Geotechnical Investigation

Name of Work : -
Soil Investigation Work at Sewage Project at Nasrullaganj M.P.

Location:- 4.2MLD STP & IPS Site, Under Sewage Project at Nasrullaganj

Client :- Madhya Pradesh Urban Development Company Limited (MPUDC)

Consultant :- WAPCOS Ltd , Bhopal

Contractor :- M/s. Abeinsa Infraestructuras Medio Ambiente S. A. (Abeima)


And M/s Bhugan Infracon Pvt. Ltd. (JV) Mumbai. (MH)

Report No. BILIPL/PIPL/2018-19/02 Revision:- 00

Beacon Infralab Ind ia Pvt. Ltd. (N ABL Accredit ed Lab)

Add- A-156, Rohit Nagar Phone: 0755-4064360


Extn, Phase-2,Part-3,Opp. Fax: 0755-4064360
Sagar Public School, Bhopal E-mail:
-26 contact@beaconinfralab.com

On these beams, we’re building dreams


Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
Contents

S. No. Particulars Page No.

1 Introduction. 2

2 Field Work 2-3

3 Laboratory Work 3-4

4 Computation of Safe Bearing Capacity. 5-6

5 Conclusion & Recommendation. 7-8

6 References. 8

7 Sewage Treatment Plant at Ward No. 6, Miya Mohalla 9-37

9 Sewage Pump Station at Ward No. 2 38-42

10 Annexure 43-58

11 Site Visit Photos By PMC 59-60

1
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
1 INTRODUCTION :
M/s. Abeinsa Infraestructuras Medio Ambiente S. A. (Abeima) And M/s Bhugan
Infracon Pvt. Ltd. (JV) Mumbai. (MH) , have been awarded the Sewage Project at Nasrullaganj
M.P. M/s. Abeinsa Infraestructuras Medio Ambiente S. A. (Abeima) And M/s Bhugan Infracon
Pvt. Ltd. (JV) Mumbai has been appoint to M/S Beacon Infralab India Pvt. Ltd. to Undertake the
work of Geotechnical Investigation. The present report is about the results of one bore log
exploration at,
 4.2 MLD STP at Nasrullaganj (07 No. Bore Log)
 IPS at Nasrullaganj (01 No. Bore Log)
Scope of work for the present investigation includes boring at specified locations Excavation at
Site. During boring collection of disturbed/ undisturbed/ Core samples, carrying out field (SPT)
tests and laboratory tests on undisturbed, disturbed soil sample & core samples and submission
of report including recommendation for design of foundation for the proposed structure .The
geotechnical engineer and geologist of BILIPL have collected the soil samples from the
boreholes along with the other filed data. The location of drilling the boreholes was provided by
the officials of the client. The drilling, sample collections and Standard Penetration test was
performed in the presence of officials of the client.
2. Field Work
 Boring:
Boring was done with the combination of rotary drilling technique. Flush joined steel casing
pipes were provided (when required) to prevent side collapse. The borehole depths & description
of Soil. N values from SPT and the depth at which ground water was encountered are shown in
table-1A to 5A of this report & test result of bore hole is shown in table-1B to 5B.
 Sampling:
Undisturbed Samples, disturbed samples & core samples were collected at regular intervals. The
disturbed samples including penetrometer samples were collected and stored in polythene bags
after proper labeling. Undisturbed samples were collected in 100mm. diameter sample tubes. The
area ratio of each tube was kept within 14% to minimize possible disturbances during sampling
the tubes were scaled with paraffin wax at both ends, labeled depth wise and dispatched to the
laboratory for testing. The disturbed samples were collected from the cutting shoe of sample
tubes & split spoon sampler. Core samples were collected by core – catcher and stored in
polythene bags/core box after proper labeling.

2
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
 Standard penetration Test:-

Standard penetration tests were done within each borehole at suitable interval of depth shown in
the bore log data sheets. The tests were done with the standard split-spoon sampler as per IS:
2131. The N values were obtained by counting the number of blows required to drive the spoon
30cm in soil.
3. LABORATORY TESTS :
The soil samples were extracted from 100mm. diameter sampling tubes in the laboratory by
pushing out the soil core in the extractor frame with the help of a jack the core was jacked out in
a direction the corresponded to the soil movement within the tube during sampling. The
following test was carried out on soil samples collected from the boreholes:
a) Bulk Density
b) Natural Moisture Content.
c) Atterberg Limits
d) Specific Gravity.
e) Grain Size analysis.
f) Consolidation test.
g) Direct Shear Test.
h) Triaxial Test.
i) Swelling Pressure Test

For triaxial test 38mm. diameter x 76 mm. long specimens were obtained by jacking out
the soil. Core into the walled brass tubes, each having a wall thickness of 0.8 mm. The inside of
the tube was coated with a thin of silicon oil. To obtain specimens for consolidation test, the
odometer ring was placed on the trimmed horizontal face of the soil within the sampling tube and
the soil within the spatula as the ring was gently pushed into the soil the ring with the soil was
then removed by cutting across the soil core with help of a piano wire saw.
The laboratory tests as tabulated below were done to ascertain the engineering properties of the
subsoil and necessary data required for design of the foundation. In addition grain size
distribution & Atterberg Limits was carried out on samples collected from the shoe of SPT
sampler.
 Atterberg limits and natural water content:

3
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
Liquid limit. Plastic limit and natural water content of the silty clay/clayey silts. Samples were
determined (a) to classify the soil the M.I.T. classification system and (b) qualitatively asses their
constancy and compressibility of the soil samples.
 Undrained triaxial test:
These tests were done on the silty clay /clayey silt samples to determine their undrained shear
strength. The cell pressure employed in the triaxial test was 0.5 1.0 and 1.5 kg/cm2. Then
samples were tested under quick condition at a rate of 1.25 mm/min.
 Grain size analysis :
The grain-size distribution of some representative samples were determined from sieve analysis /
combined sieve and hydrometer analysis. The grain size distribution curve is shown in Fig.
 Consolidation test:
Consolidation tests were run in floating ring type odometer. Under standard load increment.
Starting from 0.05 kg/cm2 to 8.0 kg/cm2 in general the soil samples were tested to represent in
relevant silty clay/clayey silt strata encountered.
 Direct shear test :
These tests were done on the sandy soil to determine the angle of shearing resistance. The
normal stress uses employed in the test were 0.5. 1.0 &1.5 kg/cm2
 Swelling Pressure Test
In case of soil having swilling properties swelling pressure test is conducted on the sample
collected from trial pits.

In case of rock is encountered at bore hole following tests were conducted on rock samples
collected from the site:
a) Specific Gravity
b) Water absorption
c) Crushing strength.

Core samples were collected from the rock strata. Diameter of the samples is 55mm. cylindrical
samples of length 110mm were prepared from these samples. Bulk density of these samples was
determined by taking weight of the cylindrical samples. Before determination of crushing
strength samples were saturated in water for 24 hours.
4. COMPUTATIONS OF SAFE BEARING CAPACITY

4
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
(I) BASED ON SHEAR CONSIDERATION

The various kinds of shear tests are there but here we have performed the unconsolidated-
undrained (UU) tests were performed to get shear parameters for all samples. The Safe Bearing
Capacity is calculated as per IS: 6403- 1981 (determination of bearing capacity of shallow
foundations). For local and general shear failure the net safe bearing capacity is given as follows:
Qns = [C Nc Sc dc ic+q (Nq-1) Sq dq iq+ ½ B γ Nγ dγ iγ W]/F (In case of General shear
failure)
Qns = [2/3 C N’c Sc dc ic+q (N’q-1) Sq dq iq+ ½ B γ N’γ Sγdγ iγ W]/F (In case of local shear
failure)
Where qns = Net Safe Bearing Capacity
C = Cohesion (for Non cohesive material C = 0)
Ǿ = Angle of internal friction
Ǿ’ = tan-1(0.67 tan (Ø)) for local shear failure
γ = Average density of over burden
Nc,Nq,Nγ = Bearing Capacity factors for General Shear Failure
N’c,N’q,N’γ = Bearing Capacity factors for Local Shear Failure
Sc,Sq,Sγ = Shape factors
dc ,dq ,dγ = depth factors
ic ,iq ,iγ = inclination factors ( 1 in the case of vertical loads)
q = Effective surcharge at depth of” X” Mt below ground level.
W = Water Table correction factor is ½ (When WT is at base of footing)
B = Width of footing in Mts. (3.0x 3.0 m assumed)
F = Factor of safety considered as 2.50
The tests for determination of shear parameters are performed on undisturbed specimen.
The samplers were drawn in the boreholes and the undisturbed samples were collected wherever
possible and on these samples Triaxial Compression Tests were conducted.

(II) BASED ON SETTLEMENT CRIETRA

(a) Immediate settlement:

5
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
The elastic or immediate settlement:- According to Terzaghi (1943)

Si = qB ( 1-μ2)If/E

q = net foundation pressure


μ = poisson's ratio
E = Young's Modulus of Elasticity
If = influence Factor
B=Width of Foundation (Assume 3.0m)

(b) Consolidation Settlement

The settlement due to consolidation may be obtained as follows


Sc = ( Cc* Ho/1+eo)* log (po + ∆p)/po
Cc = Compression index
eo = Initial void Ratio
Ho = Thickness of clay strata
po = Initial Pressure
∆p = Pressure increment

Total Settlement= Immediate settlement (Si )+ Consolidation Settlement (Sc)

As per the clause 9.5 of IS 8009 part I, 1976 reaffirmed in 1998 the total settlement is to be
reduced for depth factor as found from Fig. 12 pp 22 of IS 8009 .

