DCC 2073: CONTRACT & ESTIMATING

CHAPTER 7: QUANTITY MEASUREMENT


(PILING WORKS)
RUKINAH SAMUING
POLITEKNIK KOTA KINABALU
JAB. KEJURUTERAAN AWAM
COURSE LEARNING OUTCOME:-
2

Upon completion of this course, students should be able to:


CLO 2:
Solve problems systematically for preliminary estimating
method and quantity measurement in relation to project
estimation (C3, PLO 2)
CLO 4:
Adhere effectively the value of entrepreneurial skills
through quantity measurement and built-up rate in
relation to Public Work Department practice (A3, PLO 9)
PURPOSE OF PILING WORK
3

 provide commercial and residential foundation


support
TYPES OF PILING
4

• DRIVEN PILE
1. PRE CAST CONCRETE
2. STEEL
3. TIMBER

• DRILLED PILE
1. INSITU CONCRETE PILE
TIMBER PILES
5
STEEL PILE
6
CONCRETE PILE
7
LIST OF WORKS
8
1. Bringing in & removing out plant - item
2. Maintaining plant - item
3. Initial pile - No.
4. Driven depth / length - m
5. Extension pile - No.
6. Driven depth for each extension pile - m
7. Cut-off top pile - No.
8. Prepare pile head / pile cap - No.
9. Load test - item
DRAWING
9

PILE
GROUP
GRID
EXAMPLE
10
SPECIFICATION
11

• 1. All pile should be in 350mm in diameter


• 2. Supply length of pile shall be ;
• i. Starter : 6.00 m long
• ii. Extension : 3.00 m long & 6.00 m long
• 3. Estimated penetration depth is 15 meter
• 4. Working load : 70 tones per pile
• 5. Allow 2 no. testing for each group and single pile
• 6. The test load to twice working load shall be
maintained for 48 hours
• 7. Legend ; P1 – pile cape with 1 point, P2 – pile cape
with 2 point, P3 – pile cape with 3 point,
• P4 – pile cape with 4 point & P5 – pile cape with 5 point
TAKING OFF LIST
12

1. Bringing in & removing out plant - item


2. Maintaining plant - item
3. Initial pile - No.
4. Driven depth / length - m
5. Extension pile - No.
6. Driven depth for each extension pile - m
• 3.00 m long
• 6.00 m log
7. Cut-off top pile - No.
8. Prepare pile head / pile cap - No.
9. Load test - item
13
14
15
16
17
18
19
20
21
EXERCISE
22

By referring to the information given and piling layout


plan, compute taking off quantities for the following:-
i. Supply of starter pile.
ii. Supply of extension piles.
iii. Driven depth of pile
iv. Cut off piles.
23
24