = 1:2 RIVER BRIDGE DRAIN
EFREN L. BACANI JULITA B. BINGCO ATTY. ALVIN A. CARULLO RB1-27 -
PROJECT MANAGER STRUCTURAL ENGINEER AUTHORIZED REPRESENTATIVE PROJECT MANAGER/TEAM LEADER HEAD, REGULATION DIVISION EXECUTIVE DIRECTOR
LOCATION: MALABON, OBANDO, & MEYCAUAYAN, BULACAN