6
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
5.0 CONCLUSION & RECOMMENDATION

 Bearing capacity of shallow foundation at proposed sites is determined, on the basis of


field test, collection of samples from the field, conduction pertinent laboratory tests,
compiling & analyzing data as per various codal guidelines. Recommended bearing
capacity shall be valid only for foundations constructed in vicinity of boreholes of site.
On the basis of investigation, recommended foundation depth and corresponding safe
bearing capacity is provided in the Table A.
 The allowable settlement is taken as per IS 1904-1986.
 No foundation should be laid on Black Cotton Soil.
 IS: 1904-1986 recommendation shall be followed for the site located at sloping ground.
 Necessary precaution & arrangement of dewatering and shoring shall be taken at site
during excavation of foundation.
TABLE – A

S. Foundation Depth Recommended Safe Bearing Capacity Strata at


No. No. From Foundation
GL Based on Shear Based on Recommended Level
Consideration Settlement SBC

2.0m Foundation not Preferable Before 3.0m as BC Soil Strata


BH-1
3.0m 143.0 kPa 120.0 kPa 120.0 kPa
1.
4.2MLD STP
Site, Ward 4.0m 154.0 kPa 140.0 kPa 140.0 kPa
No. 6, Miya Clayey Soil (CI)
5.0m 165.0 kPa 160.0 kPa 160.0 kPa
Mohalla
6.0m 174.0 kPa 170.0 kPa 170.0 kPa
2.0m Foundation not Preferable Before 3.0m as BC Soil Strata
BH-2 4.2MLD 3.0m 135.0 kPa 110.0 kPa 110.0 kPa
2. STP Site, 4.0m 146.0 kPa 130.0 kPa 130.0 kPa
Ward No. 6, Clayey Soil (CI)
Miya Mohalla 5.0m 157.0 kPa 150.0 kPa 150.0 kPa
6.0m 167.0 kPa 180.0 kPa 180.0 kPa

7
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

2.0m Foundation not Preferable Before 3.0m as High Plasticity Strata


BH-3 4.2MLD 3.0m 129.0 kPa 120.0 kPa 120.0 kPa
3.
STP Site, 4.0m 139.0 kPa 140.0 kPa 140.0 kPa
Ward No. 6, Clayey Soil (CI)
Miya Mohalla 5.0m 149.0 kPa 160.0 kPa 160.0 kPa
6.0m 159.0 kPa 190.0 kPa 190.0 kPa
2.0m Foundation not Preferable Before 3.0m as High Plasticity Strata
BH-4 4.2MLD 3.0m 145.0 kPa 110.0 kPa 110.0 kPa
4.
STP Site, 4.0m 155.0 kPa 130.0 kPa 130.0 kPa
Ward No. 6, Clayey Soil (CI)
Miya Mohalla 5.0m 165.0 kPa 150.0 kPa 150.0 kPa
6.0m 176.0 kPa 170.0 kPa 170.0 kPa
2.0m Foundation not Preferable Before 3.0m as High Plasticity Strata
BH-5 4.2MLD 3.0m 151.0 kPa 120.0 kPa 120.0 kPa
5.
STP Site, 4.0m 164.0 kPa 140.0 kPa 140.0 kPa
Ward No. 6, Clayey Soil (CI)
Miya Mohalla 5.0m 175.0 kPa 160.0 kPa 160.0 kPa
6.0m 188.0 kPa 180.0 kPa 180.0 kPa
2.0m Foundation not Preferable Before 3.0m as High Plasticity Strata
BH-6 4.2MLD 3.0m 157.0 kPa 120.0 kPa 120.0 kPa
6.
STP Site, 4.0m 170.0 kPa 140.0 kPa 140.0 kPa
Ward No. 6, Clayey Soil (CI)
Miya Mohalla 5.0m 182.0 kPa 160.0 kPa 160.0 kPa
6.0m 195.0 kPa 180.0 kPa 180.0 kPa
2.0m Foundation not Preferable Before 3.0m as High Plasticity Strata
BH-7 4.2MLD 3.0m 145.0 kPa 110.0 kPa 110.0 kPa
7.
STP Site, 4.0m 155.0 kPa 130.0 kPa 130.0 kPa
Ward No. 6, Clayey Soil (CI)
Miya Mohalla 5.0m 165.0 kPa 150.0 kPa 150.0 kPa
6.0m 176.0 kPa 170.0 kPa 170.0 kPa

8
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

2.0m Foundation not Preferable Before 3.0m as High Plasticity Strata


3.0m 160.0 kPa 120.0 kPa 120.0 kPa
8.
BH-1 IPS 4.0m 174.0 kPa 140.0 kPa 140.0 kPa
Ward No. 2 Clayey Soil (CI)
5.0m 186.0 kPa 160.0 kPa 160.0 kPa
6.0m 200.0 kPa 180.0 kPa 180.0 kPa

FOR BEACON INFRALAB INDIA PVT. LTD.

AUTHORAISED SIGNATORY

CLOSURE:
We appreciate the opportunity given to us to submit this report. This presented report is based on
observations and tests on samples collected from the boreholes. In case any difference is
noticed in the field subsoil strata and reported subsoil strata during excavation of
foundation, please contact us before proceeding with further construction.

9
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
REFERENCES

S.NO. IS CODE NO. TITLE OF CODE


1 IS 1892:1979 Code Practice for subsurface investigation of foundations
2 IS 2131:1981 Method of Standard Penetration Test for soils
3 IS 2132:1986 Code practice for thin walled sampling of soils
4 IS 2720(Various parts) Methods for test of soils
5 IS 4078:1980 Code practice for indexing and storage of drill cores

6 IS 4464:1985 Code practice for presentation of drilling information and core


description in foundation investigation
7 IS 6935:1973 Method of determination of water level in bore hole
8 IS 6926:1976 Diamond Core Drilling—Code of Practice

9 IS 6403:1981 Code of practice for determination of Safe Bearing Capacity of


shallow foundations
10 IS:8009 (Part-I) -1976 Code of practice for calculation of settlement for Foundations
11 IS: 1904-1986 Code of practice for subsurface investigation for foundation
Code of practice for design and construction of shallow foundation
12 IS: 12070-1987
on rocks
13 IS 8764 : 1998 Method For Determination Of Point Load Strength Index Of Rocks

10
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

9
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

TABLE –1A, BORELOG


Sewage Treatment Plant at Ward
Location : Borehole No. : 01
No. 6, Miya Mohalla BH-1 (4.2MLD)
Ground Level : 100.0M Method of Boring : Rotary Drill
Depth of Boring : 10.0m Water Table : Nil
Date of Started : 30.12.2018 Date of Completed : 31.12.2018

Time taken for boring for

Designation (RQD) %
Dia of Bore / Casing

% Core Recovery
Drill Depth

Soil Classification
each 30cm in minutes
DESCRIPTION

Color of Returned
SAMPLES
(m)

Rock Quality
OF STRATA

Used (mm)
SPT ‘N’

Water
(Description of core
Value / rock type color grain
Remarks size texture mineral
From To Type Depth composition degree
of weathering)

0 0.5 DS-1 0.5 - 150 50 Nil Nil BC Soil CH Black

0.5 1.5 SPT-1 1.0-1.45 3,4,4=8 150 55 Nil Nil ----------do--------- --do-- --do--

1.5 3.0 SPT-2 1.5-1.95 4,5,6=11 150 55 Nil Nil ----------do--------- --do-- --do--

Clayey Soil of
UDS-1 3.0-3.5 - 150 55 Nil Nil Intermediated CI Yellow
3.0 4.5 Plasticity

SPT-3 3.5-3.95 6,7,9=16 150 55 Nil Nil ----------do--------- --do-- --do--

4.5 6.0 SPT-4 4.5-4.95 7,9,11=20 150 55 Nil Nil ----------do--------- --do-- --do--

6.0 7.5 SPT-5 6.0-6.45 8,10,13=23 150 55 Nil Nil ----------do--------- --do-- --do--

7.5 9.0 SPT-6 7.5-7.95 10,12,15=27 150 55 Nil Nil ----------do--------- --do-- --do--

9.0 10.0 SPT-7 9.0-9.45 12,14,16=30 150 55 Nil Nil ----------do--------- --do-- --do--

DS : Disturbed Sample
UDS : Undisturbed Sample
SPT : Standard Penetration Test

10
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

11
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
TABLE–1B, SOIL/ROCK TEST RESULTS FOR
BH -1 (4.2MLD STP at Ward No. 6, Miya Mohalla)

SHEARING
STRENGTH
Mechanical Analysis Consistency Limit

Natural Moisture Content %


Soil/ Rock Classification CHARACTE
RISTIC

SPECIFIC GRAVITY
Bulk Density (g/cc)
Type of Sample

COMPRESSION
INDEX CC
ANGLE OF SHEARING
Depth
S. No

COHESON ‘C’

RESISTANCE
2
IN kg/cm
Gravel %

Sand%

P.L. %
Clay%

L.L %

P.I.%
1 DS-1 0.5 CH - - 0 5 Silt%
47 48 56 27 29 - - - -

2 SPT-2 1.5 CH - - 2 8 44 46 54 26 28 - - - -

0
3 UDS-1 3.0 CI 15 1.78 3 15 40 42 49 26 23 2.69 0.46 9 0.265

4 SPT-4 4.5 CI - - 10 33 28 29 42 22 20 - - - -

5 SPT-5 6.0 CI - - 12 37 24 27 41 21 20 - - - -

12
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

13
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

TABLE –2A, BORELOG


Sewage Treatment Plant at Ward
Location : Borehole No. : 02
No. 6, Miya Mohalla BH-2 (4.2MLD)
Ground Level : 100.0M Method of Boring : Rotary Drill
Depth of Boring : 10.0m Water Table : Nil
Date of Started : 31.12.2018 Date of Completed : 01.01.2019

