Assumptions
Rate of Inflation 5%
Discount Rate 12%
Cum. (Initial cost + Cum. (Initial cost +
Year
1
a) For Rigid Pavement Inflation factor Doscounting
Cost of civil works exlcuding centages 392.29 crores 5% 12%
annual routine maintenance for joint repair @ 0.1% of
0.392 crores 105% 112%
civil cost
Cum Net
Cost After Discounted
Cost (Crores Present Inflation Discount
Year Construction Item Inflation(at Cost (at
Rs) Value(Crores Factor Rate Factor
5%) 12%)
Rs)
2017 1 st year const 117.687 117.69 117.69 117.69 1.000 1.000
2018 2 st year const 156.916 164.76 147.11 264.80 1.050 1.120
2019 3 st year const 117.687 129.75 103.44 368.23 1.103 1.254
2020 Annual Maint 0.392 0.45 0.32 368.55 1.158 1.405
2021 Annual Maint 0.392 0.48 0.30 368.86 1.216 1.574
2022 Annual Maint 0.392 0.50 0.28 369.14 1.276 1.762
2023 Annual Maint 0.392 0.53 0.27 369.41 1.340 1.974
2024 Annual Maint 0.392 0.55 0.25 369.66 1.407 2.211
2025 Annual Maint 0.392 0.58 0.23 369.89 1.477 2.476
2026 Annual Maint 0.392 0.61 0.22 370.11 1.551 2.773
2027 Annual Maint 0.392 0.64 0.21 370.32 1.629 3.106
2028 Annual Maint 0.392 0.67 0.19 370.51 1.710 3.479
2029 Annual Maint 0.392 0.70 0.18 370.69 1.796 3.896
2030 Annual Maint 0.392 0.74 0.17 370.86 1.886 4.363
2031 Annual Maint 0.392 0.78 0.16 371.02 1.980 4.887
2032 Annual Maint 0.392 0.82 0.15 371.17 2.079 5.474
2033 Annual Maint 0.392 0.86 0.14 371.31 2.183 6.130
2034 Annual Maint 0.392 0.90 0.13 371.44 2.292 6.866
2035 Annual Maint 0.392 0.94 0.12 371.56 2.407 7.690
2036 Annual Maint 0.392 0.99 0.12 371.68 2.527 8.613
2037 Annual Maint 0.392 1.04 0.11 371.78 2.653 9.646
2038 Annual Maint 0.392 1.09 0.10 371.89 2.786 10.804
2039 Annual Maint 0.392 1.15 0.09 371.98 2.925 12.100
2040 Annual Maint 0.392 1.20 0.09 372.07 3.072 13.552
2041 Annual Maint 0.392 1.27 0.08 372.15 3.225 15.179
2042 Annual Maint 0.392 1.33 0.08 372.23 3.386 17.000
2043 Annual Maint 0.392 1.39 0.07 372.30 3.556 19.040
2044 Annual Maint 0.392 1.46 0.07 372.37 3.733 21.325
2045 Annual Maint 0.392 1.54 0.06 372.44 3.920 23.884
2046 Annual Maint 0.392 1.61 0.06 372.50 4.116 26.750
2047 Annual Maint 0.392 1.70 0.06 372.55 4.322 29.960
2048 Annual Maint 0.392 1.78 0.05 372.61 4.538 33.555
2049 Annual Maint 0.392 1.87 0.05 372.66 4.765 37.582
2
b) For Flexible Pavement
Cost of civil works exlcuding centages 362.83 crores
annual routine maintenance for shoulder rain cut repair,
0.91 crores 105% 112%
potholes etc. @ 0.25% of civil cost
Cum Net
Cost After Discounte Discount
Cost (Crores Present Inflation
Year Construction Item Inflation(at d Cost (at Rate
Rs) Value(Cro Factor
5%) 12%) Factor
res Rs)
2017 1 st year const 108.85 108.85 108.85 108.85 1.000 1.000
2018 2 st year const 145.13 152.39 136.06 244.91 1.050 1.120
2019 3 st year const 108.85 120.01 95.67 340.58 1.103 1.254
