cat Sum - amount Design 70000

Carpentry 546861 Foundation 350000


Design 68237 Structural Works 1520000
External Works 117700 Carpentry 550000
Floor 391525 MEP 650000
Foundation 348870 Painting 375000
Interior 71095 External Works 300000
MEP 320073 Final Grading 50000
Misellaneous 4500 flooring 350000
Painting 164311 Interior 250000 71000
Structural Works 1502777 4465000
Total Result 3535949
179000
Paint 200000
Floor 1530 38 58140
1500 25 37500
500 38 19000
180 25 4500
220 40 8800
420 20 8400
115 60 6900
143240
80000
63240
Paint 200000
Floor 65000
Interior 200000
Stair 100000
Outside works 150000
MEP labour 66000
Mep Material 50000
Balance Expense 831000
In hand 770000
Balance 61000
cat-1 Cat-1 cat Date
Design 11-Apr-19
Design 12-Apr-19
Design 12-Apr-19
Design 10-May-19
Foundation 11-May-19
Design 23-May-19
Foundation 23-May-19
Design 23-May-19
Foundation 28-May-19
Foundation 28-May-19
Foundation 28-May-19
Foundation 28-May-19
Foundation 29-May-19
Foundation 29-May-19
Foundation 29-May-19
Design 30-May-19
Design 30-May-19
Foundation 30-May-19
Foundation 30-May-19
Foundation 30-May-19
Design 31-May-19
Design 31-May-19
Design 31-May-19
Design 31-May-19
Foundation 31-May-19
Foundation 31-May-19
Foundation 31-May-19
Foundation 31-May-19
Foundation 1-Jun-19
Design 1-Jun-19
Design 1-Jun-19
Foundation 1-Jun-19
Foundation 1-Jun-19
Foundation 1-Jun-19
Foundation 1-Jun-19
Foundation 1-Jun-19
Design 2-Jun-19
Design 3-Jun-19
Foundation 3-Jun-19
Foundation 3-Jun-19
Foundation 3-Jun-19
Design 3-Jun-19
Foundation 4-Jun-19
Foundation 4-Jun-19
Foundation 5-Jun-19
Foundation 5-Jun-19
Foundation 5-Jun-19
Foundation 5-Jun-19
Foundation 5-Jun-19
Foundation 5-Jun-19
Foundation 6-Jun-19
Foundation 7-Jun-19
Foundation 7-Jun-19
Foundation 7-Jun-19
Foundation 8-Jun-19
Design 8-Jun-19
Foundation 11-Jun-19
Foundation 11-Jun-19
Foundation 12-Jun-19
Foundation 12-Jun-19
Foundation 13-Jun-19
Design 19-Jun-19
Foundation 20-Jun-19
Design 20-Jun-19
Foundation 20-Jun-19
Foundation 21-Jun-19
Foundation 22-Jun-19
Foundation 22-Jun-19
Foundation 23-Jun-19
Design 25-Jun-19
Carpentry 28-Jun-19
Structural Works 28-Jun-19
Carpentry 28-Jun-19
Carpentry 28-Jun-19
Carpentry 3-Jul-19
Foundation 7-Jul-19
Structural Works 7-Jul-19
Foundation 15-Jul-19
Foundation 15-Jul-19
Foundation 15-Jul-19
P-M Paint Material Painting 23-Jul-19
PL Painting 23-Jul-19
Foundation 26-Jul-19
Foundation 26-Jul-19
Foundation 26-Jul-19
Foundation 26-Jul-19
Foundation 30-Jul-19
Carpentry 30-Jul-19
Foundation 30-Jul-19
Carpentry 30-Jul-19
Carpentry 30-Jul-19
Carpentry 30-Jul-19
Foundation 30-Jul-19
Carpentry 30-Jul-19
Structural Works 9-Aug-19
Structural Works 9-Aug-19
Structural Works 10-Aug-19
Structural Works 10-Aug-19
Structural Works 10-Aug-19
Structural Works 10-Aug-19
Structural Works 10-Aug-19
Structural Works 13-Aug-19
Structural Works 13-Aug-19
Structural Works 13-Aug-19
Structural Works 13-Aug-19
Structural Works 16-Aug-19
Structural Works 16-Aug-19
Structural Works 16-Aug-19
Structural Works 16-Aug-19
Structural Works 16-Aug-19
Structural Works 16-Aug-19
Structural Works 16-Aug-19
Structural Works 17-Aug-19
Structural Works 29-Aug-19
Structural Works 29-Aug-19
Misellaneous 29-Aug-19
Structural Works 29-Aug-19
Structural Works 2-Sep-19
Structural Works 4-Sep-19
Design 12-Sep-19
Foundation 12-Sep-19
Structural Works 21-Sep-19
Structural Works 23-Sep-19
Structural Works 23-Sep-19
Structural Works 27-Sep-19
Structural Works 27-Sep-19
MEP 27-Sep-19
MEP 27-Sep-19
Structural Works 27-Sep-19
Structural Works 28-Sep-19
Structural Works 28-Sep-19
Structural Works 28-Sep-19
Structural Works 28-Sep-19
Structural Works 28-Sep-19
Structural Works 28-Sep-19
Structural Works 28-Sep-19
Structural Works 28-Sep-19
Structural Works 28-Sep-19
Structural Works 2-Oct-19