Time taken for boring for

Designation (RQD) %
Dia of Bore / Casing

% Core Recovery
Drill Depth

Soil Classification
each 30cm in minutes
DESCRIPTION

Color of Returned
SAMPLES
(m)

Rock Quality
OF STRATA

Used (mm)
SPT ‘N’

Water
(Description of core
Value / rock type color grain
Remarks size texture mineral
From To Type Depth composition degree
of weathering)

0 0.5 DS-1 0.5 - 150 50 Nil Nil BC Soil CH Black

0.5 1.5 SPT-1 1.0-1.45 3,3,4=7 150 55 Nil Nil ----------do--------- --do-- --do--

1.5 2.8 SPT-2 1.5-1.95 3,4,5=9 150 55 Nil Nil ----------do--------- --do-- --do--

Clayey Soil of
SPT-3 3.0-3.5 5,6,7=13 150 55 Nil Nil Intermediated CI Yellow
2.8 4.5 Plasticity

UDS-1 3.5-3.95 - 150 55 Nil Nil ----------do--------- --do-- --do--

4.5 6.0 SPT-4 4.5-4.95 7,8,10=18 150 55 Nil Nil ----------do--------- --do-- --do--

6.0 7.5 SPT-5 6.0-6.45 8,9,12=21 150 55 Nil Nil ----------do--------- --do-- --do--

7.5 9.0 SPT-6 7.5-7.95 9,11,15=26 150 55 Nil Nil ----------do--------- --do-- --do--

9.0 10.0 SPT-7 9.0-9.45 11,13,15=28 150 55 Nil Nil ----------do--------- --do-- --do--

DS : Disturbed Sample
UDS : Undisturbed Sample
SPT : Standard Penetration Test

14
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

15
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
TABLE–2B, SOIL/ROCK TEST RESULTS FOR
BH -2 (4.2MLD STP at Ward No. 6, Miya Mohalla)

SHEARING
STRENGTH
Mechanical Analysis Consistency Limit

Natural Moisture Content %


Soil/ Rock Classification CHARACTE
RISTIC

SPECIFIC GRAVITY
Bulk Density (g/cc)
Type of Sample

COMPRESSION
INDEX CC
ANGLE OF SHEARING
Depth
S. No

COHESON ‘C’

RESISTANCE
2
IN kg/cm
Gravel %

Sand%

P.L. %
Clay%

L.L %

P.I.%
1 DS-1 0.5 CH - - 2 9 Silt%
44 45 58 26 32 - - - -

2 SPT-2 1.5 CH - - 1 13 41 45 54 28 26 - - - -

0
3 UDS-1 3.0 CI 11 1.79 3 18 37 42 48 25 23 2.68 0.40 11 0.232

4 SPT-4 4.5 CI - - 1 23 36 40 49 25 24 - - - -

5 SPT-5 6.0 CI - - 2 31 33 34 46 24 22 - - - -

16
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

17
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

TABLE –3A, BORELOG


Sewage Treatment Plant at Ward
Location : Borehole No. : 03
No. 6, Miya Mohalla BH-3 (4.2MLD)
Ground Level : 100.0M Method of Boring : Rotary Drill
Depth of Boring : 10.0m Water Table : Nil
Date of Started : 02.01.2019 Date of Completed : 03.01.2019

Time taken for boring for

Designation (RQD) %
Dia of Bore / Casing

% Core Recovery
Drill Depth

Soil Classification
each 30cm in minutes
DESCRIPTION

Color of Returned
SAMPLES
(m)

Rock Quality
OF STRATA

Used (mm)
SPT ‘N’

Water
(Description of core
Value / rock type color grain
Remarks size texture mineral
From To Type Depth composition degree
of weathering)

0 0.5 DS-1 0.5 - 150 50 Nil Nil BC Soil CH Black

0.5 1.5 SPT-1 1.0-1.45 3,4,4=8 150 55 Nil Nil ----------do--------- --do-- --do--

1.5 3.0 SPT-2 1.5-1.95 4,4,6=11 150 55 Nil Nil ----------do--------- --do-- --do--

Clayey Soil of
UDS-1 3.0-3.5 - 150 55 Nil Nil Intermediated CI Yellow
3.0 4.5 Plasticity

SPT-3 3.0-3.45 5,7,8=15 150 55 Nil Nil ----------do--------- --do-- --do--

4.5 6.0 SPT-4 4.5-4.95 7,7,11=18 150 55 Nil Nil ----------do--------- --do-- --do--

6.0 7.5 SPT-5 6.0-6.45 8,10,12=22 150 55 Nil Nil ----------do--------- --do-- --do--

7.5 9.0 SPT-6 7.5-7.95 9,13,15=28 150 55 Nil Nil ----------do--------- --do-- --do--

9.0 10.0 SPT-7 9.0-9.45 10,14,16=30 150 55 Nil Nil ----------do--------- --do-- --do--

DS : Disturbed Sample
UDS : Undisturbed Sample
SPT : Standard Penetration Test

18
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

19
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
TABLE–3B, SOIL/ROCK TEST RESULTS FOR
BH-3 (4.2MLD STP at Ward No. 6, Miya Mohalla)

SHEARING
STRENGTH
Mechanical Analysis Consistency Limit

Natural Moisture Content %


Soil/ Rock Classification CHARACTE
RISTIC

SPECIFIC GRAVITY
Bulk Density (g/cc)
Type of Sample

COMPRESSION
INDEX CC
ANGLE OF SHEARING
Depth
S. No

COHESON ‘C’

RESISTANCE
2
IN kg/cm
Gravel %

Sand%

P.L. %
Clay%

L.L %

P.I.%
1 DS-1 0.5 CH - - 1 9 Silt%
44 46 55 27 28 - - - -

2 SPT-2 1.5 CH - - 2 11 43 44 54 28 26 - - - -

0
3 UDS-1 3.0 CI 14 1.77 7 14 39 40 46 24 22 2.66 0.38 10 0.199

4 SPT-4 4.5 CI - - 2 22 36 40 44 23 21 - - - -

5 SPT-5 6.0 CI - - 3 26 38 33 42 22 20 - - - -

20
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

21
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

TABLE –4A, BORELOG


Sewage Treatment Plant at Ward
Location : Borehole No. : 04
No. 6, Miya Mohalla BH-4 (4.2MLD)
Ground Level : 100.0M Method of Boring : Rotary Drill
Depth of Boring : 10.0m Water Table : Nil
Date of Started : 02.01.2019 Date of Completed : 03.01.2019

Time taken for boring for

Designation (RQD) %
Dia of Bore / Casing

% Core Recovery
Drill Depth

Soil Classification
each 30cm in minutes
DESCRIPTION

Color of Returned
SAMPLES
(m)

Rock Quality
OF STRATA

Used (mm)
SPT ‘N’

Water
(Description of core
Value / rock type color grain
Remarks size texture mineral
From To Type Depth composition degree
of weathering)

0 0.5 DS-1 0.5 - 150 50 Nil Nil BC Soil CH Black

0.5 1.5 SPT-1 1.0-1.45 3,4,5=9 150 55 Nil Nil ----------do--------- --do-- --do--

1.5 2.9 SPT-2 1.5-1.95 5,5,6=11 150 55 Nil Nil ----------do--------- --do-- --do--

Clayey Soil of
UDS-1 3.0-3.5 - 150 55 Nil Nil Intermediated CI Yellow
2.9 4.5 Plasticity

SPT-3 3.5-3.95 6,7,10=17 150 55 Nil Nil ----------do--------- --do-- --do--

4.5 6.0 SPT-4 4.5-4.95 7,8,11=19 150 55 Nil Nil ----------do--------- --do-- --do--

6.0 7.5 SPT-5 6.0-6.45 8,11,13=24 150 55 Nil Nil ----------do--------- --do-- --do--

7.5 9.0 SPT-6 7.5-7.95 10,12,13=25 150 55 Nil Nil ----------do--------- --do-- --do--

9.0 10.0 SPT-7 9.0-9.45 12,14,15=29 150 55 Nil Nil ----------do--------- --do-- --do--

DS : Disturbed Sample
UDS : Undisturbed Sample
SPT : Standard Penetration Test

22
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

23
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
TABLE–4B, SOIL/ROCK TEST RESULTS FOR
BH-4 (4.2MLD STP at Ward No. 6, Miya Mohalla)

SHEARING
STRENGTH
Mechanical Analysis Consistency Limit

Natural Moisture Content %


CHARACTE
Soil/ Rock Classification
RISTIC

SPECIFIC GRAVITY
Bulk Density (g/cc)
Type of Sample

COMPRESSION
INDEX CC
ANGLE OF SHEARING
Depth
S. No

COHESON ‘C’

