ITE
M DESCRIPTION DIA LENGTH NO OF TOTAL NO
NO MEMBERS 6 8 10 12 14 16
METER BARS BARS
SUB STRUCTURE
Footings
F1 14 2.60 24 5 312 312
8 1.40 4 5 28 28
F2 14 2.25 20 18 810 810
8 1.25 4 18 90 90
F3 12 1.90 18 23 786.6 786.6
8 1.10 4 23 101.2 101.2
Foundation column
C1 20 4.75 10 2 95
8 1.30 17 2 44.2 44.2
C2 16 4.59 8 1 36.72 36.72
8 1.20 17 1 20.4 20.4
C3 20 4.75 12 1 57
8 1.10 17 1 18.7 18.7
C4 20 4.75 8 2 76
8 1.30 17 2 44.2 44.2
C5 20 4.75 12 18 1026
8 1.10 17 18 336.6 336.6
SUPER STRUCTURE
Elevation Columns
Ground Floor
C1 20 4.20 10 2 84
BAR SCHEDULE
ITE
M DESCRIPTION DIA LENGTH NO OF TOTAL NO
NO MEMBERS 6 8 10 12 14 16
METER BARS BARS
SUB STRUCTURE
8 1.30 18 2 46.8 46.8
C2 16 4.04 8 1 32.32 32.32
8 1.20 18 1 21.6 21.6
C3 20 4.20 12 1 50.4
8 1.10 18 1 19.8 19.8
C4 20 4.20 8 2 67.2
8 1.20 18 2 43.2 43.2
C5 20 4.20 12 18 907.2
8 1.10 18 18 356.4 356.4
C7 20 4.20 8 11 369.6
8 1.10 18 11 217.8 217.8
C9 20 4.20 8 2 67.2
8 1.10 18 2 39.6 39.6
BAR SCHEDULE
ITE
M DESCRIPTION DIA LENGTH NO OF TOTAL NO
NO MEMBERS 6 8 10 12 14 16
METER BARS BARS
SUB STRUCTURE
C5 20 4.20 8 18 604.8
8 1.10 18 18 356.4 356.4
C9 20 4.20 8 2 67.2
8 1.10 18 2 39.6 39.6
Second Floor
C1 20 4.20 10 2 84
8 1.30 18 2 46.8 46.8
C2 14 3.96 8 1 31.68 31.68
8 1.20 22 1 26.4 26.4
C3 16 4.04 8 1 32.32 32.32
8 1.10 18 1 19.8 19.8
C4 16 4.04 8 2 64.64 64.64
8 1.30 18 2 46.8 46.8
C11 14 6.00 4 2 48 48
8 0.90 22 2 39.6 39.6
Roof Top
C1 14 3.38 8 2 54.08 54.08
8 1.30 20 2 52 52
C2 14 3.48 6 1 20.88 20.88
8 1.10 22 1 24.2 24.2
C3 14 3.38 8 1 27.04 27.04
8 1.10 22 1 24.2 24.2
Floor Beams
FB1 @ level 3.4m 12 5.87 2 1 11.74 11.74
12 5.37 2 1 10.74 10.74
BAR SCHEDULE
ITE
M DESCRIPTION DIA LENGTH NO OF TOTAL NO
NO MEMBERS 6 8 10 12 14 16
METER BARS BARS
SUB STRUCTURE
8 1.10 28 1 30.8 30.8
95
57
76
1026
228
20 24
418
76
20 24
20 24
1976 0 0 0 0 0
2.469 3.556 4.173 4.840 5.556 6.321
4878.7 0 0 0 0 0
84
20 24
50.4
67.2
907.2
201.6
369.6
67.2
20 24
84
33.6
67.2
604.8
134.4
20 24
67.2
84
20 24
67.2
20 24
20 24
20 24
20 24
33.12
20 24
125.28
44.16
4.96
116.4
44.16
132.24
22.08
24.72
20 24
16.26
44.16
12.84
48.78
48.78
20 24
18.74
35.22
18.74
20 24
20 24
11.04
20 24
20 24
20 24
20 24
20 24
20 24
20 24
20 24
20 24
20 24
20 24
20 24
20 24
20 24
3691.3 0 0 0 0 0
2.469 3.556 4.173 4.840 5.556 6.321
9113.8 0 0 0 0 0
TAKEOFF SHEET
TIM DIMEN QTY TOTAL
SING SION QTY DESCRIPTION
1 22.23 EGA Roof
12 266.76
266.76 m2 34.3
1 12 12 3.2 Gutter (97cm development length)
12 ml
RHS truss
31 7.41 229.71 Truss upper chord (60x60x3mm)
28.26 kg/m
6491.6 kg
31 8 248 truss lower chord (70x50x3mm)
27.475 kg/m
6813.8 kg
31 11.114 344.534 Truss vertical and diagonal members (40x40x3mm)
