Professional Documents
Culture Documents
WORKING DRAWING
A B C D E G H I J K L M N O P
NATURAL HISTORY
MUMTI +12.05
MUSEUM
4M
FIRST FLOOR +4.9
CORRIDOR TOILET CORRIDOR
SHEET TITLE:
4M
COURTYARD COURTYARD
COURTYARD
STORE ROOM PLINTH LVL +0.75
LVL+0.15
0.6
TOILET
GROUND LVL +0.15
ERL+0
SECTIONS
BASEMENT -3.0
LEGEND
SECTION A-A' FACADE
H F E D C B A 6 13 14 20 A B C D E F G H
1. STONE
MUMTI +12.05 CLADDING
1.0 1.20.8
ROOF TOP +11.25
PARAPET WALL +10.05
ROOF LVL +9.05 2. FIBER CEMENT
PANELS
PIPE 100DIA.
4M
EXHIBITION EXHIBITION
HALL HALL
CORRIDOR FIRST FLOOR +4.9
4M
WAITING
AREA CAFETRIA
CORRIDOR GALLERY
GALLERY PLINTH LVL +0.75
0.6
ERL+0
RAIN WATER
GROUND LVL +0.15
BASEMENT -3.0 Existing road level
+0.00M
HARVESTING TANK
SECTION B-B'
STAINLESS STEEL
CLAMP
KEY PLAN
SECOND FLOOR COVER PLATE TOP BAR 230c/c
CEMENT GROUNTED
JOINT
1
2
1.FLOOR TILE SAND STONE 40MM
CEMENT SAND
3
4
2.CEMENT SCREED (1:2:3) 50MM TOP BAR 230c/c
BITUMEN FILLER 3.BED CONCRETE (1:4:8) 100MM
WATERSTOP 1
2 1.FLOOR TILE
A.C. SHEET 4.RIGID INSULATION 3
160MM
FOUNDATION DRAINAGE PIPE ALUMINIUM SHEET
SUBMITTED TO : AR. BHARAT SHARMA