Co product material master in costing need to tick co product check box.


After creating the source structure and use in header material master in costing 1
tab

Tick the co product check box and click on joint production tab

Maintain sequence and select the source structure created earlier


Double click on the line item
Select the assignment in the source structure and give the both header and co
product with percentage

Create the BOM for header material and put co product with negative value
Click on the item and make co product check box
Once complete the BOM like this run the standard cost estimation for header level
material we can found that co product will appear with negative value.

Like the same run for the co product also


Release std price. No bom required for co product. Price control is s for both.
While confirm the GR it will give the 2 materials to confirm