Professional Documents
Culture Documents
1550000
Design
Foundation
Structural Works
Carpentry
MEP
Painting
External Works
Final Grading
flooring
Interior
Row Labels
Carpentry
Design
External Works
Foundation
Interior
MEP
Misellaneous
Painting
Structural Works
Floor
Grand Total
70000
350000
1520000
550000
650000
375000
300000
50000
350000
250000
4465000
200000 (blank)
Lindel Conc27/09/19
Main Concr14/10/19
Data
kummayam & rope 200
pump set 1200 59166.667 4833.333
SHEAD 13000
Electrical Wall construction 3900
wood 66 272000
carpentrey labour 43500
loading unloading 1800
STEEL 100 48500
REBAR 2675 158455
Labour 4200
Brick 450 171550
Gravel 15.5 75000
Paint material for primer 3000
Labour charge for paint wood frames 6400
Water 1500
Arbana 160
loading 2000
unloading 750
Vehicle Rent 2100
Tax 7550
Sand -nice 3 11600
Loading & Unloading 16550
Brick-vehicle rent 7400 14400
Additional labour 1600
Labour(unnikrishnan) 819000
cement unloading 50 500
nail,net 1040
wood cutting 4500
Cealing show light from 2 2700
Nail 5 370
covering block etc 2415
Window 3 Shutter (concr 2 8200
food 3850
Electrical items for wiring (shine square ) 7047
Plastering Sand 9 43200
Wash Basin & Fittings 1 5267
Denson 39000
cement 239 90196
treat 2500
temp. electrical connection 1845
condute pipe 770
plumping material 45000
Bathroom fitting 23953
Loading & unloading ,Vehichle charge 2200
Electrical item 2566
Sanitery 8500
Brick small 500 6400
Tarpolin 1 1300
bathroom fittings (amazon) 11681
Sarath Labour charge 96000
Baby Metal 1 1250
Alappatt tiles 136000
Electrical wire 28700
Interior charge 20000
missenalious 600
ourown marbles 64000
pipe items 580
pump rent 1200
wall painting (labour charge) 47000
wall primer 17751
Wall primer & brush 2500
Wall Putty 9000
well cleaning 41500
window fittings 7577
window Glass 5500
Wood gum 300
wood painting (labour charge) 30000
Total Result 11845.5 3031281
Design 70000 0.8
Foundation 350000 0.8
Structural Works 1520000
Carpentry 500000
MEP 65000
Painting 350000
External Works 150000
Final Grading 50000
flooring 350000 1.6
3645000
0.6
24
3
4.5
Foundation Stone 31/05/2019
Belt Concreate 15/07/2019
Main Door Frame 9/8/2019
Lindel Concreate 27/09/19
Main Concreate 14/10/19
first floorLindel Concreate 6/11/2019
first floor concreate 14/11/2019
25200000
160000 6150 950 195000
Advance 12X8X6 12X6X6
14/7/019 6000
7/8/2019 24000 400
250 200
10/8/2019 400
13/8/19 30000 400
13/8/19 400
16/8/19 40000 400
16/8/19 400
16/8/19 400
29/8/19 250 200
6/9/2019 30000 300 150
28/9/2019 30000 400
28/9/2019 400
28/9/2019 400
28/9/2019 400
24/10/2019 400
25/10/2019 300 100
7/11/2019 250 200
10/11/2019 100