12.56 kg/m
4327.35 kg
28 11.8 330.4 purlin (40x40x3mm)
12.56 kg/m
4149.82 kg
Aluminium Plate
2 65.84 For External Walls
3.30
434.54
10 3.38 ddt (W1)
2.10
-70.98
2 5.4 ddt (W2)
2.10
-22.68
2 6.05 ddt (W3)
TAKEOFF SHEET
TIM DIMEN QTY TOTAL
SING SION QTY DESCRIPTION
2.10
-25.41
1 1.2 ddt (WD1)
3.30
-3.96
1 2.1 ddt (WD1)
1.29
-2.71
1 3.3 ddt (WD2)
1.80
-5.94
1 2.1 ddt (WD2)
4.20
-8.82
294.04 m2 Total
2 24.78 For Internal walls
3.30
163.55
163.55 m2 Total
2 65.84 For decoration wall at the top
0.60
79.01
373.05 m2Total External sum
536.60 m2 Total Internal and External
chs 51.85
TAKEOFF SHEET
TIM DIMEN QTY TOTAL
SING SION QTY DESCRIPTION
TAKEOFF SHEET
TIM DIMEN QTY TOTAL
SING SION QTY DESCRIPTION
TAKEOFF SHEET
TIM DIMEN QTY TOTAL
SING SION QTY DESCRIPTION
TAKEOFF SHEET
TIM DIMEN QTY TOTAL
SING SION QTY DESCRIPTION
TAKEOFF SHEET
TIM DIMEN QTY TOTAL
SING SION QTY DESCRIPTION
17.15
embers (40x40x3mm)
m) for stair
CENTRAL COMMAND
A-SUB STRUCTURE
TOTAL A ,, ,, #REF!
B. SUPER STRUCTURE
3 ROOFING.............................................................................. ,, ,, 181,559.52
TOTAL B ,, ,, #REF!
TOTAL A + B ,, ,, #REF!
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
A-SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Clear and remove top soil to an average depth of 200mm. M2 #REF! 13.72 #REF!
A) In ordinary soil
M3 #REF! 78.34 #REF!
B) In soft rock M3 1.00 95.37 95.37
C) In hard rock M3
1.00 591.21 591.21
D) In boulder M3 1.00 465.40 465.40
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
2. BLOCK WORK
PROJECT :- ARMY FOUNDATION
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
2.2 Ditto, as item 2.1 but 15 cm thick class c M2 #REF! 405.46 #REF!
2.3 Ditto, as item 2.1 but 10 cm thick class c M2 #REF! 214.94 #REF!
Total carried to summary Birr #REF!
3. ROOFING
3.1 Apply light weight concrete over roof slab with 2% slope
towards down pipe openings and make ready for water
proofing works (price includes chiseling the surface ).
M2 266.76 112.90 30,117.20
3.2 Spread and level 3cm thick cement sand screed(1:3) on top
of light weight concrete to receive water proofing
M2 266.76 167.71 44,738.32
material.
3.3 Supply and lay a single Plyhertalan or equivalent water-
proofing system (membrane type), manufactured from a
special HERTLAN (EPDM ) rubber compound, shall be
used on the terrace roof. The water-proofing EPDM-
system shall include contact and bonding adhesives,
Sealant roof drain connection and all other necessary
accessories needed to complete the work. The entire work
shall be executed based on details provided by the
manufacturer and approval of the engineer.
