[W7-T2] Action Plan to Realize Selected Concept Proposal

Class number: EE241S7B Team number: 4 Team Name: Legacy


This form is used to make a plan to realize the concept selected with experiments or
simulations and timelines of action.

SP Project Theme Statement


(Target + specific point Animals + The level of wildness of the animal + Technology
problem + original in Halal Animals Slaughter
problem)

 Desired conditions:
Indicators: Measuring method: Current values: Desired condition:
Experiment 1:
Power 2.2KW = 2.95hp More than 3.0hp
Ritual killing box –
halal/kosher
(Motor)
Experiment 1:
Weight of the 3000-5000 KG Less than 7000KG
animal Electronic
measuring system
Experiment 1:
Image sensor 10 - 35°c the surrounding
Measure temperature is not
temperature by too hot which
capturing image exceed more than
from heat transfer 35°c
Experiment 1: To calm the
Injection aggressive animals
Tranquilizer To with just the right
produce calmness, amount of dosage
loss of aggression 39.6 – 60.5 ml and won’t harm it.
and loss of
alertness which is
generally required
during slaughtering
Experiment 1; Rotation angle: Capacity of 60
Animal holder Rotating animal 270 degree head/hour
head for easier and
more accurate Weight:
slaughter process 2600kg

 Preconditions:
① Indicators ② Units of Indicators ③ Precondition ④ If precondition is NOT met, explain
(evaluation items (Conditions to satisfy): met? (Yes / No) with reasons.
that can be not less than / below /
quantified) range

Animal's Yes
throat must
1 -
be cut by a
sharp knife

cost Less than RM Yes -


50K

Less than 2000 No Because the initial prposed used


Weight
kg type of metal that is heavy

Use visual materials to show your verification process of the selected concept proposal,
including some explanations.
Description of process: Visual materials of the verification process:

Due to feedback from the skate Initial proposal: weight (3000 kg)
holders on the high preliminary
weight and strength, it is
proposed to replace the type of
chamber with a less heavy but
strong.

Source: http://hatziioakimidis.gr/product/fab02-
halal-killing-box-of-cattle/
Revised proposal: weight (1148 kg)

Source: https://vdzt.com/products/1945/ritual-
killing-box-halalkosher/

Schedule overview: Please show the tentative activity schedule of 4 months below.

  MONTH MONTH 1 MONTH 2 MONTH 3 MONTH 4


  WEEK 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

N                                
O ACTIVITY
Production of
1
prototype                                
Testing of
2
prototype                                
Gathering the
3
feedback of users                                
Improvement of
4 prototype based                                
on feedback
Preparation of
5
the business plan                                
Pitching the
6 business plan to                                
investors