You are on page 1of 6

IEC SYSTEM FOR CONFORMITY TESTING COMMITTEE OF TESTING LABORATORIES

AND CERTIFICATION OF ELECTRICAL


EQUIPMENT

TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING

Terrestrial photovoltaic (PV) modules – Design qualification and type approval – Part 2: Test procedures
IEC 61215-2:2016

R = Required by Lab
S = May be subcontracted

Clause Testing Testing / measuring equipment / material needed Subcontracting


- Lamp: Illumination >1000lux
4.1 Visual inspection (MQT 01) - Camera R
- Vernier calliper, measuring tape
- Radiant source (natural sunlight or a solar simulator class BBA or
better in accordance with IEC 60904-9)
- PV reference device in accordance with IEC 60904-2
- Means to measure spectral responsivity of the module according
to IEC 60904-8
4.2 Maximum power determination (MQT 02) - Means to measure spectral distribution of the radiant source R
- Suitable mount for supporting module and the reference device
- Means to measure temperature with an accuracy of +/-1°C and
repeatability of +/-0.5°C
- Apparatus for measuring an I-V curve in accordance with IEC
60904-1
- DC voltage source, with current limitation, capable of applying 1
4.3 Insulation test (MQT 03) 000 V plus twice the sample’s maximum system voltage R
- Insulation resistance meter
- Radiant source (natural sunlight or a solar simulator class BBB or
better in accordance with IEC 60904-9)
- PV reference device in accordance with IEC 60904-2
- Means to measure temperature with an accuracy of +/-1°C and
4.4 Measurement of temperature coefficients (MQT04) repeatability of +/-0.5°C R
- Apparatus for measuring an I-V curve in accordance with IEC
60904-1
- Apparatus includes equipment to change the temperature of the
module

2017-01-20 1/6 PV/61215-2


IEC SYSTEM FOR CONFORMITY TESTING COMMITTEE OF TESTING LABORATORIES
AND CERTIFICATION OF ELECTRICAL
EQUIPMENT

TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING

Terrestrial photovoltaic (PV) modules – Design qualification and type approval – Part 2: Test procedures
IEC 61215-2:2016

Clause Testing Testing / measuring equipment / material needed Subcontracting


- Test fixture as described in clause 8.4 of IEC61853-2
- Pyranometer or PV reference device with an accuracy of+/- 5%
- Wind speed sensor: Measurement range from 0,25m/s to 10m/s
- Ambient temperature sensor
Measurement of nominal module operating
4.5 - Data acquisition system: Temperature measurement accuracy of R
temperature (NMOT) (MQT 05)
+/- 1°C and repeatability of +/-0.5°C, data recording interval < 5 s
- Resistive load sized such that a module will operate near its max-
imum power point at STC or electronic maximum power point
tracker (MPPT)
For Performance at STC (MQT 06.1)
- All equipment for 4.2
- Means to measure temperature with an accuracy of+/-1°C and re- R
peatability of +/-0.5°C
- Equipment to cool/heat a module to STC
4.6 Performance at STC and NMOT (MQT 06) For Performance at NMOT (MQT 06.2)
- All equipment for 4.2
- Means for changing irradiance to 800 ± 80 W/m²
R
- Means to measure temperature with an accuracy of +/-1°C and
repeat-ability of +/-0.5°C
- Equipment to cool/heat a module to NMOT
- All equipment for 4.2
- Means for changing irradiance to 200 ± 20 W/m² in accordance
with IEC60904-10
4.7 Performance at low irradiance (MQT 07) R
- Means to measure temperature with an accuracy of +/-1°C and
repeatability of +/-0.5°C
- Equipment to cool/heat a module to STC
- Means to mount the module
- Solar irradiance monitor with an accuracy of +/- 5%
4.8 Outdoor exposure test (MQT 08) - Resistive load sized such that a module will operate near its max- R
imum power point at STC or electronic maximum power point
tracker (MPPT)

2017-01-20 2/6 PV/61215-2


IEC SYSTEM FOR CONFORMITY TESTING COMMITTEE OF TESTING LABORATORIES
AND CERTIFICATION OF ELECTRICAL
EQUIPMENT

TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING

Terrestrial photovoltaic (PV) modules – Design qualification and type approval – Part 2: Test procedures
IEC 61215-2:2016

Clause Testing Testing / measuring equipment / material needed Subcontracting


- Radiant source (natural sunlight or a steady-state solar simulator
class BBB or better in accordance with IEC 60904-9 (irradiance
1000 +/- 100 W/m²))
- Radiant source in determining the worst case shadowing condi-
tion for monolithically integrated (MLI) thin film technologies. (ex.
pulsed or non-continuous solar simulator class BBB or better in
accordance with IEC 60904-9 (irradiance 800-1000W/m2))
4.9 Hot-spot endurance test (MQT 09) R
- Module I-V curve tracer
- Equipment for current measurement
- Equipment to record irradiance levels, integrated irradiance and
ambient temperature
- Opaque covers:
- Temperature detector
- Means to cool the module to temperature 50°C during the test
- UV meters working in wavelength ranges 280–320 nm and 320–
400 nm with an accuracy of +/- 15%
- UV light source with irradiance non-uniformity in the test plane +/-
15% , no appreciable irradiance at wavelengths below 280 nm
4.10 UV preconditioning (MQT 10) and total UV irradiance < 250 W/m² R
- Equipment to control the module temperature in the range 60 +/-
5°C
- Temperature monitoring equipment with an accuracy of +/- 2°C
and repeatability of +/-0.5°C
- Climatic chamber capable to produce a temperature cycle in ac-
cordance to figure 9 with an accuracy of +/- 2°C at the low and
high extremes.
4.11 Thermal cycling test (MQT 11) - Means for measuring and recording the module temperature to an R
accuracy of +/- 2°C and repeatability of +/-0.5°C.
- Means for applying current to the modules
- Means for monitoring current through the modules