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
5.1 Supply and fix 38mm*38mm black iron LTZ section steel
profile frame metal doors including all the necessary
accessories. Unit price includes best quality cylindrical
door lock, one coat of anti-rust and two coats of synthetic
enamel paint all according to the detail drawing:
WINDOW DOORS
a) WD1 Size: - 130*225cm pcs 2.00 -
b) WD2 Size: - 220*200cm pcs 4.00 -
c) WD3 Size: - 235*195cm pcs 1.00 -
d) WD4 Size: - 284*285cm pcs 4.00 -
e) WD5 Size: - 300*295cm pcs 2.00 -
f) WD6 Size: - 320*270cm pcs 1.00 -
WINDOWS
a) W1 Size: - 40*240cm pcs #REF! #REF!
b) W2 Size: - 45*240cm pcs #REF! #REF!
c) W3 Size: - 50*120cm pcs #REF! #REF!
d) W4 Size: - 50*140cm pcs #REF! #REF!
e) W5 Size: - 50*160cm pcs #REF! #REF!
f) W6 Size: - 50*180cm pcs #REF! #REF!
g) W7 Size: - 50*200cm pcs #REF! #REF!
h) W8 Size: - 50*220cm pcs #REF! #REF!
i) W9 Size: - 90*95cm pcs #REF! #REF!
j) W10 Size: - 120*180cm pcs #REF! #REF!
k) W11 Size: - 120*185cm pcs #REF! #REF!
PROJECT :- ARMY FOUNDATION
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
6. FINISHING
Finishing work shall include all surface pre-cleaning,
Preparation and application of the finish, polishing and
cleaning at the end of finished work.
6.2 Ditto item 6.1 to but for concrete ceiling , stair & landing
soffit . M2 #REF! 308.98 #REF!
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
7.2 Ditto item 8.1 but, to R.C slab,stair case ,landing, soffit. M2 #REF! 72.81 #REF!
-
7.3 Apply approved type quartz paint to all external
plastered HCB & structure surfaces as located in the
drawing. Price shall one coat of prime.
M2 #REF! 26.00 #REF!
Total carried to summary Birr #REF!
8. GLAZING
8.1
4mm thick clear glass glazed to metal beads & including
good quality putty. (At the top of flush wooden doors). M2 #REF! 490.35 #REF!
Total carried to summary Birr #REF!
9. ELECTRICAL INSTALLATION
9.1 All distribution boards , breakers , switches, accessories
etc should be genuine Legrand , ABB, Siemens or
approved equivalents complying with IEC standards.
Distribution boards should be made of sheet metal and
have separate neutral and ground busbars/phase bars.All
units in the distribution boards should should be labled to
give the reference and duty of the unit.
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
9.9 lay pvc pipe diameter 50mm for tele entry in/under
surface tentatively
ML 8 25.17 201.36
9.1 Supply power from GFMDB-T0-1FSDB through PVC
insulated copper cable of 4x10+10 sq.mm in PVC PIPE
minimum diameter 40mm in/under surface tentatively
ML 18 162.17 2,919.06
9.11 Supply power from GFMDB -to-2FSDBthrough PVC
insulated copper cable of 4x16+16 sq.mm in thermoplastic
conduit of minimum f 40mmIn/under surface tentatively
ML 6 228.42 1,370.52
8.12 Earthing electrode1500x16mmtype furse RB210 complete
with coupling driven stud
No 3 466.79 1,400.37
9.13 Lay pvc insulated copper conductor of 1x16mm2
in/under surface in thermoplastic conduit 25mm
in/under surface form GFMDB to earth electrode
tentatively
ML 16 66.60 1,065.60
9.14 Tele terminal box 30x20x7cm made of plastic junction box
No 3 110.00 330.00
Lighting prevent or type pulsar or equivalent p3 H[m]=4
9.15 Rp(M)=87 No 1 25,980.50 25,980.50
9.16 Copper tape 25x3mm with clips to fix on the wall.and
with adesive tape on the roof tentatively
ML 65 251.07 16,319.55
9.17 Test point
No 2 251.07 502.14
9.18 Bare copper stranded wire 1 x 70mm2 tentatively
ML 6 175.50 1,053.00
9.19 MAN HOLES
Construct manholes with HCB wall 200mm thick on mass
concrete bed of 100mm, with inside walls to be plastered
in two coats of cement mortar, with reinforced concrete
slab cover of 60mm thick , steel bar handle and having
internal dimensions of :- 60x60x50cms
No 1 800.00 800.00
9.19.1 Construct manholes with brick wall 250mm thick on mass
concrete bed of 100mm, with inside walls to be plastered
in two coats of cement mortar, with reinforced concrete
slab cover of 60mm thick , steel bar handle and having
internal dimensions of :- 60x60x50cms.