RESISTANCE
2
IN kg/cm
Gravel %

Sand%

P.L. %
Clay%

L.L %

P.I.%
Silt%
1 DS-1 0.5 CH - - 1 7 44 48 52 24 28 - - - -

2 SPT-2 1.5 CH - - 3 11 41 45 52 25 27 - - - -

0
3 UDS-1 3.0 CI 9 1.75 2 15 40 43 50 26 24 2.67 0.50 8 0.265

4 SPT-4 4.5 CI - - 1 23 36 40 46 26 20 - - - -

5 SPT-5 6.0 CI - - 2 28 33 37 42 23 19 - - - -

24
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

25
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

TABLE –5A, BORELOG


Sewage Treatment Plant at Ward
Location : Borehole No. : 05
No. 6, Miya Mohalla BH-5 (4.2MLD)
Ground Level : 100.0M Method of Boring : Rotary Drill
Depth of Boring : 10.0m Water Table : Nil
Date of Started : 02.01.2019 Date of Completed : 03.01.2019

Time taken for boring for

Designation (RQD) %
Dia of Bore / Casing

% Core Recovery
Drill Depth

Soil Classification
each 30cm in minutes
DESCRIPTION

Color of Returned
SAMPLES
(m)

Rock Quality
OF STRATA

Used (mm)
SPT ‘N’

Water
(Description of core
Value / rock type color grain
Remarks size texture mineral
From To Type Depth composition degree
of weathering)

0 0.5 DS-1 0.5 - 150 50 Nil Nil BC Soil CH Black

0.5 1.5 SPT-1 1.0-1.45 3,4,4=8 150 55 Nil Nil ----------do--------- --do-- --do--

1.5 3.0 SPT-2 1.5-1.95 4,5,7=12 150 55 Nil Nil ----------do--------- --do-- --do--

Clayey Soil of
UDS-1 3.0-3.5 - 150 55 Nil Nil Intermediated CI Yellow
3.0 4.5 Plasticity

SPT-3 3.5-3.95 7,8,10=18 150 55 Nil Nil ----------do--------- --do-- --do--

4.5 6.0 SPT-4 4.5-4.95 8,9,11=20 150 55 Nil Nil ----------do--------- --do-- --do--

6.0 7.5 SPT-5 6.0-6.45 9,12,14=26 150 55 Nil Nil ----------do--------- --do-- --do--

7.5 9.0 SPT-6 7.5-7.95 10,13,17=30 150 55 Nil Nil ----------do--------- --do-- --do--

9.0 10.0 SPT-7 9.0-9.45 12,15,19=34 150 55 Nil Nil ----------do--------- --do-- --do--

DS : Disturbed Sample
UDS : Undisturbed Sample
SPT : Standard Penetration Test

26
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

27
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
TABLE–5B, SOIL/ROCK TEST RESULTS FOR
BH -5 (4.2MLD STP at Ward No. 6, Miya Mohalla)

SHEARING
STRENGTH
Mechanical Analysis Consistency Limit

Natural Moisture Content %


CHARACTE
Soil/ Rock Classification
RISTIC

SPECIFIC GRAVITY
Bulk Density (g/cc)
Type of Sample

COMPRESSION
INDEX CC
ANGLE OF SHEARING
Depth
S. No

COHESON ‘C’

RESISTANCE
2
IN kg/cm
Gravel %

Sand%

P.L. %
Clay%

L.L %

P.I.%
Silt%
1 DS-1 0.5 CH - - 2 10 42 46 56 27 29 - - - -

2 SPT-2 1.5 CH - - 1 12 43 44 54 26 28 - - - -

0
3 UDS-1 3.0 CI 13 1.80 4 23 43 30 42 22 22 2.68 0.42 13 0.199

4 SPT-4 4.5 CI - - 6 26 36 32 42 22 22 - - - -

5 SPT-5 6.0 CI - - 5 33 32 30 40 22 20 - - - -

28
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

29
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

TABLE –6A, BORELOG


Sewage Treatment Plant at Ward
Location : Borehole No. : 06
No. 6, Miya Mohalla BH-6 (4.2MLD)
Ground Level : 100.0M Method of Boring : Rotary Drill
Depth of Boring : 10.0m Water Table : Nil
Date of Started : 07.01.2019 Date of Completed : 08.01.2019

Time taken for boring for

Designation (RQD) %
Dia of Bore / Casing

% Core Recovery
Drill Depth

Soil Classification
each 30cm in minutes
DESCRIPTION

Color of Returned
SAMPLES
(m)

Rock Quality
OF STRATA

Used (mm)
SPT ‘N’

Water
(Description of core
Value / rock type color grain
Remarks size texture mineral
From To Type Depth composition degree
of weathering)

0 0.5 DS-1 0.5 - 150 50 Nil Nil BC Soil CH Black

0.5 1.5 SPT-1 1.0-1.45 3,4,5=9 150 55 Nil Nil ----------do--------- --do-- --do--

1.5 2.8 SPT-2 1.5-1.95 5,5,6=11 150 55 Nil Nil ----------do--------- --do-- --do--

Clayey Soil of
UDS-1 3.0-3.5 - 150 55 Nil Nil Intermediated CI Yellow
2.8 4.5 Plasticity

SPT-3 3.5-3.95 6,7,10=17 150 55 Nil Nil ----------do--------- --do-- --do--

4.5 6.0 SPT-4 4.5-4.95 7,8,11=19 150 55 Nil Nil ----------do--------- --do-- --do--

6.0 7.5 SPT-5 6.0-6.45 8,11,13=24 150 55 Nil Nil ----------do--------- --do-- --do--

7.5 9.0 SPT-6 7.5-7.95 10,12,16=28 150 55 Nil Nil ----------do--------- --do-- --do--

9.0 10.0 SPT-7 9.0-9.45 12,14,17=31 150 55 Nil Nil ----------do--------- --do-- --do--

DS : Disturbed Sample
UDS : Undisturbed Sample
SPT : Standard Penetration Test

30
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

31
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
TABLE–6B, SOIL/ROCK TEST RESULTS FOR
BH -6 (4.2MLD STP at Ward No. 6, Miya Mohalla)

SHEARING
STRENGTH
Mechanical Analysis Consistency Limit

Natural Moisture Content %


Soil/ Rock Classification CHARACTE
RISTIC

SPECIFIC GRAVITY
Bulk Density (g/cc)
Type of Sample

COMPRESSION
INDEX CC
ANGLE OF SHEARING
Depth
S. No

COHESON ‘C’

RESISTANCE
2
IN kg/cm
Gravel %

Sand%

P.L. %
Clay%

L.L %

P.I.%
1 DS-1 0.5 CH - - 3 6 Silt%
45 46 53 26 27 - - - -

2 SPT-2 1.5 CH - - 2 9 44 45 51 26 25 - - - -

0
3 UDS-1 2.0 CH 11 1.78 4 15 38 43 50 26 24 2.66 0.44 12 0.232

4 SPT-4 4.5 CI - - 3 24 36 37 43 22 21 - - - -

5 SPT-5 6.0 CI - - 2 29 34 35 42 22 20 - - - -

32
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

33
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

TABLE –7A, BORELOG


Sewage Treatment Plant at Ward
Location : Borehole No. : 07
No. 6, Miya Mohalla BH-7 (4.2MLD)
Ground Level : 100.0M Method of Boring : Rotary Drill
Depth of Boring : 10.0m Water Table : Nil
Date of Started : 07.01.2019 Date of Completed : 08.01.2019

Time taken for boring for

Designation (RQD) %
Dia of Bore / Casing

% Core Recovery
Drill Depth

Soil Classification
each 30cm in minutes
DESCRIPTION

Color of Returned
SAMPLES
(m)

Rock Quality
OF STRATA

Used (mm)
SPT ‘N’

Water
(Description of core
Value / rock type color grain
Remarks size texture mineral
From To Type Depth composition degree
of weathering)

0 0.5 DS-1 0.5 - 150 50 Nil Nil BC Soil CH Black

0.5 1.5 SPT-1 1.0-1.45 4,4,6=10 150 55 Nil Nil ----------do--------- --do-- --do--

SPT-2 1.5-1.95 4,6,7=13 150 55 Nil Nil ----------do--------- --do-- --do--


1.5 3.0
UDS-1 2.0-2.5 - 150 55 Nil Nil ----------do--------- --do-- --do--

Clayey Soil of
3.0 4.5 SPT-3 3.0-3.45 7,7,9=16 150 55 Nil Nil Intermediated CI Yellow
Plasticity

4.5 6.0 SPT-4 4.5-4.95 8,10,11=21 150 55 Nil Nil ----------do--------- --do-- --do--

6.0 7.5 SPT-5 6.0-6.45 9,11,14=25 150 55 Nil Nil ----------do--------- --do-- --do--

7.5 9.0 SPT-6 7.5-7.95 10,12,16=28 150 55 Nil Nil ----------do--------- --do-- --do--

9.0 10.0 SPT-7 9.0-9.45 11,13,17=30 150 55 Nil Nil ----------do--------- --do-- --do--

DS : Disturbed Sample
UDS : Undisturbed Sample
SPT : Standard Penetration Test

34
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

35
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
TABLE–7B, SOIL/ROCK TEST RESULTS FOR
BH -7 (4.2MLD STP at Ward No. 6, Miya Mohalla)

SHEARING
STRENGTH
Mechanical Analysis Consistency Limit

Natural Moisture Content %


CHARACTE
Soil/ Rock Classification
RISTIC

SPECIFIC GRAVITY
Bulk Density (g/cc)
Type of Sample

COMPRESSION
INDEX CC
ANGLE OF SHEARING
Depth
S. No

COHESON ‘C’

