Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
___________________________________________________________________________________________________________
TABLE OF CONTENT
1.1 General 1
Introduction
1.1 General
The Government of India has entrusted to the National Highways Authority of India (NHAI),
under Ministry of Shipping, Road Transport and Highways (MORTH) for the development of
highways under National Highways Development Program (NHDP). The projects contemplate
enhancing the traffic capacity and safety on the selected heavily trafficked high density stretches
corridors of National highways for efficient transportation of public and goods. It is stipulated in
the Concession Agreements (CA) of the Public Private partnership (PPP) Projects that the
Concessionaire shall develop, implement an administer a surveillance and safety program for
providing a safe environment on or about the Project Highways and or shall comply with the
safety requirements set forth in Schedule ‘L’ of the CA in Development, Construction and
Operation & Maintenance Phase of the Project. It is also stipulated in the CA that NHAI shall
appoint an experienced and qualified firm or organization as a “Safety Consultant” for carrying
out safety audit of the Project Highway in accordance with the safety requirements set forth in
Schedule-L for the aforesaid Phases of Project.
The project Corridor under consideration falls under NHDP Phase IV, a program of 4 laning to be
undertaken on Design, Built, Finance, Operate and Transfer (Toll) basis. The project corridor is
located in the state of Rajasthan and passes through Rajsamand and Udaipur districts.
The Development of Project consists of Four Laning of Gomati Chauraha - Udaipur Section of
NH-8 from Km.177.000 to Km.260.100 including service road on both sides of Main
Carriageway as indicated in CA, Schedule - B. The estimated cost of the Project is Rs. 914.5
Crore. The Project was awarded to M/s Shreenathji - Udaipur Tollway Private Limited
(Concessionaire) and the LOA was issued on 12th March 2012 and Agreement signed on 18th
April 2012. The Project construction period is 30 months and the concession period is 27 years.
M/s. Aarvee Associates Architects Engineers & Consultants Pvt. Ltd. has been appointed as
Independent Engineer (IE) of the project. Independent Engineer is mobilized on December
2012. IE has established its office (TL's Office) at H.No. 52, Jain Colony, New Bhopalpura, Behind
Mataji Mandir, Udaipur for providing effective services for project work in between Km. 177.000
to Km. 260.100.
1|Page
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
Gomati Chauraha
Km. 177.000
NH 8
NH 8
NH 8
Udaipur
Km. 260.100
2|Page
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
3|Page
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
4|Page
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
Road Safety Inspection was conducted from 22 May 2014 to 26 May 2014 by M/s Aarvee
Associates represented by the following professionals:
A meeting was conducted with concessionaire at their camp office on 26 May 2014. Mr A.N
Batavi (CPM) and other senior professionals had attended the meeting. The agenda of the
meeting is to discuss the safety measures to be taken during the construction stages.
Observations
During the site visit it was informed by concessionaire officials that about 90% of the detailed
design drawings were finalized. The inspection team visited the works zone include
construction of Highway works (C&G, Earthworks in Embankment and sub grade, GSB, WMM,
DBM), Structure works and Tunneling. It was observed that about 30% of the physical work is
completed in overall and the construction progress is good as on date. The following areas of
construction were reviewed for safety and observations were recorded below:
Observations
5|Page
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
Recommendations
Observations
Recommendations
6|Page
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
are mandatory for tunnel works. This must be provided to all workers,
supervisors, Engineers and visitors
- Hard Hat or Helmets
- Goggles for eye protection
- Respiratory protection like nose masks
- Ear protection equipments
- High visibility fluorescent colour safety vests
• Access Control to site
- Controlled by entry/ exit system
- Recording the personal/ vehicles entry with a register book
• Replace “Helmet Zone” warning board to “PPE Zone” board
• Provide water sprinkler system
• Install fire extinguisher conform to IS 2190:1992,. All workers, and supervisors
shall be trained on operating the fire extinguisher
• Electrical tools to be double insulated
• Install fire detector and emergency alarm equipment
• Provide lighting equipment for power failure
• Escape and Guidance facilities; Guide board – direct road users the evacuation
route
• Provision for Tunnel Ventilation – To provide fresh air so as to reduce the effects of
contaminants so that they are within the permissible limit both during
construction and operation stage.
• Adopt water sprinkler system in case of excessive dust emission
Recommendations
7|Page
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
• Electrical cables at site are properly insulated and adopt proper housekeeping
measures
• No PPE's
• Children observed on site
• Working at height without precaution
Recommendations
Recommendations
About 44 proposed median opening locations which were reviewed for safety. The median
opening at the following chainages to be considered under strict safety measures
8|Page
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
Safety measures provided by the concessionaire at the working zones are not comply with IRC
Standards. The Concessionaire shall take necessary steps to improve the safety measures by
providing signs, delineators, blinkers, barricades etc as per the IRC 55 7 IRC 67:2012 standards.
Following are the recommendations made:
2. The concessionaire shall take proper and vigilant measures of traffic and safety measures
at heavy urban settlement areas at the Flyovers locations viz Nathwara & Rajsamudh
3. The Concessionaire shall follow safety measures mentioned in the methodology for
tunneling operations. Special emphasis shall be given to tunnel ventilation,
communication system during emergencies and fire protection system
4. The concessionaire shall ensure regularity in placement of signs and sizes to follow as
per IRC standards
7. The Concessionaire shall adopt the following Safety awareness and precautions
- Installation of Safety posters at base camps and offices
- Tool Box meeting and safety drills
- Risk assessment and precautionary measures
- Fire Protection measures
-Compulsory disclosure of information regarding danger, detailed health and safety policy to
workers especially working at confined areas
- Enforce proper PPE standards at site
- Ensure electrical and mechanical safety and checking of required licenses
- Recording of accidents and near misses to NHAI/ IE on Monthly Basis
-Deployment of required safety personnel, Inspection at regular basis and ensure proper
maintenance of safety measures at site.
9|Page
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
Appendix 1- A
Safety workshop
A safety workshop conducted by Biju Muthu, RSE represented by the following attendees:
List of attendees:
1. Mr Rajan Kumar
2. Mr S P Singh
5. Mr Ranjit Kumar
7. Mr Sunil Kumar
8. Mr Rajiv Gupta
9. Mr Rajendra Kumar
10 | P a g e
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
Appendix 1 -B
Safety Meeting
A safety meeting conducted by Biju Muthu, RSE represented by the following attendees:
List of attendees
11 | P a g e
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
Appendix 2
Photographs of Safety lapses
Heavy equipments working without precaution Inadequate diversion and traffic mgt measures
12 | P a g e
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
13 | P a g e
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
14 | P a g e
Road Safety Report No 02: May 2014
Independent Engineer Services of 4 Laning of Gomati Chauraha – Udaipur Section of NH-8
15 | P a g e