This document provides specifications for pre-cast reinforced concrete piles to be used in a 14 unit terrace house project in Batu Pahat, Johor. It details requirements such as the pile dimensions, estimated driven depths, working loads, and load testing. A taking-off list is also included to quantify aspects of the piling works. Finally, a schedule outlines the number and locations of different pile cap types needed.
This document provides specifications for pre-cast reinforced concrete piles to be used in a 14 unit terrace house project in Batu Pahat, Johor. It details requirements such as the pile dimensions, estimated driven depths, working loads, and load testing. A taking-off list is also included to quantify aspects of the piling works. Finally, a schedule outlines the number and locations of different pile cap types needed.
This document provides specifications for pre-cast reinforced concrete piles to be used in a 14 unit terrace house project in Batu Pahat, Johor. It details requirements such as the pile dimensions, estimated driven depths, working loads, and load testing. A taking-off list is also included to quantify aspects of the piling works. Finally, a schedule outlines the number and locations of different pile cap types needed.
At Batu Pahat, Johor Specification notes on Pre-cast reinforced concrete piles to be read together with the drawing 1. All piles shall be of cross sectional 200mm x 200mm 2. Supply of lengths shall be: Starter pile – 6.00m long Extension pile – 3.00m and 6.00m long 3. Estimated driven/penetration depth: 14.00 m 4. No trial pile is required 5. All pile heads to be cut off by means of hydraulic breaker 6. Working load: 45 tonnes/ pile 7. Allow 4 no. of random load tests: 1 no. on 3 pile group 1 no. on 2 pile group 2 nos. on a single pile group 8. Tests shall be carried out in sequence with group testing to be carried out first. Test load to twice working load shall be maintained for 24 hours 9. Legend: P1: pile cap with 1 point P2: pile cap with 2 points P3: pile cap with 3 points P4: pile cap with 4 points P5: pile cap with 5 points Pre-cast reinforced concrete piles Taking-off list: 1. Bringing in and removing plant – ITEM 2. Maintaining plant on site – ITEM 3. Initial piles – No 4. Driven depth – m 5. Pile extension – no 6. Extension piles n.e. 3.00m long – m 7. Extension piles exceeding 3.00m long –m 8. Cut-off pile heads – no 9. Prepare pile heads – no 10.Preliminary load tests – ITEM 11.Second load tests – ITEM 12.Third load tests – ITEM Schedule of pile caps