You are on page 1of 8

July 15th 2022

Car Parking Canopy at IF Area

By : Operations Support – Camp Team


Background
• Employee personal vehicle has been approved to entering site
CPO
• Parking area is available but there is no car parking canopy
• Support Employee to bring their personal car to site, with car
parking canopy provided
• To protect the car during heavy rain and direct sunlight
• Potential efficiency on ground transportation usage during
commute from parking FO to IF
Scope Of Works
• Fabrication & Installation Car Parking Canopy at IF Area
• Several Area : In front of Admin A – B
• Cars Parking Capacity = 11 EA
• Construct by Steel Structure material.
Design 1 utilized Steel pipe 6” ex-Project
Design 2 steel structure all by Contractor Design Option 1

Design Option 2

2
Layout Plan – IF Area

1 2

Car Parking Canopy

Capacity Car Parking Canopy :


1 3 Cars 2 8 Cars TOTAL = 11 Cars

3
Design Option 1

Front View

3m
1.7 m
2.5 m

Perspective View Perspective View

60 cm

Side View Side View

4
Design Option 1
6m
0.5 m

Steel Pipe 3”
Steel Pipe 2”
0.6 m

3m

Steel Pipe 3”

Steel Pipe 6”

Steel Pipe 3” 1200mm 400mm


Steel Pipe 2”

Ø300mm

5
Design Option 2

Admin A–
Admin A – Admin
Admin B
B

Admin A – Admin B

1200mm 400mm Material :


1. Column – 4” Sch 40
2. Beam – 2” Sch 40
3. Rafter – 3” Sch 40
Ø300mm 4. Bracing – 2” Sch 40
5. Zinc. Roof 0.4mm thk

6
Back Up

7
Material Stock Steel Pipe 6” to be utilized

Location at Laydown Yard Warehouse