2017-01-20 3/6 PV/61215-2


IEC SYSTEM FOR CONFORMITY TESTING COMMITTEE OF TESTING LABORATORIES
AND CERTIFICATION OF ELECTRICAL
EQUIPMENT

TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING

Terrestrial photovoltaic (PV) modules – Design qualification and type approval – Part 2: Test procedures
IEC 61215-2:2016

Clause Testing Testing / measuring equipment / material needed Subcontracting


- Climatic chambers capable to produce a temperature/humidity
cycle according to figure 10 with accuracy of +/- 2°C and +/- 5%
relative humidity at the low and high extremes.
- Means for measuring and recording the module temperature to an
4.12 Humidity-freeze test (MQT 12) accuracy of +/- 2°C and repeatability of +/- 0.5°C. R
- Means for monitoring the continuity of the internal circuit of the
module
- Means for applying current to the modules
- Means for monitoring current through the modules
- Climatic chamber capable to carry out the test in accordance with
4.13 Damp-Heat test (MQT 13) R
IEC 60068-2-78
Retention of Junction Box on Mounting Surface
4.14.2 - Means for applying a force of 40 N to the centre of the test object R
(MQT 14.1)
- Cord anchorage pull test equipment
4.14.3 Test of cord anchorage (MQT 14.2) - Torque test equipment S
- Vernier calliper
- Shallow trough or tank
- Spray equipment
- Electrical conductivity meter
- Means to measure temperature
4.15 Wet leakage current test (MQT 15) R
- Insulation resistance meter
- DC voltage source, with current limitation, capable of applying a
test voltage 500 V or maximum rated system voltage of the mod-
ule
- Rigid test base which enables the modules to be mounted front
side up or front side down
- Test apparatus, capable of applying a uniform load corresponding
4.16 Static mechanical load test (MQT 16) R
to at least 2400 Pa on the module surfaces
- Means for monitoring the continuity of the internal circuit of the
module

2017-01-20 4/6 PV/61215-2


IEC SYSTEM FOR CONFORMITY TESTING COMMITTEE OF TESTING LABORATORIES
AND CERTIFICATION OF ELECTRICAL
EQUIPMENT

TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING

Terrestrial photovoltaic (PV) modules – Design qualification and type approval – Part 2: Test procedures
IEC 61215-2:2016

Clause Testing Testing / measuring equipment / material needed Subcontracting


- Test apparatus as described in section 10.17 with a velocity re-
peatability of +/- 5%.
- Instrument for velocity measurement with an accuracy of +/- 2%,
no more than 1 m from module impact surface
- Weighing instrument with an accuracy of +/- 2%
4.17 Hail test (MQT 17) R
- Vernier
- Freezer (-10°C +/- 5°C) and container (-4°C +/- 2°C)for produc-
tion and storage of ice balls
- Apparatus to verify ice ball diameter to within +/- 5% of require-
ment and mass within +/- 5% of requirement.
- Apparatus to heat the module to temperature 30°C +/- 2°C, 50°C
+/- 2°C, 70°C +/- 2°C and 90°C +/- 2°C.
- Means for applying a pulse current equal to the STC short-circuit
current with a pulse width not exceeding 1 ms.
- Means for measuring the junction voltage of the bypass diodes to
4.18.1 Bypass diode thermal testing (MQT 18.1) R
an accuracy of 2 %
- Means for monitoring the flow of current through the module
- Apparatus to heat the module to temperature 75°C +/- 5°C
- Equipment for applying a current to 1,25 times the short-circuit
current of the module as measured at STC
- Means for measuring current-voltage curve within 1 s; e.g. I-V
curve tracer, with an accuracy of the voltage and current meas-
4.18.2 Bypass diode functionality testing (MQT 18.2) R
urement shall be at least 1 % of reading (for method A) or All
equipment for 4.2 (for method B)

2017-01-20 5/6 PV/61215-2


IEC SYSTEM FOR CONFORMITY TESTING COMMITTEE OF TESTING LABORATORIES
AND CERTIFICATION OF ELECTRICAL
EQUIPMENT

TESTING AND MEASURING EQUIPMENT/ALLOWED SUBCONTRACTING

Terrestrial photovoltaic (PV) modules – Design qualification and type approval – Part 2: Test procedures
IEC 61215-2:2016

Clause Testing Testing / measuring equipment / material needed Subcontracting


- Radiant source (natural sunlight or a steady-state solar simulator
class CCC or better in accordance with IEC 60904-9 (irradiance
800–1000 W/m²))
- Suitable reference device
- Means to mount the modules
- Equipment to control the module temperature in the range 50 +/-
10°C(only indoor stabilization)
4.19 Stabilization(MQT 19) R
- Means for measuring the module temperature to an accuracy of
+/- 2°C and repeatability of +/- 0.5°C.
- Resistive load sized such that the module will operate near its
maximum power point or electronic maximum power point tracker
(MPPT)
- All equipment for 4.2 (MQT 02)
- All equipment for performance at STC (MQT 06)

2017-01-20 6/6 PV/61215-2