1 1,000.00 1,000.00
9.20 Lay cement pipeф 10cm for power entry tentatively
ML 10 70.00 700.00
PROJECT :- ARMY FOUNDATION
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
ML 20 39.00 780.00
Total carried to summary Eth birr 406,612.11
10. SANITARY INSTALLATION
10.1 SANITARY FIXTURES
All fixtures and pipes which are specified below shall
subject to the Consultants or Owner's approval based
on samples, brochures and catalogues presented by
the contractor. Unit Price shall include all the
necessary fixing brackets or hooks and all assistnace
civil works such as chiselling of walls, floors, beams
etc…
10.1.1 Supply and fix AQUA Hand Wash Basin made of
white vitreous China with chrome plated. The fixture
shall conform to BS5506-3 or equivalent institution.
The taps, chrome plated brass p-trap, waste fittings,
connecting pieces, fixing & supporting elements and
other accessories which complete the set shall comply
with the relevant clauses of BS standard or equivalent
institution.
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
10.5.1 Supply, lay & connect HDPE Pipes (PN -20) for
water supply, as shown on the drawing. Complete
with all the necessary connecting pieces such as
elbow, Tee, unions, etc The installation shall be tested
at a pressure of 10kg /cm² at the expense of the
contractor. The pipe shall comply with DIN-8074,
DIN-8075 or related international quality standards
a) Ø32mm ml 47.0 -
a) Ø40mm ml 17.0 -
b) Ø50mm ml 33.0 602.58 19,885.14
10.5.2 Supply, fix, test and commission EQUIVALENT
Bronze Gate valves, PN 20, of approved Standards &
quality, and the same brand of the pipe, on the water
supply Riser Branch lines to rooms with sanitary
provissions, as where shown on the drawings.
Complete with all required fittings and accesseries
there to.
Diameter 32mm No 4 -
Diameter 40mm No 1 -
Diameter 50mm No 3 2267.01 6,801.03
10.6 FIBER GLASS WATER TANK
10.6.1 Supply and place properly (fix) 3m3 SUPER water
tank where as shown on the sanitary site plan, made
of 5 mm thick fiber glass including all the necessary
connecting fittings and pipes such as outlet pipe with
gate valve, inlet pipe with gate valve, drain pipe with
gate valve, over flow pipe, vent pipe including
manhole cover and vent cape.Provide manhole with
a strong ,lockable and easily openable cover (lid) just
above the inlet pipe.Complete with :-
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
•Prior to the approval of the material submittal of the
detail drawings of the tank is mandatory.
complete with all accessories.
•The fiber glass shall be warranted by the supplier
against all defects and malfunction of materials and
workmanship for a period of Ten years from the
date of completion of works. If problems
arise with the system during the warranty period,all
necessary repairs or replacement shall be made by
the contractor in an expendient manner at no
additional cost pcs 1.00 19828.30 19,828.30
10.6.2 FIBER GLASS GROUND WATER TANK
Supply and place properly (fix) 5m3 water tank
where as shown on the sanitary site plan, made of 5
mm thick fiber glass including all the necessary
connecting fittings and pipes such as outlet pipe with
gate valve, inlet pipe with gate valve, drain pipe with
gate valve, over flow pipe, vent pipe including
manhole cover and vent cape.Provide manhole with
a strong ,lockable and easily openable cover (lid) just
above the inlet pipe.Complete with :-
LOCATION :- SHIRE
No DESCRIPTION UNIT QTY RATE AMOUNT
CONTIGENCY (8%) ,, ,, -
GRAND TOTAL ,, ,, -
1
PROJECT :- CALIBRATION CENTER OFFICE WORK
CONSULTANT:- DCDE
LOCATION :- ADDIS ABABA
ITEM DESCRIPTION UNIT QTY U.PRICE TOTAL PRICE.
