Electricity Bill for the month of April-20 Sub-Division: - MANALI SUB-DIVISION Sub-Division code: - 3331 Consumer Info Name SHTMBILLSON SO SHEDGOR Consumer Id 100000888437 Bill No. 200006357015 Address VILLOLD MA 3331 MANALI Legacy A/c no. 1333105887 Issue Date 09.04.2020 A 175131 Std.Supply Voltage(KV) 0.23 Last Reading Date 11.02.2020 Supply Voltage(KV) 0.23 Current Reading Date 08.04.2020 Metering Voltage(KV) Billing Cycle Bi-Monthly Tariff Type DS Cash/Draft Due Date 24.04.2020 Conn.Load(KW) 4.90 Cheque Due Date 22.04.2020 Meter Reading Unit B33310NM No. of Days 57
Meter Reading & Consumption
Meter No. New Old Difference Multiplier Adjustment/ Consumption Estimated units kWh main 29_401070_5887 3995.000 3855.000 140.000 1.000 0 140.000 Power Factor Concession unit Bill Particulars Particulars Base Value Rate Amount (Rs.) Energy Charge 140.000 kWh 3.95 (Rs./kWh) 553.00
Disturbing Load Penalty 0
Govt. Subsidy 140.000 kWh 2.40 (Rs./kWh) -336.00
Total Board Employee Consession 0
Fixed Charge 57 day 70.00 (Rs./month) 131.18 Meter Rent 57 day 15.00 (Rs./month) 28.11 Net Current SOP 376.29 Electricity Duty 553.00 (Rs.) 3.000 % 16.59 MC Tax 140.000 kWh 0.00 (Paisa) 0 Payment Info Security Deposit 250.00 SOP(Rs.) ED(Rs.) M.Tax(Rs.) Other(Rs.) Total (Rs.)
SD Paid Date 06.01.1997 Current Charges 376.29 16.59 0 392.88
Sundry $ 0 0 Last Paid amount(Rs.) Neg. Sundry$ 0 Last Paid Date Allowances Arrears(Nor) % 0 0 0.00 0 Arrears (Disputed) 0.00 0.00 0.00 0 Othrs/Adv/Int(Cr/Dr) 0.41- 0.41- Total Amount payable 376.29 16.59 0 0.41- 392.00 before Due Date
Late Payment Surch. 7.52
Total Amount Payable 383.81 16.59 0 0.41- 400.00 After Due Date
1 : Advance Amount0.41-Rs.has been Released
2 Inaccessible Meter(SBM) 3 Electricity Duty calculated on Energy Charge