RESISTANCE
2
IN kg/cm
Gravel %

Sand%

P.L. %
Clay%

L.L %

P.I.%
Silt%
1 DS-1 0.5 CH - - 2 6 45 47 53 25 28 - - - -

2 SPT-2 1.5 CH - - 1 9 44 46 53 26 27 - - - -

0
3 UDS-1 2.0 CH 9 1.75 5 12 41 42 52 27 25 2.66 0.37 9 0.221

4 SPT-3 3.0 CI - - 0 30 34 36 42 24 18 - - - -

5 SPT-4 4.5 CI - - 2 44 26 28 37 23 14 - - - -

36
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

37
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

38
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

TABLE –1A, BORELOG


Inter Pump Station at Ward
Location : Borehole No. : 01
No. 1 (IPS)
Ground Level : 100.0M Method of Boring : Rotary Drill
Depth of Boring : 10.0m Water Table : Nil
Date of Started : 13.01.2019 Date of Completed : 14.01.2019

Time taken for boring for

Designation (RQD) %
Dia of Bore / Casing

% Core Recovery
Drill Depth

Soil Classification
each 30cm in minutes
DESCRIPTION

Color of Returned
SAMPLES
(m)

Rock Quality
OF STRATA

Used (mm)
SPT ‘N’

Water
(Description of core
Value / rock type color grain
Remarks size texture mineral
From To Type Depth composition degree
of weathering)

0 0.5 DS-1 0.5 - 150 50 Nil Nil BC Soil CH Black

0.5 1.5 SPT-1 1.0-1.45 3,4,4=8 150 55 Nil Nil ----------do--------- --do-- --do--

1.5 3.0 SPT-2 1.5-1.95 4,5,6=11 150 55 Nil Nil ----------do--------- --do-- --do--

Clayey Soil of
UDS-1 3.0-3.5 - 150 55 Nil Nil Intermediated CI Yellow
3.0 4.5 Plasticity

SPT-3 3.5-3.95 6,7,9=16 150 55 Nil Nil ----------do--------- --do-- --do--

4.5 6.0 SPT-4 4.5-4.95 7,9,11=20 150 55 Nil Nil ----------do--------- --do-- --do--

6.0 7.5 SPT-5 6.0-6.45 8,10,13=23 150 55 Nil Nil ----------do--------- --do-- --do--

7.5 9.0 SPT-6 7.5-7.95 10,12,15=27 150 55 Nil Nil ----------do--------- --do-- --do--

9.0 10.0 SPT-7 9.0-9.45 12,14,16=30 150 55 Nil Nil ----------do--------- --do-- --do--

DS : Disturbed Sample
UDS : Undisturbed Sample
SPT : Standard Penetration Test

39
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

40
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.
TABLE–1B, SOIL/ROCK TEST RESULTS FOR
BH -1 (Inter Pump Station at Ward)

SHEARING
STRENGTH
Mechanical Analysis Consistency Limit

Natural Moisture Content %


Soil/ Rock Classification CHARACTE
RISTIC

SPECIFIC GRAVITY
Bulk Density (g/cc)
Type of Sample

COMPRESSION
INDEX CC
ANGLE OF SHEARING
Depth
S. No

COHESON ‘C’

RESISTANCE
2
IN kg/cm
Gravel %

Sand%

P.L. %
Clay%

L.L %

P.I.%
1 DS-1 0.5 CH - - 2 7 Silt%
45 46 57 27 30 - - - -

2 SPT-2 1.5 CH - - 1 10 44 45 55 27 28 - - - -

0
3 UDS-1 3.0 CI 9 1.79 2 22 41 35 47 24 23 2.65 0.45 12 0.199

4 SPT-4 4.5 CI - - 6 24 37 33 39 23 16 - - - -

5 SPT-5 6.0 CI - - 8 20 38 34 36 21 15 - - - -

41
Name of Project:- Soil Investigation Work for Construction of 4.2MLD STP & IPS Site, Under Sewage Project at
Nasrullaganj.

42
Annexure-1

Soil Investigation Work for Constrution of Sewage Project at Nasrullaganj M.P.

Location BH-1 Sewage Treatment Plant


SBC CALCULATION BASED ON SHEAR CRIETERIA
(As per IS 6403: 1981)
Water table correction
Type of Shear Failure- Local Shear Failure Type of foundation –Open, Squire F.O.S-2.5
factor = 0.5
SBC= 2/3 cN'c scdcic+q(N'q-1) sqdqiq+1/2 BY N'Y sydyiy W'

Net safe bearing capacity=


Bulk density of soil, Kn/m3
Depth of foundation in m

BC3=0.5.Y.B.NY.dY.SY.IY.W’
Length of footing in m

BC2=Y.D(Nq-1)dq.iq.sq

Total bearing capacity


Width of footing in m

BC1=2/3C.NC.dc.sc.ic
Cohesion ‘c’ Kn /m2

BC=BC1+BC2+BC3
resistance degree
Angle of shearing

Bearing capacity

Bearing capacity

Bearing capacity

BC/FOS
Bearing capacity
S. No

factors Depth factors Shape factors


D L B y C Ø NC’ Nq’ NY’ dC dq dY SC Sq Sy BC1 BC2 BC3 kPa kPa

1 3.0 3.0 3.0 17.8 46.0 9 6.81 1.72 0.57 1.22 1.00 1.00 1.3 1.2 0.8 331 20.2 6.1 357 143

2 4.0 3.0 3.0 17.8 46.0 9 6.81 1.72 0.57 1.30 1.00 1.00 1.3 1.2 0.8 353 27.0 6.1 386 154

3 5.0 3.0 3.0 17.8 46.0 9 6.81 1.72 0.57 1.37 1.00 1.00 1.3 1.2 0.8 372 33.7 6.1 412 165

4 6.0 3.0 3.0 17.8 46.0 9 6.81 1.72 0.57 1.44 1.00 1.00 1.3 1.2 0.8 391 40.4 6.1 438 175

SBC CALCULATION BASED ON SETTLEMENT CRIETERIA


Consolidation Settlement (As per IS:8009 (Part-I)-1976)
(a) Immediate settlement: = Si = qB ( 1-μ2)If/E
E=Value taken round from stress strain Curve & Value of μ, If is taken from IS 8009
S. No Depth (M) q=Net foundation B=Width of μ If E (kPa) Immediate
pressure (kPa) Foundation (M) settlement (mm)
1 3.00 120 3.00 0.50 0.95 7500 34.20
2 4.00 140 3.00 0.50 0.95 7500 39.90
3 5.00 160 3.00 0.50 0.95 7500 45.60
4 6.00 170 3.00 0.50 0.95 7500 48.45

(b) Consolidation Settlement


Cc x H0 p0+∆p Cc = Compression index eo = Initial void Ratio
Sc = Log10
1+e0 p0 ∆ p = Pressure increment Ho = Thickness of caly strata

∆p= R= 1.693

Z= Depth of Mid of Clay Layer from Applied Pressure

Page-43

Depth-3.0m to 6.0 Assuming same strata after 6.0m to effected Loaded Area depth
Z H0 po Cc x H0 p0+∆p Consolidation
Depth y Cc ∆p (kPa) e0 Sc = x Log10
(M) (M) (kPa) 1+e0 p0 Settlement mm

3.00 17.8 0.265 3.00 6.00 14.40 106.80 0.74 0.0502 50.20

4.00 17.8 0.265 3.00 6.00 16.80 124.60 0.74 0.0502 50.20

5.00 17.8 0.265 3.00 6.00 19.20 142.40 0.74 0.0502 50.20

6.00 17.8 0.265 3.00 6.00 20.40 160.20 0.74 0.0476 47.60

TOTAL SETTLEMENT
S. No Depth (M) Immediate Consolidation Total Depth Corrected Permissible
settlement (mm) Settlement Settlement Factor Settlement Settlement As
(mm) (mm) (mm) per IS 1904-1986
1 3.00 34.20 50.20 84.40 0.725 61.19 75mm
2 4.00 39.90 50.20 90.10 0.725 65.32 75mm
3 5.00 45.60 50.20 95.80 0.725 69.46 75mm
4 6.00 48.45 47.60 96.05 0.725 69.64 75mm

Page-44
Annexure-2

Soil Investigation Work for Constrution of Sewage Project at Nasrullaganj M.P.