1. STRUCTURAL STEEL WORKS
Supply and erect steel structure all as shown on
the detail drawing. Apply two coats of antirust
paint. Price includes all necessary preparation
work such as cleaning, wire brushing and finally
two coats of anti-rust paint.
2
PROJECT :- CALIBRATION CENTER OFFICE WORK
CONSULTANT:- DCDE
LOCATION :- ADDIS ABABA
ITEM DESCRIPTION UNIT QTY U.PRICE TOTAL PRICE.
2. ROOFING
2.1 Supply cut and fix in position EGA-500
0.35mm thick sheet metal in roof cover all as
shown on structural drawings and as
specified in the technical specifications. metal
sheet shall be Carbon Steel complying with
the requirements of BS 4360 or ASTM A 36M.
Headed Bolts shall be ASTM A 307, grade A
or ASTM F 568, Property Class 4.6. Welded
connections shall comply with AWS D1.1 for
procedures, appearance and quality of welds,
& methods used in correcting welding works.
Price shall include one coat of fast curing, rust
inhibiting, non-asphaltic, lead and chromate-
free, universal modified-alkyd primer with
performance complying with the
requirements of FS TT-P-664, two coats of
synthetic enamel paint and paint thinner.
m2 266.76 -
2.2 Supply and erect steel roof truss and purlin all
as shown on the detail drawing. Apply two
coats of antirust paint. Price includes all
necessary preparation work such as cleaning,
wire brushing and finally two coats of anti-
rust paint.
Upper, lower, vertical & diagonal member as
specified on the drawing.
a) SHS size of 60x60x3mm Upper chord kg 6,491.60 -
b) RHS size of 70x50x3mm Lower chord kg 6,813.80 -
c) SHS size of 40x40x3mm vertical and
diagonal members. kg 4,327.35 -
d) SHS size of 40x40x3mm purlin. kg 4,149.82 -
2.3 Supply and fix G-28 galvanized metal sheet gutter
of development length 97cm spliced at joints.
ml 12 -
2.4 Ditto item 3.2 but 87cm development length. ml 24 -
2.5 Supply and fix diameter 110mm galvanized
sheet metal downpipe secured to wall with
metal straps spaced every 800mm price shall
include two coats of anti rust paint
ml 30 -
2.6 Supply and fix 600mmx600mm size
"Armstrong" or equivalent approved type of
ceiling in dunma complete with suspention
system and accessories as per manifacturer.
Price shall include all accessories to complete
the work.
m2 248.98 -
TOTAL CARRIED TO SUMMARY .......
-
3
PROJECT :- CALIBRATION CENTER OFFICE WORK
CONSULTANT:- DCDE
LOCATION :- ADDIS ABABA
ITEM DESCRIPTION UNIT QTY U.PRICE TOTAL PRICE.
3. METAL AND ALUMINIUM WORK
3.1 METAL WORK
3.1.1 Supply and fix stainless steel guardrail (CHS
Ø50mm and 1.2mm thick for handrail , RHS
35x25x1.2mm c/c 1m vertical member
and.Ø19mm and 1mm thick c/c 180mm
horizontal member). Price includes all
necessary fixing accessories.
ml 60.00 -
3.2 ALUMINIUM WORK
3.2.1 Supply, fabricate and fix 2mm thick anodized
aluminium window with 5mm thinted glass.
The anodization thickness should not be less
than 0.5µm. Price includes best quality hinges,
hardwares to complete the work as per
window schedule.
WINDOWS 0.00
a) W1 Size: - 338×210cm pcs 10 -
b) W2 Size: - 540×210cm pcs 2 -
c) W3 Size: - 605×210cm pcs 1 -
d) W4 Size: - 219×210cm pcs 1 -
e) W5 Size: - 420×210cm pcs 1 -
3.2.2 Provide and fix Aluminium Doors made of
2mm thick anodized aluminium profile with
5mm thick thinted glass including hinges,
handles and all accessories, cylinder lock and
hardware all to be high quality and approved.