Structural Works 2-Oct-19
Structural Works 9-Oct-19
Structural Works 11-Oct-19
Structural Works 11-Oct-19
MEP 12-Oct-19
Carpentry 12-Oct-19
Structural Works 14-Oct-19
Structural Works 14-Oct-19
Structural Works 14-Oct-19
Structural Works 15-Oct-19
Structural Works 15-Oct-19
MEP 19-Oct-19
Structural Works 19-Oct-19
Structural Works 24-Oct-19
Structural Works 24-Oct-19
Structural Works 24-Oct-19
Structural Works 25-Oct-19
Structural Works 25-Oct-19
Structural Works 31-Oct-19
MEP 6-Nov-19
Structural Works 6-Nov-19
Structural Works 6-Nov-19
Structural Works 6-Nov-19
Structural Works 6-Nov-19
Structural Works 7-Nov-19
Structural Works 7-Nov-19
MEP 7-Nov-19
MEP 7-Nov-19
Structural Works 9-Nov-19
Structural Works 10-Nov-19
Structural Works 10-Nov-19
MEP 11-Nov-19
MEP 11-Nov-19
Structural Works 11-Nov-19
Structural Works 11-Nov-19
Structural Works 11-Nov-19
EL MEP 12-Nov-19
Structural Works 13-Nov-19
CL Carpentry 13-Nov-19
Structural Works 13-Nov-19
Structural Works 13-Nov-19
Structural Works 13-Nov-19
Design 15-Nov-19
Structural Works 15-Nov-19
Structural Works 18-Nov-19
Structural Works 18-Nov-19
Structural Works 18-Nov-19
Structural Works 18-Nov-19
Structural Works 18-Nov-19
MEP 21-Nov-19
MEP 22-Nov-19
MEP 22-Nov-19
MEP 22-Nov-19
Structural Works 22-Nov-19
Carpentry 25-Nov-19
Carpentry 25-Nov-19
Structural Works 27-Nov-19
EL MEP 29-Nov-19
Structural Works 30-Nov-19
MEP 3-Dec-19
Structural Works 3-Dec-19
MEP 3-Dec-19
Structural Works 4-Dec-19
Structural Works 5-Dec-19
Carpentry 5-Dec-19
Structural Works 5-Dec-19
MEP 9-Dec-19
Structural Works 9-Dec-19
Structural Works 9-Dec-19
CL Carpentry 10-Dec-19
External Works 10-Dec-19
MEP 10-Dec-19
External Works 12-Dec-19
External Works 16-Dec-19
CL Carpentry 17-Dec-19
Structural Works 19-Dec-19
Structural Works 19-Dec-19
Structural Works 19-Dec-19
EL MEP 21-Dec-19
CL Interior 21-Dec-19
Carpentry 27-Dec-19
P-M Paint Material Painting 28-Dec-19
P-M Paint Material Painting 28-Dec-19
PL Painting 28-Dec-19
CL Carpentry 28-Dec-19
Interior 28-Dec-19
External Works 30-Dec-19
P-M Paint Material Painting 30-Dec-19
Carpentry 30-Dec-19
P-M Paint Material Painting 30-Dec-19
External Works 31-Dec-19
PL Painting 31-Dec-19
PL Painting 31-Dec-19
Carpentry 1-Jan-20
External Works 1-Jan-20
External Works 2-Jan-20
CL Carpentry 2-Jan-20
External Works 2-Jan-20
CL Carpentry 4-Jan-20
CL Interior 4-Jan-20
P-M Paint Material Painting 7-Jan-20
MEP 7-Jan-20
CL Carpentry 8-Jan-20
MEP 10-Jan-20
Carpentry 10-Jan-20
PL Painting 10-Jan-20
EL MEP 11-Jan-20
CL Carpentry 11-Jan-20
PL Painting 13-Jan-20
Floor 13-Jan-20
Floor 14-Jan-20
MEP 14-Jan-20
Floor 14-Jan-20
MEP 15-Jan-20
MEP 15-Jan-20
MEP 15-Jan-20
CL Carpentry 15-Jan-20
Floor 15-Jan-20
MEP 15-Jan-20
Carpentry 15-Jan-20
FL Floor 16-Jan-20
Floor 16-Jan-20
Floor 16-Jan-20
Floor 16-Jan-20
FL Floor 17-Jan-20
External Works 17-Jan-20
Floor 17-Jan-20
Paint Material Painting 17-Jan-20
P-M Paint Material Painting 18-Jan-20
PL Painting 18-Jan-20
FL Floor 18-Jan-20
MEP 18-Jan-20
MEP 18-Jan-20
CL Carpentry 19-Jan-20
FL Floor 19-Jan-20
FL Floor 20-Jan-20
PL Painting 21-Jan-20
FL Floor 21-Jan-20
P-M Paint Material Painting 22-Jan-20
CL Carpentry 22-Jan-20
FL Floor 24-Jan-20
Interior 24-Jan-20
FL Floor 25-Jan-20
Floor 2-Jan-20
FL Floor 27-Jan-20
Paint Material Painting 29-Jan-20
PL Painting 30-Jan-20
EL MEP 31-Jan-20
PL Painting 1-Feb-20
CL Carpentry 1-Feb-20
FL Floor 3-Feb-20
FL Floor 4-Feb-20
Floor 5-Feb-20
Floor 5-Feb-20
Floor 5-Feb-20
FL Floor 5-Feb-20
MEP 5-Feb-20
Paint Material Painting 5-Feb-20
Floor 6-Feb-20
FL Floor 6-Feb-20
MEP 6-Feb-20
MEP 7-Feb-20
MEP 7-Feb-20
MEP 7-Feb-20
Carpentry 7-Feb-20
Floor 7-Feb-20
Painting 7-Feb-20
FL Floor 7-Feb-20
PL Painting 8-Feb-20
FL Floor 8-Feb-20
Paint Material Painting 9-Feb-20
Floor 9-Feb-20