Location BH-2 Sewage Treatment Plant


SBC CALCULATION BASED ON SHEAR CRIETERIA
(As per IS 6403: 1981)
Water table correction
Type of Shear Failure- Local Shear Failure Type of foundation –Open, Squire F.O.S-2.5
factor = 0.5
SBC= 2/3 cN'c scdcic+q(N'q-1) sqdqiq+1/2 BY N'Y sydyiy W'

Net safe bearing capacity=


Bulk density of soil, Kn/m3
Depth of foundation in m

BC3=0.5.Y.B.NY.dY.SY.IY.W’
Length of footing in m

BC2=Y.D(Nq-1)dq.iq.sq

Total bearing capacity


Width of footing in m

BC1=2/3C.NC.dc.sc.ic
Cohesion ‘c’ Kn /m2

BC=BC1+BC2+BC3
resistance degree
Angle of shearing

Bearing capacity

Bearing capacity

Bearing capacity

BC/FOS
Bearing capacity
S. No

factors Depth factors Shape factors


D L B y C Ø NC’ Nq’ NY’ dC dq dY SC Sq Sy BC1 BC2 BC3 kPa kPa

1 3.0 3.0 3.0 17.9 40.0 11 7.16 1.88 0.71 1.23 1.00 1.00 1.3 1.2 0.8 305 25.0 7.6 338 135

2 4.0 3.0 3.0 17.9 40.0 11 7.16 1.88 0.71 1.30 1.00 1.00 1.3 1.2 0.8 323 33.4 7.6 364 146

3 5.0 3.0 3.0 17.9 40.0 11 7.16 1.88 0.71 1.38 1.00 1.00 1.3 1.2 0.8 343 41.7 7.6 392 157

4 6.0 3.0 3.0 17.9 40.0 11 7.16 1.88 0.71 1.45 1.00 1.00 1.3 1.2 0.8 360 50.1 7.6 418 167

SBC CALCULATION BASED ON SETTLEMENT CRIETERIA


Consolidation Settlement (As per IS:8009 (Part-I)-1976)
(a) Immediate settlement: = Si = qB ( 1-μ2)If/E
E=Value taken round from stress strain Curve & Value of μ, If is taken from IS 8009
S. No Depth (M) q=Net foundation B=Width of μ If E (kPa) Immediate
pressure (kPa) Foundation (M) settlement (mm)
1 3.00 110 3.00 0.50 0.95 7500 31.35
2 4.00 130 3.00 0.50 0.95 7500 37.05
3 5.00 150 3.00 0.50 0.95 7500 42.75
4 6.00 180 3.00 0.50 0.95 7500 51.30

(b) Consolidation Settlement


Cc x H0 p0+∆p Cc = Compression index eo = Initial void Ratio
Sc = Log10
1+e0 p0 ∆ p = Pressure increment Ho = Thickness of caly strata

∆p= R= 1.693

Z= Depth of Mid of Clay Layer from Applied Pressure

Page-45

Depth-3.0m to 6.0 Assuming same strata after 6.0m to effected Loaded Area depth
Z H0 po Cc x H0 p0+∆p Consolidation
Depth y Cc ∆p (kPa) e0 Sc = x Log10
(M) (M) (kPa) 1+e0 p0 Settlement mm

3.00 17.9 0.232 3.00 6.00 13.20 107.40 0.66 0.0422 42.20

4.00 17.9 0.232 3.00 6.00 15.60 125.30 0.66 0.0427 42.70

5.00 17.9 0.232 3.00 6.00 18.00 143.20 0.66 0.0431 43.10

6.00 17.9 0.232 3.00 6.00 21.60 161.10 0.66 0.0458 45.80

TOTAL SETTLEMENT
S. No Depth (M) Immediate Consolidation Total Depth Corrected Permissible
settlement (mm) Settlement Settlement Factor Settlement Settlement As
(mm) (mm) (mm) per IS 1904-1986
1 3.00 31.35 42.20 73.55 0.725 53.32 75mm
2 4.00 37.05 42.70 79.75 0.725 57.82 75mm
3 5.00 42.75 43.10 85.85 0.725 62.24 75mm
4 6.00 51.30 45.80 97.10 0.725 70.40 75mm

Page-46
Annexure-3

Soil Investigation Work for Constrution of Sewage Project at Nasrullaganj M.P.

Location BH-3
SBC CALCULATION BASED ON SHEAR CRIETERIA
(As per IS 6403: 1981)
Water table correction
Type of Shear Failure- Local Shear Failure Type of foundation –Open, Squire F.O.S-2.5
factor = 0.5
SBC= 2/3 cN'c scdcic+q(N'q-1) sqdqiq+1/2 BY N'Y sydyiy W'

Net safe bearing capacity=


Bulk density of soil, Kn/m3
Depth of foundation in m

BC3=0.5.Y.B.NY.dY.SY.IY.W’
Length of footing in m

BC2=Y.D(Nq-1)dq.iq.sq

Total bearing capacity


Width of footing in m

BC1=2/3C.NC.dc.sc.ic
Cohesion ‘c’ Kn /m2

BC=BC1+BC2+BC3
resistance degree
Angle of shearing

Bearing capacity

Bearing capacity

Bearing capacity

BC/FOS
Bearing capacity
S. No

factors Depth factors Shape factors


D L B y C Ø NC’ Nq’ NY’ dC dq dY SC Sq Sy BC1 BC2 BC3 kPa kPa

1 3.0 3.0 3.0 17.7 38.0 10 7.16 1.88 0.71 1.23 1.00 1.00 1.3 1.2 0.8 290 24.4 7.5 322 129

2 4.0 3.0 3.0 17.7 38.0 10 7.16 1.88 0.71 1.30 1.00 1.00 1.3 1.2 0.8 307 32.5 7.5 347 139

3 5.0 3.0 3.0 17.7 38.0 10 7.16 1.88 0.71 1.38 1.00 1.00 1.3 1.2 0.8 325 40.7 7.5 373 149

4 6.0 3.0 3.0 17.7 38.0 10 7.16 1.88 0.71 1.45 1.00 1.00 1.3 1.2 0.8 342 48.8 7.5 398 159

SBC CALCULATION BASED ON SETTLEMENT CRIETERIA


Consolidation Settlement (As per IS:8009 (Part-I)-1976)
(a) Immediate settlement: = Si = qB ( 1-μ2)If/E
E=Value taken round from stress strain Curve & Value of μ, If is taken from IS 8009
S. No Depth (M) q=Net foundation B=Width of μ If E (kPa) Immediate
pressure (kPa) Foundation (M) settlement (mm)
1 3.00 120 3.00 0.50 0.95 7500 34.20
2 4.00 140 3.00 0.50 0.95 7500 39.90
3 5.00 160 3.00 0.50 0.95 7500 45.60
4 6.00 190 3.00 0.50 0.95 7500 54.15

(b) Consolidation Settlement


Cc x H0 p0+∆p Cc = Compression index eo = Initial void Ratio
Sc = Log10
1+e0 p0 ∆ p = Pressure increment Ho = Thickness of caly strata

∆p= R= 1.693

Z= Depth of Mid of Clay Layer from Applied Pressure

Page-47

Depth-3.0m to 6.0 Assuming same strata after 6.0m to effected Loaded Area depth
Z H0 po Cc x H0 p0+∆p Consolidation
Depth y Cc ∆p (kPa) e0 Sc = x Log10
(M) (M) (kPa) 1+e0 p0 Settlement mm

3.00 17.7 0.199 3.00 6.00 14.40 106.20 0.72 0.0383 38.30

4.00 17.7 0.199 3.00 6.00 16.80 123.90 0.72 0.0383 38.30

5.00 17.7 0.199 3.00 6.00 19.20 141.60 0.72 0.0383 38.30

6.00 17.7 0.199 3.00 6.00 22.80 159.30 0.72 0.0403 40.30

TOTAL SETTLEMENT
S. No Depth (M) Immediate Consolidation Total Depth Corrected Permissible
settlement (mm) Settlement Settlement Factor Settlement Settlement As
(mm) (mm) (mm) per IS 1904-1986
1 3.00 34.20 38.30 72.50 0.725 52.56 75mm
2 4.00 39.90 38.30 78.20 0.725 56.70 75mm
3 5.00 45.60 38.30 83.90 0.725 60.83 75mm
4 6.00 54.15 40.30 94.45 0.725 68.48 75mm

Page-48
Annexure-4

Soil Investigation Work for Constrution of Sewage Project at Nasrullaganj M.P.

Location BH-4 Sewage Treatment Plant


SBC CALCULATION BASED ON SHEAR CRIETERIA
(As per IS 6403: 1981)
Water table correction
Type of Shear Failure- Local Shear Failure Type of foundation –Open, Squire F.O.S-2.5
factor = 0.5
SBC= 2/3 cN'c scdcic+q(N'q-1) sqdqiq+1/2 BY N'Y sydyiy W'

Net safe bearing capacity=


Bulk density of soil, Kn/m3
Depth of foundation in m

BC3=0.5.Y.B.NY.dY.SY.IY.W’
Length of footing in m

BC2=Y.D(Nq-1)dq.iq.sq

Total bearing capacity


Width of footing in m

BC1=2/3C.NC.dc.sc.ic
Cohesion ‘c’ Kn /m2

BC=BC1+BC2+BC3
resistance degree
Angle of shearing

Bearing capacity

Bearing capacity

Bearing capacity

BC/FOS
Bearing capacity
S. No

factors Depth factors Shape factors


D L B y C Ø NC’ Nq’ NY’ dC dq dY SC Sq Sy BC1 BC2 BC3 kPa kPa

1 3.0 3.0 3.0 17.5 50.0 8 6.49 1.57 0.45 1.22 1.00 1.00 1.3 1.2 0.8 343 15.4 4.7 363 145

2 4.0 3.0 3.0 17.5 50.0 8 6.49 1.57 0.45 1.29 1.00 1.00 1.3 1.2 0.8 363 20.5 4.7 388 155

3 5.0 3.0 3.0 17.5 50.0 8 6.49 1.57 0.45 1.36 1.00 1.00 1.3 1.2 0.8 382 25.7 4.7 412 165

4 6.0 3.0 3.0 17.5 50.0 8 6.49 1.57 0.45 1.44 1.00 1.00 1.3 1.2 0.8 405 30.8 4.7 441 176

SBC CALCULATION BASED ON SETTLEMENT CRIETERIA


Consolidation Settlement (As per IS:8009 (Part-I)-1976)
(a) Immediate settlement: = Si = qB ( 1-μ2)If/E
E=Value taken round from stress strain Curve & Value of μ, If is taken from IS 8009
S. No Depth (M) q=Net foundation B=Width of μ If E (kPa) Immediate
pressure (kPa) Foundation (M) settlement (mm)
1 3.00 110 3.00 0.50 0.95 7500 31.35
2 4.00 130 3.00 0.50 0.95 7500 37.05
3 5.00 150 3.00 0.50 0.95 7500 42.75
4 6.00 170 3.00 0.50 0.95 7500 48.45

