You are on page 1of 1

EXISTING BRIDGE 23 2

EXISTING BRIDGE OLD CENTER LINE 1 1 34


OLD CENTER LINE T-19/BM40 BBM138 3 6 .M . Ar ea = 45 1 SQ .M.
= 270 SQ.M.
Ar ea = 31 5 SQ Ar ea
NEW CENTER LINE 10 11 2 Area = 435 SQ.M
.
AN
GE 9 Area = 362 SQ.M
. Are TONLOT 6
7 E1 PROPOSED BRID 8 LO T 1 . a T IO
OM 3 2 1
6 L 1 ABELARDO DELOS SA .M.
NTOS O T 4 SQ.M 1
ota RIC
l= 5
TO SQ L 00 4 100 ARDO6
2 BAR. Are a To tal= 13 57 4 5 At=1 0

SA
T
5 LO CIA .M 1 7 0S
Q.M
EN SQ 65 34 Are

EX
L O .
ES=737 aT

IST
R ota 3T 2 1
10

ING
C A

N
7 2 l =3 3

BR
L 265
AreOLIT LOT 9

IDG
aT AP 2 2 SQ L
11 .M. Area OT

JO
8

E
4 ota OL =2 5
l=3 ICA 3 292
,56 RP
1 S IO SQ

SE
P.S. Q.M .M.
.
RI
VE
R 7 65
4 7
5 6
4

7 6 5

1100
0 5.5 11 27.5 55.0 110.0

SURVEYED: SUBMITTED: UPMO-BMC BUREAU OF DESIGN Office of the Secretary Project and Location: SHEET CONTENT: SHEET NO.
Reviewed/Recommended: Reviewed as to Data Presented Recommended: Recommending Approval: Approved:

P
DSI JOHN D. TELAGEN

ENGINEERING SERVICES

You might also like