MEP 9-Feb-20
MEP 9-Feb-20
Carpentry 9-Feb-20
MEP 11-Feb-20
FL Floor 11-Feb-20
MEP 11-Feb-20
FL Floor 12-Feb-20
FL Floor 13-Feb-20
FL Floor 13-Feb-20
Floor 13-Feb-20
FL Floor 14-Feb-20
Floor 14-Feb-20
Carpentry 14-Feb-20
Carpentry 14-Feb-20
Carpentry 14-Feb-20
Interior 14-Feb-20
Interior 14-Feb-20
MEP 14-Feb-20
MEP 15-Feb-20
FL Floor 15-Feb-20
Floor 17-Feb-20
MEP 17-Feb-20
Carpentry 18-Feb-20
Floor 18-Feb-20
MEP 19-Feb-20
description qty unit amount
Electrical items for wiring 3212
Electricity application charge 200
Electritian charge 1200
3D elevation 5000
JCB leveling 8500
Site Inspection 1000
Rubble 1.5 Unit 5900
Building permit work charge 9500
kummayam & rope 200
mula 450
steel road 1500
Fees for kutti adi 2000
Hitachi 4100
Rubble 1.5 Unit 4900
Rubble 6 Unit 18000
Church 150
Cement 1 380
Labour for clearing the trunch 800
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Tea 300
bucket& kayar 700
Cake 850
petrol 4200
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Labour charge 6500
Labour for clearing the trunch 800
petrol 4200
electrical connection charge 4500
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Labour charge 7000
Church 100
SAND 1 Unit 1800
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Labour charge 7000
SHEAD 13000
pump set 500
Labour charge-extra 2000
pump set 700
petrol 700
tanker 750
Labour charge-extra 3000
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Labour charge 7500
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Labour charge 6000
Labour charge-extra 800
3D elevation 8500
Hitachi 2600
Soil 6 load 16200
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 5200
Labour charge 6500
ELCTRICAL ITEMS 1100
Labour charge-extra 800
petrol 2000
Labour charge 6500
Labour charge 6000
Rubble 1 Unit 4500
Labour charge 7000
Labour charge 4000
Electrical Wall construction 3900
loading unloading 1800
REBAR 700 kg 37660
carpentrey labour 43500
wood 150000
STEEL 42500
REBAR 20000
Labour(unnikrishnan) 100000
Gravel 1.5 5800
SAND 6900
Cement 29 11310
Paint material for primer 3000
wood painting (labour charge) 6400
Labour 1500
Water 1500
Hitachi 10500
Soil 20 Load 56000
Arbana 160
unloading 750
Labour 1300
Labour 1400
loading 2000
Vehicle Rent 2100
Sand -nice 1.5 unit 5800
Tax 7550
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 300 Nos 800
Brick-vehicle rent 400 Nos 600
Loading & Unloading 2400
Sand -nice 1.5 unit 5800
SAND 1.5 unit 6800
Cement 25 Nos 9196
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Loading & Unloading 1000
Loading & Unloading 1000
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Loading & Unloading 1000
Loading & Unloading 1000
Loading & Unloading 1000
Additional labour 1600
sand 1.5 Unit 7300
Brick-vehicle rent 450 Nos 800
Loading & Unloading 1000
wood cutting 4500
Brick 160000
Brick-vehicle rent 450 Nos 600
Labour(unnikrishnan) 300000
Motor repair 600
Labour charge-extra 800
Gravel 1.5 Unit 5900
Gravel 1.5 Unit 5900
sand 1.5 Unit 6800
cement unloading 50 Nos 500
nail,net 1040
Electrical items for wiring 1235
Cealing show light from amazon 2 nos 2700
Cement 50 nos 18250
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Loading & Unloading 1000
Loading & Unloading 1000
Loading & Unloading 1000
Loading & Unloading 1000
Labour(unnikrishnan) 50000
Cement 4 Nos 1475
sand 1.5 Unit 6800
Nail 5 Kg 300
covering block etc 2415
REBAR 1200 Kg 59285
Electrical items for wiring 3500
Window 3 Shutter (concreate) 2 Nos 8200
sand 3 unit 13600
Labour(unnikrishnan) 25000
Gravel 6 unit 35400
food 3850
Cement 115 Nos 44850
Electrical item 366
sand 1 unit 6800
Brick-vehicle rent 400 Nos 800
Loading & Unloading 1000
Labour(unnikrishnan) 200000
Brick-vehicle rent 400 Nos 800
Loading & Unloading 950
REBAR 275 kg 14360
