Professional Documents
Culture Documents
1 2 3 4 5 6 7 8
A A
Determine:
1. RPM of the Driven Machine
2. RPM of Pulleys A & B and Sprockets A & B
3. Belt speed in FPM
B
4. Pitch diameters of pulley A & B B
Given:
Pmotor = 30HP
C
Nmotor = 1200 RPM C
DDriver = 6”
CFlat Belt = 24”
VR (for each drive) = 3
D
ƒ = 0.35 D
E E
SHEET 1 OF 4 PLATE 1
1 2 3 4 5 6 7 8
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
1 2 3 4 5 6 7 8
A A
A (1:5) B (1:8)
16 in
B B
2 in
14 i
28.9035 in
1 n
C C
A
1
2 in
Ø18 in
B C (1:5)
2 in
D D
24 in
4 in
4 in
Ø6 in
E C E
38.1 [1.5in]
203.2 [8in]
SHEET 2 OF 4 PLATE 1
1 2 3 4 5 6 7 8
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
1 2 3 4 5 6 7 8
A A
SOLUTIONS
Given:
Pmotor = 30HP
B B
Nmotor = 1200 RPM
DDriver = 6”
CFlat Belt = 24”
3=1200/N2=D2/6"
N1=1200 RPM and N2=400 RPM
D1=6" and D2=18"
V=π(6")(1200)
12 =1884.955592 fpm
SHEET 3 OF 4 PLATE 1
1 2 3 4 5 6 7 8
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
1 2 3 4 5 6 7 8
A A
Solution: Center-to-Center Distance
Design HP = P × SERVICE FACTOR Cave = D4 +D3/2 = 23.884" +7.991"
2
Where Cave = 27.87944"
S.F. is 1.4 for heavy shock, 10 hrs 2 2p
K = (T4 +T3)/2 +2C
p + ((T4 -T3)/2π) × C
operation
K = (60+20)
2 + 2(27.879)" (60-20) 2 2(1.25")
1.25" + ( 2π ) (27.879")
B DESIGN HP = 30 × 1.4 K = 86.42423 ≈ 88 LINKS B
DESIGN HP = 42 HP
Length of Chain (L) =Kp=88(1.25")
D4= 1 41 "×csc(180
60 ) = 23.884"
E E
SHEET 4 OF 4 PLATE 1
1 2 3 4 5 6 7 8
PRODUCED BY AN AUTODESK STUDENT VERSION