You are on page 1of 1

KEYPLAN

C
10500 10750

SHUTTER
ROLLING
LOADING / UNLOADING
TOILET

STORE
ROOM

8300
AREA

MAHI RIVER
B
8000
V

1000
FOR PUMPS
CUTOUT

2250
SLOP

600
E

3750
V

COUNTERFORT
5500

3700

SS SCREEN
MANUALLY OPERATED
66kV

COUNTERFORT
5500
SWITCH

SILT PIT CHANNEL 1000W X 1000D


V

GATE
SLUICE
5500
3M WIDE APPROACH

PUMP COMPARTMENT
WALL (BELOW FFL)
CHANNEL - 2NOS.
A A

YARD LVL. - 77.50m.

5500

PLATFORM FOR
MAINTENANCE
GATES

OPERATING /
3M WIDE

LVL. - 77.50m.
SCREENS
PLATFORM FOR
MAINTENANCE
OPERATING /
3M WIDE
DELIVERY PIPE
1000MM DIA.

5500

COUNTERFORT
V

5500

MAINTENANCE
WALKWAY FOR
1M WIDE

SLOP
E
C

B
ROAD
TOWA
RDS T
ODIYA
ROCK
S

TODIYA
ROCKS

RL 10000
94.000

PUMP HOUSE
10000
RL
90.000
MONORAIL
FOR SCREEN
EOT LIFTING
PANEL ROOM

PANEL

FFL
82.000 2300MM DIA .,
HEADER PIPE

1000MM DIA . LADDER


FFL DELIVERY PIPELINE 1M WIDE WALKWAY
79.000 FOR MAINTENANCE 3.0M WIDE 3.0M WIDE
OPERATING/ OPERATING/
RL RL
MAINTENANCE MAINTENANCE GL
77.500 77.500
HFL PLATFORM PLATFORM 77.000 HFL
30000
76.500 76.500

SS SCREEN / GATE FOR EACH


COMPARTMENT MOUNTED ON WELL
COUNTER COUNTER
COMPARTMENT WALL COMPACTED
FORT FORT

16500
SOIL
FRL FRL
67.230 67.230 TRAPEZOIDAL APPROACH CHANNEL
UP TO DEEPEST POINT
WITH STONE PITCHING ON-SITE

SLUICE GATE 3M WIDE APPROACH SS SCREEN

3000
RL RL
2NOS. 62.000 CHANNEL - 2NOS. 62.000
RL
1000

61.200

A
SILT PIT
LEGEND:-
STONE PITCHING /
14850 1000 GABION
BRICK WALL
30000
SECTION A-A RCC WALL

NOTES :-
· ALL DIMESIONS ARE IN MM & LEVEL ARE IN METER.
· EARTHQUAKE ZONE - III
· STEEL Fe = 500D TMT
· LAP LENGTH 40 TIMES Ø OF BAR
· ALL CONCRETE SHALL BE GRADE M:30 WITH MAXIMUM FREE WATER CEMENT RATIO OF 0.45 AND
MAXIMUM CEMENT CONTENT OF 400kg/m ADMIXTURES MAY BE USED TO FULFILL THIS
REQUIREMENT. IS:10262-2009 GUIDELINE SHALL BE FOLLOWED.
· INTERNAL SURFACE PLASTER 15MM THK. CM (1:3) WITH WATERPROOFING MATERIAL
· EXTERNAL SURFACE ABOVE GL 20MM THK. SAND FACED PLASTER WITH WATER PROOF
EXTERIOR EMULSION PAINT
IMPORTANT NOTE:-
THIS A SCHEMATIC DRAWING REPRESENTING AN IDEA OF THE INTAKE STRUCTURE WITHOUT ANY INPUTS
FROM ELECTRO-MECHANICAL PERSPECTIVE. HENCE, IT WILL CHANGE ACCORDINGLY DURING DETAILED GAD
& DESIGN

REV. DATE DESCRIPTION

EXECUTIVE ENGINEER,
CLIENT IRRIGATION PROJECT DIVISION, MODASA
NWRWS & K.D.

CONTRACTOR LCC PROJECTS PVT. LTD.

DESIGN
CONSULTANT HRP INFRA PVT. LTD.
PROJECT EPC WORK FOR CONSTRUCTION OF LIFT IRRIGATION PIPELINE

TITLE SCHEMATIC DRAWING OF SUMP / PUMP HOUSE / APPROACH CHANNEL


PROJECT NO DRAWING NO SHEET NO SCALE
0282 HRP-0282-STR-GAD-001 2 OF 1 AS SHOWN
DRAWN BY :- KDP CHECKED BY :- JJS PROJECTION
REVIEWED BY :- CPM DATE :- 09/04/2024

RELEASED FOR PRELIMINARY TENDER INFORMATION REINFORCEMENT CONSTRUCTION