Electrical items for wiring 2700
Gravel 1 unit 5900
sand 1 unit 6800
Cement 25 Nos 9500
Labour(unnikrishnan) 25000
Brick-vehicle rent 450 Nos 800
Loading & Unloading 1000
Wash Basin & Fittings 1 No 5267
Electrical items for wiring (shine square ) 7047
Labour(unnikrishnan) 50000
Loading & Unloading 200
Brick-vehicle rent 100 Nos 400
nail 70
condute pipe 770
Plastering Sand 1.5 unit 7200
Plastering Sand 3 unit 14400
REBAR 500 kg 27150
Daison 10000
treat 2500
Sarath Labour charge 6000
Gravel 3 unit 11800
sand 2 unit 13600
cement 80 29950
temp. electrical connection 1845
Labour(unnikrishnan) 25000
Baby Metal 1 nos 1250
cement 4 nos 1450
cement 5 nos 1825
cement 25 nos 9125
cement 25 nos 9250
plumping material 45000
Bathroom fitting 5266
Bathroom fitting 9000
Bathroom fitting 9687
cement 25 nos 9700
Loading & unloading ,Vehichle charge 2200
wood 66 cubic 122000
Plastering Sand 3 unit 14400
Daison 10000
cement 25 nos 9450
Electrical item 1100
Brick small 500 nos 6400
Sanitery 8500
Loading & Unloading 1000
Brick-vehicle rent 450 Nos 800
Tarpolin 1 Nos 1300
brick 450 11550
Electrical item 1100
cement 25 nos 9446
cement 25 nos 10000
Sarath Labour charge 5000
Steel 100 kg 6000
bathroom fittings (amazon) 11681
Labour(unnikrishnan) 40000
Labour(unnikrishnan) 4000
Sarath Labour charge 5000
Gravel 1 unit 4300
sand 1.5 unit 6800
Plastering Sand 1.5 unit 7200
Daison 10000
Sarath Labour charge 20000
Wood gum 300
wall primer 1500
Wall primer & brush 2500
wall painting (labour charge) 5000
Sarath Labour charge 15000
Interior charge 20000
well cleaning 1500
wall primer 2651
window fittings 7577
wall primer& PUTTY 7 nos 13600
well cleaning 10000
wall painting (labour charge) 15000
wood painting (labour charge) 30000
window Glass 5500
well cleaning 10000
pump rent 1200
Sarath Labour charge 5000
well cleaning 20000
Sarath Labour charge 5000
Sarath Labour charge 15000
Wall Putty 10 nos 9000
Electrical wire 28700
Sarath Labour charge 10000
pipe items 580
missenalious 600
wall painting (labour charge) 22000
Daison 9000
Sarath Labour charge 10000
wall painting (labour charge) 5000
ourown marbles 64000
Alappatt tiles 136000
Fitting from amazon 12176
Tile Unloading 1850
cable 4025
bathroom drainage cover 1275
additional items 520
Sarath Labour charge 10000
Tile Unloading 3125
cable 1600
fevicol 230
Labour 3000
Tile Unloading 150
Tile material 17500
cement 9375
Labour 4000
Steel Structural 25000
gum 300
Tube light 500
Sandpaper 450
wall painting (labour charge) 13000
Labour 4000
Electrical Items from Rachana 44269
Electrical Items from union electricals 18850
Sarath Labour charge 18000
Labour 2150
Labour 2000
wall painting (labour charge) 3000
Labour 2000
putty 4 nos 3210
Sarath Labour charge 10000
Labour 1000
Hob 13595
Labour 2800
Tile cost 1240
Labour 1600
Wall Putty 2 nos 1800
wall painting (labour charge) 2000
Daison 11000
wall painting (labour charge) 11000
Sarath Labour charge 8000
Labour 3600
Labour 3600
cement 25 nos 8945
Sand 1.5 Unit 6800
Cladding Tile 2600
Labour 3000
Trunch Exavation Labour 800
Wall Putty 1 Nos 900
Granite 240 42300
Labour 3000
Trunch Exavation Labour 800
CHANDLIER 3999
BULB 1240
CCTV 16000
DOOR HANDLE 999
GUM 200
SAND PAPER 200
Labour 3000
wall painting (labour charge) 10000
Labour 4000
Exterior Primer 20 L 2600
cement 15 5290
String Curten 450
Towel Road 1700
Door Loack 1000
electrical Items 4500
labour 4000
electrical Items 3300
labour 6000
labour 6000
labour(Sivan) 16000
floor covering material 4400
labour 5100
gum 1500
tower bolt 12 nos 1980
godrej lock 1 1745
door handle 1 1630
adapter for led 2 1100
led 20 meter 1400
tank water level indicator 1000
Trunch Exavation Labour 2700
labour 1000
labour 2000
Trunch Exavation Labour 1000
Plywood 33000
labour 3100
Hinges and pannel light 5600
1550000