(b) Consolidation Settlement


Cc x H0 p0+∆p Cc = Compression index eo = Initial void Ratio
Sc = Log10
1+e0 p0 ∆ p = Pressure increment Ho = Thickness of caly strata

∆p= R= 1.693

Z= Depth of Mid of Clay Layer from Applied Pressure

Page-49
Depth-3.0m to 6.0 Assuming same strata after 6.0m to effected Loaded Area depth

Z H0 po Cc x H0 p0+∆p Consolidation
Depth y Cc ∆p (kPa) e0 Sc = x Log10
(M) (M) (kPa) 1+e0 p0 Settlement mm

3.00 17.5 0.265 3.00 6.00 13.20 105.00 0.66 0.0493 49.30

4.00 17.5 0.265 3.00 6.00 15.60 122.50 0.66 0.0499 49.90

5.00 17.5 0.265 3.00 6.00 18.00 140.00 0.66 0.0503 50.30

6.00 17.5 0.265 3.00 6.00 20.40 157.50 0.66 0.0507 50.70

TOTAL SETTLEMENT
S. No Depth (M) Immediate Consolidation Total Depth Corrected Permissible
settlement (mm) Settlement Settlement Factor Settlement Settlement As
(mm) (mm) (mm) per IS 1904-1986
1 3.00 31.35 49.30 80.65 0.725 58.47 75mm
2 4.00 37.05 49.90 86.95 0.725 63.04 75mm
3 5.00 42.75 50.30 93.05 0.725 67.46 75mm
4 6.00 48.45 50.70 99.15 0.725 71.88 75mm

Page-50
Annexure-5

Soil Investigation Work for Constrution of Sewage Project at Nasrullaganj M.P.

Location BH-5 Sewage Treatment Plant


SBC CALCULATION BASED ON SHEAR CRIETERIA
(As per IS 6403: 1981)
Water table correction
Type of Shear Failure- Local Shear Failure Type of foundation –Open, Squire F.O.S-2.5
factor = 0.5
SBC= 2/3 cN'c scdcic+q(N'q-1) sqdqiq+1/2 BY N'Y sydyiy W'

Net safe bearing capacity=


Bulk density of soil, Kn/m3
Depth of foundation in m

BC3=0.5.Y.B.NY.dY.SY.IY.W’
Length of footing in m

BC2=Y.D(Nq-1)dq.iq.sq

Total bearing capacity


Width of footing in m

BC1=2/3C.NC.dc.sc.ic
Cohesion ‘c’ Kn /m2

BC=BC1+BC2+BC3
resistance degree
Angle of shearing

Bearing capacity

Bearing capacity

Bearing capacity

BC/FOS
Bearing capacity
S. No

factors Depth factors Shape factors


D L B y C Ø NC’ Nq’ NY’ dC dq dY SC Sq Sy BC1 BC2 BC3 kPa kPa

1 3.0 3.0 3.0 18 42.0 13 7.53 2.06 0.86 1.23 1.00 1.00 1.3 1.2 0.8 337 30.5 9.3 377 151

2 4.0 3.0 3.0 18 42.0 13 7.53 2.06 0.86 1.31 1.00 1.00 1.3 1.2 0.8 359 40.7 9.3 409 164

3 5.0 3.0 3.0 18 42.0 13 7.53 2.06 0.86 1.38 1.00 1.00 1.3 1.2 0.8 378 50.9 9.3 438 175

4 6.0 3.0 3.0 18 42.0 13 7.53 2.06 0.86 1.46 1.00 1.00 1.3 1.2 0.8 400 61.1 9.3 470 188

SBC CALCULATION BASED ON SETTLEMENT CRIETERIA


Consolidation Settlement (As per IS:8009 (Part-I)-1976)
(a) Immediate settlement: = Si = qB ( 1-μ2)If/E
E=Value taken round from stress strain Curve & Value of μ, If is taken from IS 8009
S. No Depth (M) q=Net foundation B=Width of μ If E (kPa) Immediate
pressure (kPa) Foundation (M) settlement (mm)
1 3.00 120 3.00 0.50 0.95 7500 34.20
2 4.00 140 3.00 0.50 0.95 7500 39.90
3 5.00 160 3.00 0.50 0.95 7500 45.60
4 6.00 180 3.00 0.50 0.95 7500 51.30

(b) Consolidation Settlement


Cc x H0 p0+∆p Cc = Compression index eo = Initial void Ratio
Sc = Log10
1+e0 p0 ∆ p = Pressure increment Ho = Thickness of caly strata

∆p= R= 1.693

Z= Depth of Mid of Clay Layer from Applied Pressure

Page-51
Depth-3.0m to 6.0 Assuming same strata after 6.0m to effected Loaded Area depth

Z H0 po Cc x H0 p0+∆p Consolidation
Depth y Cc ∆p (kPa) e0 Sc = x Log10
(M) (M) (kPa) 1+e0 p0 Settlement mm

3.00 18.0 0.199 3.00 6.00 14.40 108.00 0.70 0.0382 38.20

4.00 18.0 0.199 3.00 6.00 16.80 126.00 0.70 0.0382 38.20

5.00 18.0 0.199 3.00 6.00 19.20 144.00 0.70 0.0382 38.20

6.00 18.0 0.199 3.00 6.00 21.60 162.00 0.70 0.0382 38.20

TOTAL SETTLEMENT
S. No Depth (M) Immediate Consolidation Total Depth Corrected Permissible
settlement (mm) Settlement Settlement Factor Settlement Settlement As
(mm) (mm) (mm) per IS 1904-1986
1 3.00 34.20 38.20 72.40 0.725 52.49 75mm
2 4.00 39.90 38.20 78.10 0.725 56.62 75mm
3 5.00 45.60 38.20 83.80 0.725 60.76 75mm
4 6.00 51.30 38.20 89.50 0.725 64.89 75mm

Page-52
Annexure-6

Soil Investigation Work for Constrution of Sewage Project at Nasrullaganj M.P.

Location BH-6 Sewage Treatment Plant


SBC CALCULATION BASED ON SHEAR CRIETERIA
(As per IS 6403: 1981)
Water table correction
Type of Shear Failure- Local Shear Failure Type of foundation –Open, Squire F.O.S-2.5
factor = 0.5
SBC= 2/3 cN'c scdcic+q(N'q-1) sqdqiq+1/2 BY N'Y sydyiy W'

Net safe bearing capacity=


Bulk density of soil, Kn/m3
Depth of foundation in m

BC3=0.5.Y.B.NY.dY.SY.IY.W’
Length of footing in m

BC2=Y.D(Nq-1)dq.iq.sq

Total bearing capacity


Width of footing in m

BC1=2/3C.NC.dc.sc.ic
Cohesion ‘c’ Kn /m2

BC=BC1+BC2+BC3
resistance degree
Angle of shearing

Bearing capacity

Bearing capacity

Bearing capacity

BC/FOS
Bearing capacity
S. No

factors Depth factors Shape factors


D L B y C Ø NC’ Nq’ NY’ dC dq dY SC Sq Sy BC1 BC2 BC3 kPa kPa

1 3.0 3.0 3.0 17.8 44.0 12 7.53 2.06 0.86 1.23 1.00 1.00 1.3 1.2 0.8 353 29.8 9.2 392 157

2 4.0 3.0 3.0 17.8 44.0 12 7.53 2.06 0.86 1.31 1.00 1.00 1.3 1.2 0.8 376 39.7 9.2 425 170

3 5.0 3.0 3.0 17.8 44.0 12 7.53 2.06 0.86 1.38 1.00 1.00 1.3 1.2 0.8 396 49.6 9.2 455 182

4 6.0 3.0 3.0 17.8 44.0 12 7.53 2.06 0.86 1.46 1.00 1.00 1.3 1.2 0.8 419 59.5 9.2 488 195

SBC CALCULATION BASED ON SETTLEMENT CRIETERIA


Consolidation Settlement (As per IS:8009 (Part-I)-1976)
(a) Immediate settlement: = Si = qB ( 1-μ2)If/E
E=Value taken round from stress strain Curve & Value of μ, If is taken from IS 8009
S. No Depth (M) q=Net foundation B=Width of μ If E (kPa) Immediate
pressure (kPa) Foundation (M) settlement (mm)
1 3.00 120 3.00 0.50 0.95 7500 34.20
2 4.00 140 3.00 0.50 0.95 7500 39.90
3 5.00 160 3.00 0.50 0.95 7500 45.60
4 6.00 180 3.00 0.50 0.95 7500 51.30

(b) Consolidation Settlement


Cc x H0 p0+∆p Cc = Compression index eo = Initial void Ratio
Sc = Log10
1+e0 p0 ∆ p = Pressure increment Ho = Thickness of caly strata

∆p= R= 1.693

Z= Depth of Mid of Clay Layer from Applied Pressure

Page-53

Depth-3.0m to 6.0 Assuming same strata after 6.0m to effected Loaded Area depth
Z H0 po Cc x H0 p0+∆p Consolidation
Depth y Cc ∆p (kPa) e0 Sc = x Log10
(M) (M) (kPa) 1+e0 p0 Settlement mm

3.00 17.8 0.232 3.00 6.00 14.40 106.80 0.70 0.0450 45.00

4.00 17.8 0.232 3.00 6.00 16.80 124.60 0.70 0.0450 45.00

5.00 17.8 0.232 3.00 6.00 19.20 142.40 0.70 0.0450 45.00

6.00 17.8 0.232 3.00 6.00 21.60 160.20 0.70 0.0450 45.00

TOTAL SETTLEMENT
S. No Depth (M) Immediate Consolidation Total Depth Corrected Permissible
settlement (mm) Settlement Settlement Factor Settlement Settlement As
(mm) (mm) (mm) per IS 1904-1986
1 3.00 34.20 45.00 79.20 0.725 57.42 75mm
2 4.00 39.90 45.00 84.90 0.725 61.55 75mm
3 5.00 45.60 45.00 90.60 0.725 65.69 75mm
4 6.00 51.30 45.00 96.30 0.725 69.82 75mm

Page-54
Annexure-7

Soil Investigation Work for Constrution of Sewage Project at Nasrullaganj M.P.

