Malataj Adana Kyari
Malataj Adana Kyari
Departmental
Head :-
Estimate framed in the Office of the Executive Engineer, Anand Irrigation
Division,Anand.for the probable expense that will be incurred in
Rs./- 1498070.00
General Description
As per attached sheet
The rates are adopted as per the Centralised MIC SOR for the year 2013-2014
ABSTRACT
Name of Constructing protection wall bet'n ch.750 m. to 850 m. on Adana Kyari lateral
work :- drain
Quantity Item Rate in Rs. Per Amount in Rs.
Item No-1
Excavation for foundation in all sorts of soil including
yellow sandy gravelly soils, soft & hard murrum etc. in
dry condition including depositing the excavated stuff in
uniform layers in banks or as and where directed etc.
complete for lead upto 500 m and all lift. (BY
MACHINERY)
Top Slab
1 Top Main steel 10 mm ø 155 mm c/c
1:1.5:3 (M-20)
WALL
1 Main steel 12 mm ø 155 mm c/c(out.)
Main steel 10 mm ø 200 mm c/c(Inn.)
2 Dist. steel 10 mm ø 200 mm c/c(Out. &in)
0.00
0.15 0.15
1:2:4 (M -15)
1:3:6 (M-10)
Bottom Slab
0.30 1 Top Main steel 12 mm ø 155 mm c/c
Bott. Main steel 10 mm ø 155 mm c/c
2.50
1.75
1.0 m high parapet
0.00
Road to
0.00
2.50
1.50
Drain
0.30
0.30
Profile wall section
Name of Work :-
0.30
R.L. 21.23
0.30
R.L. 20.93
D.B.L. 19.53
0.50 C.C. 1:2:4
1
0.30
0.90
R.L. 19.23 1
1.30
1
C.C. 1:3:6 0.30
R.L. 18.93
R.L. 18.63 0.30
1.60
0.15 1.00 0.30 0.30 0.15
1.90
SECTION OF PROTECTIONWALL
0.30
60.00
PLAN
Note: All Dimensions are in meter
Not to scale
0.30
R.L. 29.49
0.35
Top of Road/Bank R.L. 29.60 R.L. 29.14
110 mm dia.weep
holes 1.50 m c/c
2.05
0.15 1.45 0.30 0.30 0.15
2.35
SECTION OF PROTECTIONWALL
0.35
100.00
PLAN
Note: All Dimensions are in meter
Not to scale
Prepared By.. Deputy Executive Engineer
Drainage Sub-division
V.M.Patel A.A.E. Khambhat
m ø 155 mm c/c
mm ø 155 mm c/c
55 mm c/c(out.)
00 mm c/c(Inn.)
mm c/c(Out. &in)
ø 155 mm c/c
ø 155 mm c/c
teel 10 mm ø
c/c
0.7
20.23
0.9
ari lateral