CALCULATION SHEET 1 OF
DAFTAR JUMLAH PIPA, FITTING DAN ACCERORIS LINE PHE PAKET IV PHASE -1 NEW SKM YANG TERBUNGKUS ARMAFLEX
TABEL : 1 ###
BQ
NO MATERIAL SI TOTAL SAT KETERANGAN
SKM ANEX
A
1 PIPA BS Ø6" 32 32 LJR
2 PIPA BS Ø4" 117 117 LJR
3 PIPA BS Ø3" 77 10 87 LJR
4 PIPA BS Ø2-1/2" 27 27 LJR
5 PIPA BS Ø2" 26 26 LJR
6 PIPA BS Ø1-1/2" 6 58 64 LJR
7 PIPA BS Ø1-1/4" 5 5 LJR
8 PIPA BS Ø1" 71 17 88 LJR
9 PIPA BS Ø1/2" 1 1 LJR
Note
LINE RETURN 1 LAYER Thickness = 25 mm
LINE SUPPLY 2 LAYER Thickness = 50 mm
Ø<= 2" = menggunakan Armaflex 13mm
Ø> 2" Menggunakan Armaflex thk, 25mm
d
LAYER 3
d LAYER 2 ARMAFLEX THK. 25 MM
ARMAFLEX THK. 13
MM
LAYER 2
LAYER 1 Ø<= 2" ARMAFLEX THK. 13 MM
ARMAFLEX THK. 13
MM
LAYER 1
Ø<= 2" ARMAFLEX THK. 13 MM
Page 1 of 8
LUASAN INSULATION
L= ᶯ X ∆d X t
L = Luasan Armaflex
ᶯ= 3,14
∆d = Diameter ( pipa + Armaflex )
t = Panjang Pipa
C. KEBUTUHAN SS 204 THK.0,5 MM UNTUK KERJA TAMBAH MATERIAL FITTING & ACCESORIS
Line return = 90 M²
Line supply = 100 M²
Sub Total = 190 M²
Page 3 of 8
KEBUTUHAN ARMAFLEX PAKET IV NEW SKM - UNIT 5
3 MODIFIKASI SUPPORT
a. Man Power
1. SPV. 1 Personil 52 JAM
2. FITTER 1 Personil 52 JAM
3. HELPER 3 Personil 153 JAM
TOTAL
HARGA TOTAL KETERANGAN
10,000 2,000,000
10,000 3,000,000 MAT'L BY GG
18,750 975,000
12,750 663,000
9,375 1,434,375
750,000 3,000,000
500,000 500,000
11,572,375
IV PEMBONGKARAN LINE COMPRESSOR DAN BLOW GUN FILTER D1 FIRST FLOOR
A Man Power
1. SPV. 1 Personil 40 JAM
2. FITTER 1 Personil 40 JAM
3. HELPER 3 Personil 120 JAM
TOTAL
D1 FIRST FLOOR
18,750 750,000
12,750 510,000
9,375 1,125,000
500,000 500,000
2,885,000