Location BH-7 Sewage Treatment Plant


SBC CALCULATION BASED ON SHEAR CRIETERIA
(As per IS 6403: 1981)
Water table correction
Type of Shear Failure- Local Shear Failure Type of foundation –Open, Squire F.O.S-2.5
factor = 0.5
SBC= 2/3 cN'c scdcic+q(N'q-1) sqdqiq+1/2 BY N'Y sydyiy W'

Net safe bearing capacity=


Bulk density of soil, Kn/m3
Depth of foundation in m

BC3=0.5.Y.B.NY.dY.SY.IY.W’
Length of footing in m

BC2=Y.D(Nq-1)dq.iq.sq

Total bearing capacity


Width of footing in m

BC1=2/3C.NC.dc.sc.ic
Cohesion ‘c’ Kn /m2

BC=BC1+BC2+BC3
resistance degree
Angle of shearing

Bearing capacity

Bearing capacity

Bearing capacity

BC/FOS
Bearing capacity
S. No

factors Depth factors Shape factors


D L B y C Ø NC’ Nq’ NY’ dC dq dY SC Sq Sy BC1 BC2 BC3 kPa kPa

1 3.0 3.0 3.0 17.5 50.0 8 6.49 1.57 0.45 1.22 1.00 1.00 1.3 1.2 0.8 343 15.4 4.7 363 145

2 4.0 3.0 3.0 17.5 50.0 8 6.49 1.57 0.45 1.29 1.00 1.00 1.3 1.2 0.8 363 20.5 4.7 388 155

3 5.0 3.0 3.0 17.5 50.0 8 6.49 1.57 0.45 1.36 1.00 1.00 1.3 1.2 0.8 382 25.7 4.7 412 165

4 6.0 3.0 3.0 17.5 50.0 8 6.49 1.57 0.45 1.44 1.00 1.00 1.3 1.2 0.8 405 30.8 4.7 441 176

SBC CALCULATION BASED ON SETTLEMENT CRIETERIA


Consolidation Settlement (As per IS:8009 (Part-I)-1976)
(a) Immediate settlement: = Si = qB ( 1-μ2)If/E
E=Value taken round from stress strain Curve & Value of μ, If is taken from IS 8009
S. No Depth (M) q=Net foundation B=Width of μ If E (kPa) Immediate
pressure (kPa) Foundation (M) settlement (mm)
1 3.00 110 3.00 0.50 0.95 7500 31.35
2 4.00 130 3.00 0.50 0.95 7500 37.05
3 5.00 150 3.00 0.50 0.95 7500 42.75
4 6.00 170 3.00 0.50 0.95 7500 48.45

(b) Consolidation Settlement


Cc x H0 p0+∆p Cc = Compression index eo = Initial void Ratio
Sc = Log10
1+e0 p0 ∆ p = Pressure increment Ho = Thickness of caly strata

∆p= R= 1.693

Z= Depth of Mid of Clay Layer from Applied Pressure

Page-55
Depth-3.0m to 6.0 Assuming same strata after 6.0m to effected Loaded Area depth

Z H0 po Cc x H0 p0+∆p Consolidation
Depth y Cc ∆p (kPa) e0 Sc = x Log10
(M) (M) (kPa) 1+e0 p0 Settlement mm

3.00 17.5 0.265 3.00 6.00 13.20 105.00 0.66 0.0493 49.30

4.00 17.5 0.265 3.00 6.00 15.60 122.50 0.66 0.0499 49.90

5.00 17.5 0.265 3.00 6.00 18.00 140.00 0.66 0.0503 50.30

6.00 17.5 0.265 3.00 6.00 20.40 157.50 0.66 0.0507 50.70

TOTAL SETTLEMENT
S. No Depth (M) Immediate Consolidation Total Depth Corrected Permissible
settlement (mm) Settlement Settlement Factor Settlement Settlement As
(mm) (mm) (mm) per IS 1904-1986
1 3.00 31.35 49.30 80.65 0.725 58.47 75mm
2 4.00 37.05 49.90 86.95 0.725 63.04 75mm
3 5.00 42.75 50.30 93.05 0.725 67.46 75mm
4 6.00 48.45 50.70 99.15 0.725 71.88 75mm

Page-56
Annexure-8

Soil Investigation Work for Constrution of Sewage Project at Nasrullaganj M.P.

Location BH-1 Sewage Pump Station


SBC CALCULATION BASED ON SHEAR CRIETERIA
(As per IS 6403: 1981)
Water table correction
Type of Shear Failure- Local Shear Failure Type of foundation –Open, Squire F.O.S-2.5
factor = 0.5
SBC= 2/3 cN'c scdcic+q(N'q-1) sqdqiq+1/2 BY N'Y sydyiy W'

Net safe bearing capacity=


Bulk density of soil, Kn/m3
Depth of foundation in m

BC3=0.5.Y.B.NY.dY.SY.IY.W’
Length of footing in m

BC2=Y.D(Nq-1)dq.iq.sq

Total bearing capacity


Width of footing in m

BC1=2/3C.NC.dc.sc.ic
Cohesion ‘c’ Kn /m2

BC=BC1+BC2+BC3
resistance degree
Angle of shearing

Bearing capacity

Bearing capacity

Bearing capacity

BC/FOS
Bearing capacity
S. No

factors Depth factors Shape factors


D L B y C Ø NC’ Nq’ NY’ dC dq dY SC Sq Sy BC1 BC2 BC3 kPa kPa

1 3.0 3.0 3.0 17.9 45.0 12 7.53 2.06 0.86 1.23 1.00 1.00 1.3 1.2 0.8 361 30.1 9.2 400 160

2 4.0 3.0 3.0 17.9 45.0 12 7.53 2.06 0.86 1.31 1.00 1.00 1.3 1.2 0.8 385 40.2 9.2 434 174

3 5.0 3.0 3.0 17.9 45.0 12 7.53 2.06 0.86 1.38 1.00 1.00 1.3 1.2 0.8 405 50.2 9.2 464 186

4 6.0 3.0 3.0 17.9 45.0 12 7.53 2.06 0.86 1.46 1.00 1.00 1.3 1.2 0.8 429 60.3 9.2 499 200

SBC CALCULATION BASED ON SETTLEMENT CRIETERIA


Consolidation Settlement (As per IS:8009 (Part-I)-1976)
(a) Immediate settlement: = Si = qB ( 1-μ2)If/E
E=Value taken round from stress strain Curve & Value of μ, If is taken from IS 8009
S. No Depth (M) q=Net foundation B=Width of μ If E (kPa) Immediate
pressure (kPa) Foundation (M) settlement (mm)
1 3.00 120 3.00 0.50 0.95 7500 34.20
2 4.00 140 3.00 0.50 0.95 7500 39.90
3 5.00 160 3.00 0.50 0.95 7500 45.60
4 6.00 180 3.00 0.50 0.95 7500 51.30

(b) Consolidation Settlement


Cc x H0 p0+∆p Cc = Compression index eo = Initial void Ratio
Sc = Log10
1+e0 p0 ∆ p = Pressure increment Ho = Thickness of caly strata

∆p= R= 1.693

Z= Depth of Mid of Clay Layer from Applied Pressure

Page-57

Depth-3.0m to 6.0 Assuming same strata after 6.0m to effected Loaded Area depth
Z H0 po Cc x H0 p0+∆p Consolidation
Depth y Cc ∆p (kPa) e0 Sc = x Log10
(M) (M) (kPa) 1+e0 p0 Settlement mm

3.00 17.9 0.199 3.00 6.00 14.40 107.40 0.70 0.0384 38.40

4.00 17.9 0.199 3.00 6.00 16.80 125.30 0.70 0.0384 38.40

5.00 17.9 0.199 3.00 6.00 19.20 143.20 0.70 0.0384 38.40

6.00 17.9 0.199 3.00 6.00 21.60 161.10 0.70 0.0384 38.40

TOTAL SETTLEMENT
S. No Depth (M) Immediate Consolidation Total Depth Corrected Permissible
settlement (mm) Settlement Settlement Factor Settlement Settlement As
(mm) (mm) (mm) per IS 1904-1986
1 3.00 34.20 38.40 72.60 0.725 52.64 75mm
2 4.00 39.90 38.40 78.30 0.725 56.77 75mm
3 5.00 45.60 38.40 84.00 0.725 60.90 75mm
4 6.00 51.30 38.40 89.70 0.725 65.03 75mm

Page-58
Live Photo at Site
Sewage Treatment Plant

59
Live Photo at Site

60
Live Photo at Site

61
Live Photo at Site

62
Live Photo at Site
Inter Pumping Station

63

You might also like