You are on page 1of 1
Bar wey worata Prater fer feo U. P. Rajkiya Nirman Nigam Ltd. (A State Govt. Undertaking) TSO 9001: 2008 CERTIFIED pratere: ora uftaror werere(fa0) OFFICE : Add. Project Manager (E) arraeah fae garg maPsraraTe CONSULTANCY ELECT UNIT GHAZIABAD qerauex asi fst Aa UNDER BSR ROAD OVER BRIDGE I Fae S AHA, aA TAN shade Ts, (OPP-GAGAN ENCLAVE, AMRIT NAGAR ifsrarare—201009 G.T, ROAD, GHAZIABAD-201009 Email: upraneug@gmail.com ‘Ref: UPRNN/SAILRSP/2020°029 Date: 28° Te, General Manager (Project) Stee] Authority of India Rourkela Steel Plant, Rourkela 769 O11 Kind Attn: Sh. S. Soren Sub: Evacuation of Power at 220kV from NSPCL to MSDS-IV at RSP:- Approval of pending foundation layout drawings Ref 1.Contraet No, 042/383/1990000012/19049116 Did. 04.12.2019 2.Your leter ref. no, GM(PYSS/220KV PE/937 Dtd. 22.04.2020 Dear Sir, We appreciate your quick response for providing approval of additional vendor for civil works of MSDS-IV and CTY. In reciprocate, M/s Maa Trini is also planning to mobilize the site with in next 3-4 days, however the construction work will hot be started until required drawings are approved by SAIL. We are planning to complete the entire civil activities of MSDS-IV and CTY before arriving of monsoon. ‘You will appreciate the proactive approach to complete the work, we are struggling to deal with the challenges COVID- 19 presents ( labor shortages, supply chain disruptions, or other impacts that are affecting. performance.) In continuation to above, we would like to draw your kind attention to the following points, 1. We have submitted the foundation layout drawing vide letter no. UPRNNL/SAIL/220KV/021 dated 21.03.2020, since delay in the finalisation of foundation layout drawing; we could not take up the civil work at MSDS-1V. ter the finalization of foundation layout, we will immediately start Bay marking and civil activites at MSDS-1V. Individual equipment foundation drawings are not approved till now, which is prepared on the bases of existing MSDS~ IV bays as per agreement After the Approval of e for manucaturing, ment foiindation, we will start the foundation work and release the structure drawing It may be noted that the drawings are similar to existing drawings. In view of above, we request your support for early approval of structural, civil construction and foundation layout of MSDS-IV sothat the work can be started at site without any further delay ‘Thanking You Your sincerely, Be isan adi F nist rae) apy 0: 1-CGM (Poet) RSP fr kind nfrtion nd necessary atin plese 3 Gu, R&P forking infomation an neces eon lee 3.GM Ve (CET) for kind information and necessary action please Regd. Office: -Visweshwarariya Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow-266010. Ph: EPBX-2720665, 2720670, 2720671 ohage aorafere : fara” atar was, fayfy aes salah are crew — 226010 Post Box ~ 11, Telex-0535-2355 UPRNN in Fax: 0522-2720846 E-mail: uprniko@ysnknet Website: http//www.welcometo prantko

You might also like