This guideline gives an overall view of the main objectives, interactions and jobs involved in the master data
management describing the activities to be followed in order to prepare and update of all data relevant to plants,
functional units, and items that allow to performing maintenance activities detailed in Maintenance Management
System.
Documento riservato di proprietà di Eni S.p.A.- Divisione Exploration & Production. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is property of Eni S.p.A. – Exploration & Production Division. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. Document Class: Doc. N°. Rev. Page
MODIFICATION SHEET
Rev. 01 Revised “Glossary” and “Fig. 2.1.1: Workflow Map” in order to reflect the inclusion of the
“Minor Corrective Maintenance” type
Eni S.p.A. Document Class: Doc. N°. Rev. Page
FOREWORD
The presented maintenance flows are described according to the “Guidelines for organisational
charts” [SVI.DMS.GL.0001] and “Guidelines for job description” [SVI.DMS.GL.0002] of the new
Development Projects/Production Fields.
The Maintenance Management System is part of the Technology Management System (TMS).
Eni S.p.A. Document Class: Doc. N°. Rev. Page
TABLE OF CONTENTS
FOREWORD ............................................................................................................................... 2
ACRONYMS ............................................................................................................................... 5
JOB ACRONYMS ....................................................................................................................... 5
GLOSSARY ................................................................................................................................ 6
KEY TO WORKFLOW ................................................................................................................ 8
1. INTRODUCTION ............................................................................................................ 9
2. GUIDELINE OBJECTIVE AND SCOPE...................................................................... 10
2.1 OBJECTIVES ............................................................................................................... 10
2.2 SCOPE ......................................................................................................................... 12
2.3 APPLICABILITY ........................................................................................................... 12
3. REFERENCES ............................................................................................................. 13
4. WORKFLOW DIAGRAM ............................................................................................. 14
4.1 MASTER DATA MANAGEMENT WORKFLOW .......................................................... 14
4.2 PLANT SET-UP............................................................................................................ 15
4.3 MAINTENANCE ITEMS SET-UP ................................................................................. 16
4.4 BILL OF MATERIAL (B.O.M.) SET-UP ........................................................................ 17
5. WORKFLOW STEPS DESCRIPTION ......................................................................... 18
6. RESPONSIBILITY MATRIX SUMMARY..................................................................... 20
Eni S.p.A. Document Class: Doc. N°. Rev. Page
ACRONYMS
JOB ACRONYMS
GLOSSARY
KEY TO WORKFLOW
step code job acronym Stands for intellectual or manual process. In the upper-left
corner, the step code is placed, while in the upper right corner
Intellectual or manual
process the job acronym is placed. The box colour of step code and job
acronym depends on the main job involved (see table below).
step code job acronym Stands for a process that could be performed by CMMS means
or by CMMS itself (i.e. WO automatic generation). The box
CMMS process colour of step code and job acronym depends on the main job
involved (see table below).
step code
Stands for a macro-process. In the upper-left corner, the subject
macro-process
detailed procedure code is placed, while the upper right corner
is blanketed.
linked
procedure Stands for a reference link to the mentioned procedure
linked
step
Stands for a reference mark made for the step mentioned within
the on-going procedure
PSMG
GMG OFMG
MRSI
OMG FPCO
HSEQ
1. INTRODUCTION
This document supports a specific element of the Maintenance Management System. The
Maintenance Management System has been developed to provide a comprehensive and
structured set of knowledge and an integrated framework to manage maintenance activities,
thus ensuring effective and efficient use of the Company’s resources.
The set of procedures of Maintenance Management System describes in detail the steps to be
executed in order to perform relevant activities with the eventual support of CMMS.
This document is written as a guideline and therefore represents recommended format and
content rather than a mandatory, prescriptive procedure. Individual projects may deviate from,
or modify the typical contents described here, wherever such deviations are appropriate to fit
in the organizational structure.
This document is managed by O&M Project Team, all the changes of and contributions to this
document will be shared with and validated by O&M Project Team and a new release of this
document will be issued by O&M Project Team.
Eni S.p.A. Document Class: Doc. N°. Rev. Page
2.1 OBJECTIVES
On the overall maintenance workflow map, depicted on the next page, this guideline is
represented by the box with a bold outline.
Eni S.p.A. Document Class: Doc. N°. Rev. Page
start
Extraordinary
Maintenance
start
Modifications &
Improvements
Emergency?
no start
yes
yes finish
Work scheduling
yes
Maintenance
strategy review
Urgent Work
Request & Work Work execution
Order creation
Maintenance Continuous
Reporting improvement
start start
Data base
Maintenance Master data
Budget updating
management
Management
finish
start start
Global Maintenance
Maintenance Processes
Services
finish finish
2.2 SCOPE
The master data management procedure is oriented towards updating of the data bank against
the variations which took place in the plant (for example, installation/dismantlement of
equipment/components; purchase of an item belonging to new manufacturer or models,
updating of lists of materials, compilation of specification sheets etc.) that might be induced by
actions of improvement, modifications, extraordinary or corrective maintenances.