1550000
Design

Foundation

Structural Works

Carpentry

MEP

Painting

External Works

Final Grading

flooring

Interior

Row Labels

Carpentry

Design

External Works

Foundation

Interior

MEP
Misellaneous

Painting

Structural Works

Floor

Grand Total
70000

350000

1520000

550000

650000

375000

300000

50000

350000

250000

4465000

Sum of amount Row Labels Sum of amount

460277 Carpentry 454677

63187 Design 68237

92700 External Works 92700

327670 Foundation 348870

55000 Interior 20000

183269 MEP 144989


4500 Misellaneous 4500

115651 Painting 64651

1342777 Structural Works 1502777

200000 (blank)

2845031 Grand Total 2701401


Foundation31/05/2019

Belt Concr 15/07/2019

Main Door 9/8/2019

Lindel Conc27/09/19

Main Concr14/10/19

first floor ###

first floor 14/11/2019


cat Sum - unit
Carpentry
Design
External Works
Foundation
Interior
MEP
Misellaneous
Painting
Structural Works
(empty)
Floor
Total Result
cat date Date
Foundation 11/6/2019 11-Jun-19
Foundation 11/6/2019 11-Jun-19
Design 1/6/2019 1-Jun-19
Design 1/6/2019 1-Jun-19
Foundation 1/6/2019 1-Jun-19
Foundation 1/6/2019 1-Jun-19
Foundation 1/6/2019 1-Jun-19
Foundation 1/6/2019 1-Jun-19
Foundation 1/6/2019 1-Jun-19
Foundation 1/6/2019 1-Jun-19
Structural Works 2/9/2019 2-Sep-19
Structural Works 2/10/2019 2-Oct-19
Structural Works 2/10/2019 2-Oct-19
Design 3/6/2019 3-Jun-19
Design 3/6/2019 3-Jun-19
Foundation 3/6/2019 3-Jun-19
Foundation 3/6/2019 3-Jun-19
Foundation 3/6/2019 3-Jun-19
Carpentry 3/7/2019 3-Jul-19
MEP 3/12/2019 3-Dec-19
MEP 3/12/2019 3-Dec-19
Structural Works 3/12/2019 3-Dec-19
Foundation 4/6/2019 4-Jun-19
Foundation 4/6/2019 4-Jun-19
Structural Works 4/9/2019 4-Sep-19
Structural Works 4/12/2019 4-Dec-19
Foundation 5/6/2019 5-Jun-19
Foundation 5/6/2019 5-Jun-19
Foundation 5/6/2019 5-Jun-19
Foundation 5/6/2019 5-Jun-19
Foundation 5/6/2019 5-Jun-19
Foundation 5/6/2019 5-Jun-19
Carpentry 5/12/2019 5-Dec-19
Structural Works 5/12/2019 5-Dec-19
Structural Works 5/12/2019 5-Dec-19
Foundation 6/6/2019 6-Jun-19
MEP 6/11/2019 6-Nov-19
Structural Works 6/11/2019 6-Nov-19
Structural Works 6/11/2019 6-Nov-19
Structural Works 6/11/2019 6-Nov-19
Structural Works 6/11/2019 6-Nov-19
Foundation 7/6/2019 7-Jun-19
Foundation 7/6/2019 7-Jun-19
Foundation 7/6/2019 7-Jun-19
Foundation 7/7/2019 7-Jul-19
Structural Works 7/7/2019 7-Jul-19
MEP 7/11/2019 7-Nov-19
MEP 7/11/2019 7-Nov-19
Structural Works 7/11/2019 7-Nov-19
Structural Works 7/11/2019 7-Nov-19
Foundation 8/6/2019 8-Jun-19
Design 8/7/2019 8-Jun-19
Structural Works 9/8/2019 9-Aug-19
Structural Works 9/8/2019 9-Aug-19
Structural Works 9/10/2019 9-Oct-19
Structural Works 9/11/2019 9-Nov-19
MEP 9/12/2019 9-Dec-19
Structural Works 9/12/2019 9-Dec-19
Structural Works 9/12/2019 9-Dec-19
Design 10/5/2019 10-May-19
Structural Works 10/8/2019 10-Aug-19
Structural Works 10/8/2019 10-Aug-19
Structural Works 10/8/2019 10-Aug-19
Structural Works 10/8/2019 10-Aug-19
Structural Works 10/8/2019 10-Aug-19
Structural Works 10/11/2019 10-Nov-19
Structural Works 10/11/2019 10-Nov-19
Carpentry 10/12/2019 10-Dec-19
External Works 10/12/2019 10-Dec-19
MEP 10/12/2019 10-Dec-19
Design 11/4/2019 11-Apr-19
Foundation 11/5/2019 11-May-19
Structural Works 11/10/2019 11-Oct-19
Structural Works 11/10/2019 11-Oct-19
MEP 11/11/2019 11-Nov-19
MEP 11/11/2019 11-Nov-19
Structural Works 11/11/2019 11-Nov-19
Structural Works 11/11/2019 11-Nov-19
Structural Works 11/11/2019 11-Nov-19
Design 12/4/2019 12-Apr-19
Design 12/4/2019 12-Apr-19
Foundation 12/6/2019 12-Jun-19
Foundation 12/6/2019 12-Jun-19
Design 12/9/2019 12-Sep-19
Foundation 12/9/2019 12-Sep-19
Carpentry 12/10/2019 12-Oct-19
MEP 12/10/2019 12-Oct-19
MEP 12/11/2019 12-Nov-19
External Works 12/12/2019 12-Dec-19
Carpentry 1/1/2020 1-Jan-20
External Works 1/1/2020 1-Jan-20
Carpentry 2/1/2020 2-Jan-20
External Works 2/1/2020 2-Jan-20
External Works 2/1/2020 2-Jan-20
Carpentry 4/1/2020 4-Jan-20
Interior 4/1/2020 4-Jan-20
MEP 7/1/2020 7-Jan-20
Painting 7/1/2020 7-Jan-20
Carpentry 8/1/2020 8-Jan-20
Carpentry 10/1/2020 10-Jan-20
MEP 10/1/2020 10-Jan-20
Painting 10/1/2020 10-Jan-20
MEP 11/1/2020 11-Jan-20
Carpentry 11/1/2020 11-Jan-20
Painting 13/1/2020 13-Jan-20
Floor 13/1/2020 13-Jan-20
Floor 14/1/2020 14-Jan-20
Structural Works 13/11/2019 13-Nov-19
Structural Works 13/11/2019 13-Nov-19
Structural Works 13/11/2019 13-Nov-19
Structural Works 13/11/2019 13-Nov-19
Carpentry 13/12/2019 13-Nov-19
Foundation 13/6/19 13-Jun-19
Structural Works 13/8/19 13-Aug-19
Structural Works 13/8/19 13-Aug-19
Structural Works 13/8/19 13-Aug-19
Structural Works 13/8/19 13-Aug-19
Structural Works 14/10/2019 14-Oct-19
Structural Works 14/10/2019 14-Oct-19
Structural Works 14/10/2019 14-Oct-19
Structural Works 15/10/2019 15-Oct-19
Structural Works 15/10/2019 15-Oct-19
Design 15/11/2019 15-Nov-19
Structural Works 15/11/2019 15-Nov-19
Foundation 15/7/19 15-Jul-19
Foundation 15/7/19 15-Jul-19