2020 Annual Maint 0.91 1.05 0.75 341.33 1.158 1.405
2021 Annual Maint 0.91 1.10 0.70 342.03 1.216 1.574
2022 Annual Maint 0.91 1.16 0.66 342.68 1.276 1.762
2023 Annual Maint 0.91 1.22 0.62 343.30 1.340 1.974
Periodic renewal with BC
2024 26.75 37.64 17.02 360.32 1.407 2.211
40mm
2025 Annual Maint 0.91 1.34 0.54 360.87 1.477 2.476
2026 Annual Maint 0.91 1.41 0.51 361.37 1.551 2.773
2027 Annual Maint 0.91 1.48 0.48 361.85 1.629 3.106
2028 Annual Maint 0.91 1.55 0.45 362.29 1.710 3.479
Periodic renewal with BC
2029 26.75 48.03 12.33 374.62 1.796 3.896
40mm
2030 Annual Maint 0.91 1.71 0.39 375.02 1.886 4.363
2031 Annual Maint 0.91 1.80 0.37 375.38 1.980 4.887
2032 Annual Maint 0.91 1.89 0.34 375.73 2.079 5.474
2033 Annual Maint 0.91 1.98 0.32 376.05 2.183 6.130
Periodic renewal with BC
2034 32.34 74.12 10.80 386.85 2.292 6.866
50mm
2035 Annual Maint 0.91 2.18 0.28 387.13 2.407 7.690
2036 Annual Maint 0.91 2.29 0.27 387.40 2.527 8.613
2037 Annual Maint 0.91 2.41 0.25 387.65 2.653 9.646
2038 Annual Maint 0.91 2.53 0.23 387.88 2.786 10.804
Overlay with 50mm BC and
2039 78.93 230.90 19.08 406.96 2.925 12.100
105 mm DBM
2040 Annual Maint 0.91 2.79 0.21 407.17 3.072 13.552
2041 Annual Maint 0.91 2.93 0.19 407.36 3.225 15.179
2042 Annual Maint 0.91 3.07 0.18 407.54 3.386 17.000
2043 Annual Maint 0.91 3.23 0.17 407.71 3.556 19.040
Periodic renewal with BC
2044 32.34 120.74 5.66 413.37 3.733 21.325
50mm
2045 Annual Maint 0.91 3.56 0.15 413.52 3.920 23.884
2046 Annual Maint 0.91 3.73 0.14 413.66 4.116 26.750
2047 Annual Maint 0.91 3.92 0.13 413.79 4.322 29.960
2048 Annual Maint 0.91 4.12 0.12 413.91 4.538 33.555
Periodic renewal with BC
2049 32.34 154.09 4.10 418.01 4.765 37.582
50mm
3
Periodic Maintenance (During O&M Period)
Appointed date as : 1-Jan-2017
COD: (commercial operation date) 1-Jul-2019 (Construction period = 2.5 years =30 months = 912 days)
End of Concession: 30-Jun-2049 (Operation period 30 years)
Frequency for Periodical Renewal:
5Years (I Periodical Renewal) :
st
1-Jul-2023 (Periodical Renewal assumed in the present analysis)
10Years(2nd Periodical Renewal) : 1-Jul-2028 (Periodical Renewal assumed in the present analysis)
15Years(3rd Periodical Renewal) : 1-Jul-2033 (Periodical Renewal assumed in the present analysis)
20Years(4th Periodical Renewal) : 1-Jul-2038 (Periodical Renewal assumed in the present analysis)
25 Years (5th Periodical Renewal): 1-Jul-2043 (Periodical Renewal assumed in the present analysis)
Strengthening 20th Year 1-Jul-2038 Overlay of DBM +AC
Area of Pavement:
2 L+PS Carriageway width: 10.000 m 4 L+PS Carriageway width: 15 m
Length of stretch 2L+PS : 44.19 km Length of stretch 4L+PS : 4.4 km
Width of Service Road : 0.000 m
Length of Service Road : 0.000 km
Area of Main Carriageway (2L+PS)and (4L+PS): 558,690 sqm 10% extra taken due to Junctions.