The anodization thickness should not be less
than 0.5µm. Price shall include 4mm thick
aluminium composite and all the necessary
accessories as per detail drawings.
4
CENTRAL COMMAND
SPECIFICATION AND
CENTRAL COMMAND HEADQUARTER OFFICE BUILDING
BILL OF QUANTITY
AT SHIRE
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
1.1 Site clearing and removing of the top soil with an
average depth of 200mm. . m2 #REF! 13.72 #REF!
1.2 Bulk excavation in ordinary soil to reduce level to
an average depth 400mm from natural ground
level.
A) In ordinary soil m3 #REF! 78.34 #REF!
B) In soft rock m 3
1.00 95.37 95.37
C) In hard rock m3 1.00 591.21 591.21
D) In boulder m 3
1.00 465.40 465.40
-
1.3 Excavate in ordinary soil for trench masonary to a
depth not exceeding 1500mm from stripped level.
A) In ordinary soil m3 #REF! 230.28 #REF!
B) In soft rock m3 1.00 240.76 240.76
C) In hard rock m3 1.00 602.93 602.93
D) In boulder m3 1.00 510.80 510.80
-
1.4 Excavate in ordinary soil for isolated footing to a
depth not exceeding 1500mm from stripped level.
A) In ordinary soil m3 #REF! 230.28 #REF!
B) In soft rock m3 1.00 240.76 240.76
C) In hard rock m3 1.00 602.93 602.93
D) In boulder m3 1.00 510.80 510.80
-
1.5 Ditto item 1.3 but exceeding 1500mm and not
exceeding 3000mm .
A) In ordinary soil m3 #REF! 316.21 #REF!
B) In soft rock m3 1.00 353.11 353.11
C) In hard rock m3 1.00 680.72 680.72
D) In boulder m3 1.00 523.58 523.58
1.6 `
Backfill with selected borrowed granular non
expansive material from quarry, around footings
and foundation column to maintain the desired
level and compact in layers not exceeding 200mm. m3 #REF! 469.53 #REF!
1.7 Backfill with selected borrowed granular non
expansive material from quarry, around stone
masonary to maintain the desired level and
compact in layers not exceeding 200mm.
m3 #REF! 469.53 #REF!
1.8 Backfill with selected borrowed granular non
expansive material from quarry, under hard core to
maintain the desired level and compact in layers
not exceeding 200mm. m3 #REF! 469.53 #REF!
-
113
CENTRAL COMMAND
SPECIFICATION AND
CENTRAL COMMAND HEADQUARTER OFFICE BUILDING
BILL OF QUANTITY
AT SHIRE
113
CENTRAL COMMAND
SPECIFICATION AND
CENTRAL COMMAND HEADQUARTER OFFICE BUILDING
BILL OF QUANTITY
AT SHIRE
B. SUPER-STRUCTURE
1. CONCRETE WORKS
1.1 Reinforced concrete in class C-25 (28-day 150mm
cube crushing strength of 25MPa) with minimum
cement content of 360kg/m3 and maximum
aggregate size of 30mm for footings and 20mm for
columns, beams & slabs; cast into formworks and
vibrated around rod reinforcement bars.( formwork
& reinforcement bars are measured
separately)."Type of cement to be ordinary portland
cement (OPC)" in:
113
CENTRAL COMMAND
SPECIFICATION AND
CENTRAL COMMAND HEADQUARTER OFFICE BUILDING
BILL OF QUANTITY
AT SHIRE
2. BLOCK WORK
2.1 200mm thick hollow concrete block wall of type
Class-C with 28 days minimum crushing strength