Foundation 15/7/19 15-Jul-19
External Works 16/12/2019 16-Dec-19
Structural Works 16/8/19 16-Aug-19
Structural Works 16/8/19 16-Aug-19
Structural Works 16/8/19 16-Aug-19
Structural Works 16/8/19 16-Aug-19
Structural Works 16/8/19 16-Aug-19
Structural Works 16/8/19 16-Aug-19
Structural Works 16/8/19 16-Aug-19
Carpentry 17/12/2019 17-Dec-19
Structural Works 17/8/19 17-Aug-19
Structural Works 18/11/2019 18-Nov-19
Structural Works 18/11/2019 18-Nov-19
Structural Works 18/12/2019 18-Nov-19
Structural Works 18/12/2019 18-Nov-19
Structural Works 18/12/2019 18-Nov-19
Structural Works 19/10/2019 19-Oct-19
MEP 19/11/2019 19-Oct-19
Structural Works 19/12/2019 19-Dec-19
Structural Works 19/12/2019 19-Dec-19
Structural Works 19/12/2019 19-Dec-19
Design 19/6/19 19-Jun-19
Design 2/6/219 2-Jun-19
Design 20/6/19 20-Jun-19
Foundation 20/6/19 20-Jun-19
Foundation 20/6/19 20-Jun-19
MEP 21/11/2019 21-Nov-19
Interior 21/12/2019 21-Dec-19
MEP 21/12/2019 21-Dec-19
Foundation 21/6/19 21-Jun-19
Structural Works 21/9/19 21-Sep-19
MEP 22/11/2019 22-Nov-19
MEP 22/11/2019 22-Nov-19
MEP 22/11/2019 22-Nov-19
Structural Works 22/11/2019 22-Nov-19
Foundation 22/6/19 22-Jun-19
Foundation 22/6/19 22-Jun-19
Design 23/5/19 23-May-19
Design 23/5/19 23-May-19
Foundation 23/5/19 23-May-19
Foundation 23/6/19 23-Jun-19
Painting 23/7/19 23-Jul-19
Painting 23/7/19 23-Jul-19
Structural Works 23/9/19 23-Sep-19
Structural Works 23/9/19 23-Sep-19
Structural Works 24/10/2019 24-Oct-19
Structural Works 24/10/2019 24-Oct-19
Structural Works 24/10/2019 24-Oct-19
Structural Works 25/10/2019 25-Oct-19
Structural Works 25/10/2019 25-Oct-19
Carpentry 25/11/2019 25-Nov-19
Carpentry 25/11/2019 25-Nov-19
Design 25/6/19 25-Jun-19
Foundation 26/7/19 26-Jul-19
Foundation 26/7/19 26-Jul-19
Foundation 26/7/19 26-Jul-19
Foundation 26/7/19 26-Jul-19
Plaster Structural Works 27/11/2019 27-Nov-19
Carpentry 27/12/2019 27-Dec-19
Plaster MEP 27/9/19 27-Sep-19
MEP 27/9/19 27-Sep-19
Structural Works 27/9/19 27-Sep-19
Structural Works 27/9/19 27-Sep-19
Plaster Structural Works 27/9/19 27-Sep-19
Carpentry 28/12/2019 28-Dec-19
Interior 28/12/2019 28-Dec-19
Painting 28/12/2019 28-Dec-19
Painting 28/12/2019 28-Dec-19
Painting 28/12/2019 28-Dec-19
Plaster Foundation 28/5/19 28-May-19
Foundation 28/5/19 28-May-19
Plaster Foundation 28/5/19 28-May-19
Foundation 28/5/19 28-May-19
Carpentry 28/6/19 28-Jun-19
Carpentry 28/6/19 28-Jun-19
Carpentry 28/6/19 28-Jun-19
Structural Works 28/8/19 28-Jun-19
Structural Works 28/9/19 28-Sep-19
Structural Works 28/9/19 28-Sep-19
Plaster Structural Works 28/9/19 28-Sep-19
Structural Works 28/9/19 28-Sep-19
Structural Works 28/9/19 28-Sep-19
Structural Works 28/9/19 28-Sep-19
Structural Works 28/9/19 28-Sep-19
Structural Works 28/9/19 28-Sep-19
Structural Works 28/9/19 28-Sep-19
MEP 29/11/2019 29-Nov-19
Foundation 29/5/19 29-May-19
Foundation 29/5/19 29-May-19
Plaster Foundation 29/5/19 29-May-19
Plaster Misellaneous 29/8/19 29-Aug-19
Structural Works 29/8/19 29-Aug-19
Plaster Structural Works 29/8/19 29-Aug-19
Structural Works 30/11/2019 30-Nov-19
Carpentry 30/12/2019 30-Dec-19
External Works 30/12/2019 30-Dec-19
Painting 30/12/2019 30-Dec-19
Plaster Painting 30/12/2019 30-Dec-19
Design 30/5/19 30-May-19
Design 30/5/19 30-May-19
Foundation 30/5/19 30-May-19
Foundation 30/5/19 30-May-19
Foundation 30/5/19 30-May-19
Carpentry 30/7/19 30-Jul-19
Carpentry 30/7/19 30-Jul-19
Carpentry 30/7/19 30-Jul-19
Carpentry 30/7/19 30-Jul-19
Carpentry 30/7/19 30-Jul-19
Foundation 30/7/19 30-Jul-19
Foundation 30/7/19 30-Jul-19
Foundation 30/7/19 30-Jul-19
Structural Works 31/10/2019 31-Oct-19
External Works 31/12/2019 31-Dec-19
Painting 31/12/2019 31-Dec-19
Painting 31/12/2019 31-Dec-19
Design 31/5/19 31-May-19
Design 31/5/19 31-May-19
Design 31/5/19 31-May-19
Foundation 31/5/19 31-May-19
Foundation 31/5/19 31-May-19
Foundation 31/5/19 31-May-19
Foundation 31/5/19 31-May-19
Design 31-May-19
Structural Works 29-Aug-19
description qty unit amount
Hitachi 2600
Soil 6 load 16200
petrol 4200
electrical connection charge 4500
Labour for clearing the trunch 800
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Labour charge 7000
Brick-vehicle rent 450 Nos 600
Cement 4 Nos 1475
sand 1.5 Unit 6800
SAND 1 Unit 1800
SHEAD 13000
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Labour charge 7000
STEEL 42500
Electrical item 1100
Sanitery 8500
Brick small 500 nos 6400
pump set 500
Labour charge-extra 2000
Labour(unnikrishnan) 300000
Loading & Unloading 1000
pump set 700
petrol 700
tanker 750
Labour charge-extra 3000
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Tarpolin 1 Nos 1300
Brick-vehicle rent 450 Nos 800
brick 450 11550
Labour charge 7500
Electrical items for wiring 2700
Gravel 1 unit 5900
sand 1 unit 6800
Cement 25 Nos 9500
Labour(unnikrishnan) 25000
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Labour charge 6000
REBAR 20000
Labour(unnikrishnan) 100000
Wash Basin & Fittings 1 No 5267