P&ID, suppliers’ material lists, data books, Company specifications etc. are to be considered
as inputs for master data management. The data to be entered into and the information have
been checked and validated before the system updating.
The output of master data management is an updated database containing all the plants,
facility functional units, maintenance items and proper information, that serve common basis
on which maintenance activities are performed as described in maintenance management
procedures.
This procedure does not take into account the insertions of considerable data amount,
originating from the implementation of new CMMS; the handling of such implementation or
updating activities is managed outside of the normal flows of maintenance management and
generally, it involves data configuration and migration.
The definition of master data must be performed according to Company guidelines and
specifications.
2.3 APPLICABILITY
The procedure described in this document is referred to the production phase of the facilities.
The present procedure shall be applied to any organization (external entity or internal
department) in charge of managing and executing Maintenance activities in any Production
Unit, onshore or offshore, fully owned by ENI E&P division or managed in joint venture with
other partners.
Therefore, this procedure utilizes the organization chart, the job titles and the responsibilities
and duties described for these Production Units in ENI documents: SVI.DMS.GL.0001
“Guideline for Organizational charts” and SVI.DMS.GL.0002 “Guideline for Job Descriptions”.
Eni S.p.A. Document Class: Doc. N°. Rev. Page
3. REFERENCES
4. WORKFLOW DIAGRAM
start
Procedure 4
Modifications &
Improvement 1.01 MESV
Plant
set-up
1.02.01
1.03
Maintenance Items
set-up
1.03.01
1.04
B.O.M. set-up
1.04.01
1.05 MESV
Evaluates the
opportunity to aggregate
items in functional groups
Yes
1.06 MESV
No Creates/Updates groups
of equipment
finish
Eni S.p.A. Document Class: Doc. N°. Rev. Page
1.02
Should the
Plant be recorded
or updated?
Yes
1.02.01 MESV
Identifies Plant
information on the basis
of documentation and
Company Specifications
1.02.02 MESV
1.02.03 MESV
1.03
Eni S.p.A. Document Class: Doc. N°. Rev. Page
1.03
Yes
1.03.01 MESV
1.03.02 MESV
Identifies the items
hierarchy on the basis of
Company specifications
and standards
1.03.03 MESV
1.03.04 MESV
Has the
data sheet template
been set?
No
1.03.05 MESV
1.03.06 MESV
Links the specification
sheet to the item. Enters
information on the basis of
documentation.
1.04
Eni S.p.A. Document Class: Doc. N°. Rev. Page
1.04
Should the
B.O.M. be
created ?
Yes
1.04.01 MESV
No
1.04.02 MESV
Creates the B.O.M.
according to Company
specifications and
standards
1.04.03 MESV
1.05
Eni S.p.A. Document Class: Doc. N°. Rev. Page
Workflow
Job title Step description
step code
1.01 MESV MESV identifies the need to update master data in order to
upgrade the occurred modification. The need to upgrade can arise
from improvements/modifications or extraordinary maintenance or
from installation/removal of items.
The updating can affect items, B.O.M. or specification sheet.
1.02.01 MESV MESV identifies the plant modifications and identifies the plant
information and functional units to be added, modified or removed.
1.02.03 MESV MESV updates the functional units database according to the
documentation and Company specifications and standards.
1.03.02 MESV MESV updates the items database according to items hierarchy
and system breakdown specification and Company specifications
and standards.
1.03.03 MESV Records the new items detailed information such as:
TAG
Equipment type;
Equipment description;
1.03.05 MESV The data sheet is a set of data, which contains technical
information, and data for the item.
The data sheet template is set for each item typology. (e.g. power
design, fluid handled, utilization of capacity, etc.)
The required data will referred to each relevant Item. If the data
sheet isn’t set, MESV will create a new template on the basis of
Company specifications.
1.03.06 MESV MESV links the specification sheet to the relevant item and
records all the data pertaining to the item on the basis of available
information (e.g. manufacturers/suppliers data), the engineering
documentation and according to all reference documents.
Eni S.p.A. Document Class: Doc. N°. Rev. Page
Workflow
Job title Step description
step code
1.04 - All B.O.M. relevant to new items shall be specified in data base.
1.04.01 MESV MESV identifies all spare parts related to new items on the basis
of relevant documentation (e.g. supplier/manufacturer, etc.).
B.O.M. is created in relevance to all the maintenance equipment
with which the maintenance strategy calls for the replacement of
its parts only, and not of the whole of the item.
1.04.02 MESV Creates new B.O.M. by recording all the spare parts, the number
of installed parts, the material records. Generally, the B.O.M. is
interfaced with material management system that gives detailed
information about the material.
Each B.O.M might be characterized by:
B.O.M. Code;
B.O.M description;
any other relevant information.
1.06 MESV Creates a group of items in CMMS or updates existing ones with
the new created items.
Eni S.p.A. Document Class: Doc. N°. Rev. Page
EVERY
OFMG
PSMG
DMSV
MPSV
MESV
CRSV
FPCO
EXEC
PPSV
MOSI
MRSI
MESI
POSI
OMG
GMG
code
step
Step description