Work Instruction
Doc : 480171018.doc
Tool Procedure
CHANGE PM ORDER
Domain : PM
Process : Corrective Maintenance – Preventive Maintenance
Person in charge : Ida-Marie KASTRUD / Yves-Olivier NZUE-
BEYEME
Author :
VALIDATION
ROLE DATE SIGNATURE
RESPONSIBLE
V0 : Creation
Page 1 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Summary
1.2 Prerequisite.............................................................................................................................. 3
1.3 Glossary................................................................................................................................... 3
1.5 Display.................................................................................................................................... 18
Business recommendations........................................................................................19
Page 2 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
1.2 Prerequisite
The PM order exists in the corresponding planning plant.
1.3 Glossary
Work order : A work order is a technical document which gathers together the operations and
resources required to carry out the work. It is also a financial document capturing all corresponding
costs (activity allocation, external services, procurement, purchasing) from operations.
The operations can be manually entered or automatically uploaded from a standard routine in the
order.The components can be manually entered or automatically uploaded from a bill of material in the
order. This bill of material is linked to functional locations and equipments.
Task list : (routine) a sequence of single tasks including the frequency of some mainly in preventive
cases. They apply to :
- repetitive maintenance/repairing tasks
- repetitive or statutory inspections
- forecasting of services requirements from a specialised supplier
- forecasting of support services requirements (ie. scaffolding, insulation & cleaning)
The maintenance task list contains the same data in each operation as those from PM order
operations.
Page 3 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Bill of material : a bill of material is a list of materials required for the maintenance and the repairing
of functional locations and equipments. It is assigned to functional locations or equipments using
specific materials called "PM assembly".
The bill of material includes :
- material in stock and non-stock
- external purchasing
- PM assemblies including some sub-assemblies in the functional location/equipment.
Page 4 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
1.4.1 Transaction
Path :
Page 5 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Page 6 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Before performing each operation (one per line), complete/review the following fields :
The 1st operation, which automatically inherits the short text from the order, has to be completed
and reviewed.
If the list of operations refers to a standard routine (task list) in the system, it is possible to
search for an operation from the corresponding routine by following the path :
Extras Task list selection General task lists.
After you had selected the task list ("Selected" column), modify and/or confirm the work center to be
assigned, then select the required operations and transfer them into the operation list of the order.
Page 7 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Plant X Plant to which the work center belongs (Default values will be
valid)
Un Always ‘HR’
The key for calculation "Cckey » is defined to calculate the duration of the operation by applying
the following formula : Activity workload / number of resources.
Page 8 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Page 9 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
go to the bill of material, this is related to technical object for which a work order is
created.
If the work order includes several operations, you must indicate to which operation the components
are assigned :
Page 10 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Select the required components to perform operation by clicking on the box on the left side
of the screen line.
Page 11 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Recipient X Specifies the recipient for whom the material or the service is
destined.
If no bill of material is defined, or if all expected components are not integrated in the bill of materials :
Page 12 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Recipient X Specifies the recipient for whom the material or the service is
destined.
If you want to consult the stock level of a component, click on its number to go to the material
master data (Plant stock and Storage location stock from the material master data to get the stock
quantities). Then go to the following paths :
- Environment Stock overview (give quantities in all storage locations from all plants)
- Environment Stock/requirement list (give the MRP results and the available quantity at the
requirement date).
Page 13 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
The planned costs are automatically calculated by the system : operating costs from work
center (including the internal activities), value of components in stock, purchasing costs of external
services and classified components… .
Some subsidiaries make a consistency control (estimated costs > planned costs) of some value
categories.
The work can be released only if all estimated costs are defined.
Page 14 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
The estimated costs have to take into account the unpredictable or undefined costs that you
foresee. Once the order is released, you cannot exceed the estimated cost for each value category.
Should you need more items than your estimated cost for the same work after the approval you will
have to raise another work order (Sub-order).
Page 15 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Page 16 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
After having completed the operations, components, estimated costs and user status, you
save the modifications in the work order.
The system bottom line displays the following message : "Order xxxxxxx saved with notification
xxxxxxxx ".
Page 17 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
1.5 Display
The work orders are displayed by using the transaction IW33.
Page 18 of 19
Date : 15/06/20
Work Instruction
Doc : 480171018.doc
Business recommendations
Please note your work order number and use it to discuss with your hierarchy if needed or the next
person in the maintenance business process.
Page 19 of 19