Electrical items for wiring (shine square ) 7047
Brick-vehicle rent 450 Nos 800
Loading & Unloading 1000
Labour charge-extra 800
3D elevation 8500
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 300 Nos 800
Nail 5 Kg 300
Labour(unnikrishnan) 50000
Electrical item 1100
cement 25 nos 9446
cement 25 nos 10000
3D elevation 5000
Brick-vehicle rent 400 Nos 600
Loading & Unloading 2400
Sand -nice 1.5 unit 5800
SAND 1.5 unit 6800
Cement 25 Nos 9196
Loading & Unloading 200
Brick-vehicle rent 100 Nos 400
Sarath Labour charge 5000
Steel 100 kg 6000
bathroom fittings (amazon) 11681
Electrical items for wiring 3212
JCB leveling 8500
covering block etc 2415
REBAR 1200 Kg 59285
nail 70
condute pipe 770
Plastering Sand 1.5 unit 7200
Plastering Sand 3 unit 14400
REBAR 500 kg 27150
Electricity application charge 200
Electritian charge 1200
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 5200
Motor repair 600
Labour charge-extra 800
Window 3 Shutter (concreate) 2 Nos 8200
Electrical items for wiring 3500
Denson 10000
Labour(unnikrishnan) 40000
window Glass 5500
well cleaning 10000
Sarath Labour charge 5000
pump rent 1200
well cleaning 20000
Sarath Labour charge 5000
Sarath Labour charge 15000
Electrical wire 28700
Wall Putty 9000
Sarath Labour charge 10000
missenalious 600
pipe items 580
wall painting (labour charge) 22000
Denson 9000
Sarath Labour charge 10000
wall painting (labour charge) 5000
ourown marbles 64000
Alappatt tiles 136000
treat 2500
Gravel 3 unit 11800
sand 2 unit 13600
cement 80 29950
Sarath Labour charge 6000
Labour charge 6500
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Loading & Unloading 1000
Loading & Unloading 1000
sand 3 unit 13600
Labour(unnikrishnan) 25000
Gravel 6 unit 35400
food 3850
Cement 115 Nos 44850
temp. electrical connection 1845
Labour(unnikrishnan) 25000
Gravel 1.5 5800
SAND 6900
Cement 29 11310
Labour(unnikrishnan) 4000
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Loading & Unloading 1000
Loading & Unloading 1000
Loading & Unloading 1000
Additional labour 1600
Sarath Labour charge 5000
sand 1.5 Unit 7300
cement 5 nos 1825
cement 25 nos 9125
Baby Metal 1 nos 1250
cement 4 nos 1450
cement 25 nos 9250
sand 1 unit 6800
Electrical item 366
Gravel 1 unit 4300
sand 1.5 unit 6800
Plastering Sand 1.5 unit 7200
ELCTRICAL ITEMS 1100
Church 100
petrol 2000
Labour charge-extra 800
Labour charge 6500
plumping material 45000
Sarath Labour charge 20000
Denson 10000
Labour charge 6000
Gravel 1.5 Unit 5900
Bathroom fitting 5266
Bathroom fitting 9000
Bathroom fitting 9687
cement 25 nos 9700
Rubble 1 Unit 4500
Labour charge 7000
Site Inspection 1000
Building permit work charge 9500
Rubble 1.5 Unit 5900
Labour charge 4000
Paint material for primer 3000
Labour charge for paint wood frames 6400
Gravel 1.5 Unit 5900
sand 1.5 Unit 6800
Brick-vehicle rent 400 Nos 800
Loading & Unloading 1000
Labour(unnikrishnan) 200000
Brick-vehicle rent 400 Nos 800
Loading & Unloading 950
Loading & unloading ,Vehichle charge 2200
wood 66 cubic 122000
Electrical Wall construction 3900
Labour 1500
Water 1500
Hitachi 10500
Soil 20 Load 56000
Plastering Sand 3 unit 14400
Wood gum 300
Electrical items for wiring 1235
Cealing show light from amazon 2 nos 2700
cement unloading 50 Nos 500
nail,net 1040
Cement 50 nos 18250
Sarath Labour charge 15000
Interior charge 20000
wall primer 1500
Wall primer & brush 2500
wall painting (labour charge) 5000
kummayam & rope 200
mula 450
steel road 1500
Fees for kutti adi 2000
loading unloading 1800
carpentrey labour 43500
wood 150000
REBAR 700 kg 37660
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Brick-vehicle rent 400 Nos 800
Loading & Unloading 1000
Loading & Unloading 1000
Loading & Unloading 1000
Loading & Unloading 1000
Labour(unnikrishnan) 50000
Denson 10000
Hitachi 4100
Rubble 1.5 Unit 4900
Rubble 6 Unit 18000
wood cutting 4500
Brick-vehicle rent 450 Nos 800
Loading & Unloading 1000
cement 25 nos 9450
window fittings 7577
well cleaning 1500
wall primer 2651
wall primer 13600
Church 150
Cement 1 380
Labour for clearing the trunch 800
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
unloading 750
Labour 1400
loading 2000
Vehicle Rent 2100
Tax 7550
Arbana 160
Labour 1300
Sand -nice 1.5 unit 5800
REBAR 275 kg 14360
well cleaning 10000
wall painting (labour charge) 15000
wood painting (labour charge) 30000
Tea 300
bucket& kayar 700
Cake 850
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Rubble 1.5 Unit 4900
Labour charge 6500
petrol 4200
Brick 160000
10/12/2019 5000
13/12/2019 6000
17/12/2019 5000
21/12/2023 20000
28/12/2018 15000
ground Brick work from lindel to roof 10000 10
ground concrete 150000 100
first floor brick work 100000 32
first floor concrete 110000 70
total plastering 130000 172
labour cost 250000
750000
carpentry 99200
carpentry 55000
floor 312000
paint 400000
electrical 120000
electrical 400000
2136200
1350000
3486200
(empty)