Area of Service Road : - sqm
Area of earthen Shoulder: 176,760 sqm (Main Carriageway Only)
Specification for Periodical Renewal : (In 1st, 2nd periodical slab): 40 mm (BC) 30 mm (BC) Traffic - 44 MSA and 8% CBR Subgrade
Total Cost (at present rate) 267,472,925 267,472,925 789,345,254 323,392,207 323,392,207 323,392,207
26.75 26.75 32.34 78.93 32.34 32.34
Cost for Periodical Renewal (at Present Rates for 1st, 2nd periodical slab):
Amount
Description Unit Qty Rate Remarks
(Rs.)
(Main Carriageway +
Tack Coat 2 on bituminous surface- 2.0 kg /10sqm M² 558,690 9.00 5,028,210
Service Roads)
Tack Coat 1 over primed base - 2.5 kg /10sqm below DBM M² 558,690 11.50 6,424,935 Main Carriageway
Quantity of BC (Main carriageway 2L+PS and 4L+PS) M³ 22,348 10009.00 223,677,128 Main Carriageway
Quantity of BC (Service Roads) M³ - 10009.00 - Service road
Quantity of DBM (Main Carriageway for 2nd Periodic renewal) M³ - 9139.00 - Main Carriageway
Earthwork in Shoulders M³ 51,260 492 25,220,117 Main Carriageway
(Main Carriageway +
Thermoplastic Paint (Lane/edge marking & Arrrow painting) M² 17,663 767 13,547,470
Service Roads)
Total Cost for 1 and 2 periodic renewal with BC: 267,472,925 Say Rs.2674.73 Lakh
Cost for Periodical Renewal (at Present Rates for 1st, 2nd periodical slab):
Amount
Description Unit Qty Rate Remarks
(Rs.)
(Main Carriageway +
Tack Coat 2 on bituminous surface- 2.0 kg /10sqm M² 558,690 9.00 5,028,210
Service Roads)
Tack Coat 1 over primed base - 2.5 kg /10sqm below DBM M² 558,690 11.50 6,424,935 Main Carriageway
Quantity of BC (Main carriageway 2L+PS and 4L+PS) M³ 27,935 10009.00 279,596,411 Main Carriageway
Quantity of BC (Service Roads) M³ - 10009.00 - Service road
Quantity of DBM (Main Carriageway for 2nd Periodic renewal) M³ 50,282 9139.00 459,528,112 Main Carriageway
Earthwork in Shoulders M³ 51,260 492 25,220,117 Main Carriageway
(Main Carriageway +
Thermoplastic Paint (Lane/edge marking & Arrrow painting) M² 17,663 767 13,547,470
Service Roads)
Total Cost for 4,5 and 6 periodic renewal with BC: 323,392,207 Say Rs.3233.92 Lakh
Total Cost for pavement renewal with BC and DBM : 789,345,254 Say Rs.7893.45 Lakh
4
Annexure 1
Upgradation of Wiasrwadi (NH-6)-Nandurbar-Prakasha-Shahada-Khetia (MP Border) , Package-11 of 19
from Km.50/200 to Km. 98/800 to 2 lane with paved shoulder configuration in the state of Maharashtra
5
Annexure 2
Upgradation of Wiasrwadi (NH-6)-Nandurbar-Prakasha-Shahada-Khetia (MP Border) , Package-11 of 19 from
Km.50/200 to Km. 98/800 to 2 lane with paved shoulder configuration in the state of Maharashtra
6
LIFE CYCLE COST ANALYSIS
Upgradation of Wiasrwadi (NH-6)-
Nandurbar-Prakasha-Shahada-Khetia (MP
Border) , Package-11 of 19 from Km. 50/200 to
Km. 98/800 to 2 lane with paved shoulder
Package II