of 18kg/cm2, bedded in cement mortar (1:3) mix,
both sides left for plastering. m2 2,228.00 227.76 507,449.28
-
2.2 Ditto but to 150mm thick HCB walls. m2 919.50 214.94 197,637.33
-
TOTAL CARRIED TO SUMMARY ....... 705,086.61
113
CENTRAL COMMAND
SPECIFICATION AND
CENTRAL COMMAND HEADQUARTER OFFICE BUILDING
BILL OF QUANTITY
AT SHIRE
3. ROOFING
113
CENTRAL COMMAND
SPECIFICATION AND
CENTRAL COMMAND HEADQUARTER OFFICE BUILDING
BILL OF QUANTITY
AT SHIRE
WINDOW DOORS
5.1.1 AWD-1 size3200x2700mm No 1.00 21,600.00 21,600.00
-
5.1.2 AWD-2 size (1900x1800)+(900X2100)mm No 1.00 13,275.00 13,275.00
-
5.1.3 AWD-3 size (1200x1900)+(900X2100)mm No 1.00 10,425.00 10,425.00
113
CENTRAL COMMAND
SPECIFICATION AND
CENTRAL COMMAND HEADQUARTER OFFICE BUILDING
BILL OF QUANTITY
AT SHIRE
-
5.2.1 MD-1 size700x2100mm No 16.00 1,470.00 23,520.00
113
CENTRAL COMMAND
SPECIFICATION AND
CENTRAL COMMAND HEADQUARTER OFFICE BUILDING
BILL OF QUANTITY
AT SHIRE
6. FINISHING WORKS
Finishing work shall include all surface pre-
cleaning, Preparation and application of the finish,
polishing and cleaning at the end of finished work.
113
CENTRAL COMMAND
SPECIFICATION AND
CENTRAL COMMAND HEADQUARTER OFFICE BUILDING
BILL OF QUANTITY
AT SHIRE
7 .PAINTING
7.1 Apply three coats of plastic emulsion paint to
internal plastered wall, beam and column surfaces. m2 6,078.40 26.00 158,038.40
-
7.2 Ditto but to RC ceiling, stair case soffit and sides.
m2 2,836.30 29.00 82,252.70
-
7.3 Apply approved type quartz paint to all external
plastered HCB & structure surfaces as located in the
drawing. Price shall one coat of prime. m2 #REF! 26.00 #REF!
-
TOTAL CARRIED TO SUMMARY ....... #REF!
113
BAR SCHEDULE
ITEM NO DESCRIPTION DIA LENGTH NO OF MEMBERS TOTAL NO BARS
METER BARS
Staircase and landing (ground floor)
0
14 4.17 21 1 350.28
14 3.02 21 1 253.68
14 1.695 21 1 142.38
14 1.88 21 1 157.92
14 1.78 21 1 149.52
riser 8 0.866 160 1 554.24
landing 8 2.95 21 1 247.8
landing 8 1.88 32 1 240.64
14 5.38 21 1 451.92
14 2.412 21 1 202.608
14 2.56 21 1 215.04
14 1.6 21 1 134.4
14 3.45 21 1 289.8
Staircase and landing (first to ninth floor) 0
14 7.04 21 9 5322.24
14 3.02 21 9 2283.12
14 1.855 21 9 1402.38
14 1.88 21 9 1421.28
14 1.695 21 9 1281.42
riser 8 0.866 160 9 4988.16
landing 8 2.95 21 9 2230.2
landing 8 1.88 32 9 2165.76
14 5.38 21 9 4067.28
14 2.412 21 9 1823.472
14 2.56 21 9 1935.36
14 1.6 21 9 1209.6
14 3.45 21 9 2608.2
anchored in to beams bars(+33.00) 6 0.45 60 1 27
0
TOTAL LENGTH (m)
UNIT WEIGHT (kg/m)
TOTAL WEIGHT (kg)
6 8 10 12 14 16 20 24 26 28 30 32 REMARK
350.28
253.68
142.38
157.92
149.52
554.24
247.8
240.64
451.92
202.61
215.04
134.4
289.8
5322.2
2283.1
1402.4
1421.3
1281.4
4988
2230.2
2166
4067.3
1823.5
1935.4
1209.6
2608.2
27
27 10427 0 0 25702 0 0 0 0 0 0 0
### 0.395 0.617 ### 1.210 ### 2.469 3.556 4.173 ### 5.556 6.321
5.99 4119 0 0 31099 0 0 0 0 0 0 0