Data
kummayam & rope 200
pump set 1200 59166.667 4833.333
SHEAD 13000
Electrical Wall construction 3900
wood 66 272000
carpentrey labour 43500
loading unloading 1800
STEEL 100 48500
REBAR 2675 158455
Labour 4200
Brick 450 171550
Gravel 15.5 75000
Paint material for primer 3000
Labour charge for paint wood frames 6400
Water 1500
Arbana 160
loading 2000
unloading 750
Vehicle Rent 2100
Tax 7550
Sand -nice 3 11600
Loading & Unloading 16550
Brick-vehicle rent 7400 14400
Additional labour 1600
Labour(unnikrishnan) 819000
cement unloading 50 500
nail,net 1040
wood cutting 4500
Cealing show light from 2 2700
Nail 5 370
covering block etc 2415
Window 3 Shutter (concr 2 8200
food 3850
Electrical items for wiring (shine square ) 7047
Plastering Sand 9 43200
Wash Basin & Fittings 1 5267
Denson 39000
cement 239 90196
treat 2500
temp. electrical connection 1845
condute pipe 770
plumping material 45000
Bathroom fitting 23953
Loading & unloading ,Vehichle charge 2200
Electrical item 2566
Sanitery 8500
Brick small 500 6400
Tarpolin 1 1300
bathroom fittings (amazon) 11681
Sarath Labour charge 96000
Baby Metal 1 1250
Alappatt tiles 136000
Electrical wire 28700
Interior charge 20000
missenalious 600
ourown marbles 64000
pipe items 580
pump rent 1200
wall painting (labour charge) 47000
wall primer 17751
Wall primer & brush 2500
Wall Putty 9000
well cleaning 41500
window fittings 7577
window Glass 5500
Wood gum 300
wood painting (labour charge) 30000
Total Result 11845.5 3031281
Design 70000 0.8
Foundation 350000 0.8
Structural Works 1520000
Carpentry 500000
MEP 65000
Painting 350000
External Works 150000
Final Grading 50000
flooring 350000 1.6
3645000

0.6

24
3
4.5
Foundation Stone 31/05/2019
Belt Concreate 15/07/2019
Main Door Frame 9/8/2019
Lindel Concreate 27/09/19
Main Concreate 14/10/19
first floorLindel Concreate 6/11/2019
first floor concreate 14/11/2019

25200000
160000 6150 950 195000
Advance 12X8X6 12X6X6
14/7/019 6000
7/8/2019 24000 400
250 200
10/8/2019 400
13/8/19 30000 400
13/8/19 400
16/8/19 40000 400
16/8/19 400
16/8/19 400
29/8/19 250 200
6/9/2019 30000 300 150
28/9/2019 30000 400
28/9/2019 400
28/9/2019 400
28/9/2019 400
24/10/2019 400
25/10/2019 300 100
7/11/2019 250 200
10/11/2019 100