This Drawings/Design are property of GMRC.

The Drawings/ Design cannot be issued by any other other


person,firm,authority or used by consultant for any other purpose/project without prior written permission of GMRC.The
consultant shall indemnify GMRC against all claims arisen due to infringement of any right protected by design,copyright or
other intellectual property rights.

5 6 7 8 9 LOCATION PLAN
UG Ramp

KAPODRA

LABHESHWARCHOWK

CENTRALWAREHOUSE

SURATRAILWAYSTATION

ISSUED FOR
AS BUILT DRAWING DEFINITIVE DESIGN
GOOD FOR CONSTRUCTION - WD PRELIMINARY DESIGN
PLINTH / TERRACE / ROOF /
NUMBER CONSTRUCTION REFERENCE DRAWING FOR REFERENCE / DISCUSSION
GROUND WATER TANK MUMTY

AA EL. 22.990 REFERENCE REPORT WITH REVISION NO. & DATE :-

EL. 19.49

1 1 EL. 15.48 REFERENCE DESIGN DOCUMENT WITH REVISION NO. & DATE :-

LANDING TOC- +13.800,


+11.700, +9.600

REFERENCE DWG. (Alignment/Land Plan/Arch./Stru./E&M/TVS-HVSC WITH REVISION NO. & DATE :-


C7 C1 C2
AB SR. NO. REFERENCE DRAWING NUMBER REVISION NO. DATE

C11 C21
10
2 2
LEGENDS : ABBREVIATIONS
NUMBER BASEMENT GROUND TO ABOVE
TO GROUND TERRACE TERRACE
CORNER COLUMNS

EDGE COLUMNS
NOTES :-
INTERIOR COLUMNS
C8 C3 C4
AC STUB COLUMNS
C12 C20 PLUNGE COLUMNS

REVISION CONTROL

R00 08-03-23 SUBMITTED FOR APPROVAL SGAWINGS


REV. NO. DATE DESCRIPTION OF CHANGES /CLOUDING DESIGNER
KPS-A-P1 EMPLOYER:
GUJARAT METRO RAIL CORPORATION ( GMRC ) LIMITED.
KPS-A-P2 SPV of Government of India and Government of Gujarat)

3 3 KPS-A-P5
[Formerly known as Metro-Link Express for Gandhinagar And Ahmedabad (MEGA) Company Limited]

NO OBJECTION FROM EMPLOYER IS BEING ACCORDED FOR CONSTRUCTION.

KPS-A-P6, P7, P8, P10,


P11, P12, P13, P15,
P16, P17, P18
AGM / MANAGER (S&T) AGM / MANAGER (SYS) AGM / MANAGER (P&D) AGM / MANAGER (CONST.)
KPS-A-P19
C10 C5 C9 C6
AD KPS-A-P3 & P9
GM(S&T) GM(SYS) GM(P&D) ADDL. GM(CONST.)
C13 C19 KPS-A-P4 ENGINEER:

KPS-A-P14

THE DESIGN & DRAWING AS CERTIFIED BELOW AND SUBMITTED BY THE CONTRACTOR HAVE BEEN PROOF CHECKED BY
GENERAL ENGINEERING CONSULTANT ON BEHALF OF MEGA AND IS RECOMMENDED TO MEGA FOR REFERENCE OF :

4 4 NO OBJECTION NO OBJECTION SUBJECT TO THE COMMENTS AS NOTED

REVISION AND RESUBMISSION REQUIRED SUBJECT TO THE COMMENTS AS NOTED

CSE/DY.CSE/(UG) CTSE/CSSE CTPD/SE CPM/DY.CPM(SYSTEM)/IM DY.CDE(E&M)/STATIONS

S12
C.ARCH/SR.ARCH/(UG) CPM(CIVIL & SYSTEM/UG) DY.PD(CIVIL & TRACK) DY.PD(SYSTEM) PROJECT DIRECTOR

EXCEPTION BY CONTRACTOR : NIL


AE CONTRACTOR :
SAM INDIABUILTWELL Pvt.
C14 C22 C15 C16 C17 C18 Ltd.
IT IS CERTIFIED THAT DETAILED DRAWING PREPARED IS COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT WITH MEGA AND
CONTRACTOR OWNS FULL RESPONSIBILITY OF QUALITY CONTROL, CHECKING AND VERIFICATION OF ACCURACY, CORRECTNESS,
COMPLETENESS, INTEGRATION, INTERFACING WITH OTHER DESIGN DISCIPLINES & CONTRACTORS AND FULL COMPLIANCE OF EMPLOYER
& CONTRACT REQUIREMENT PROVISIONS AND STANDARD, SPECIFICATIONS, SAFETY AND STATUTORY RULES & REGULATIONS
APPLICABLE. IT IS CERTIFIED THAT, THIS DRAWING HAS NO EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY.

A1 A2 A3 A4 A5 A6 A7
5 6 7 8 9 INTERFACE MANAGER

CHECKED BY
ARCHITECT

CHECKED BY
STRUCTURE ENGINEER

REVIEWED BY
DY PROJECT MANGER

APPROVED BY
PROJECT MANAGER

ISSUED BY

INDEPENDENT LEAD

PLAN AT ENTRY EXIT PLINTH LEVEL DESIGN CHECKER (I-LDC) :


CONSULTING
ENGINEERS

IT IS CERTIFIED THAT DETAILED DRAWING PREPARED BY "DDC" HAS BEEN INDEPENDENTLY ANALYZED & DESIGNED FOR CHECKING BY
"I-LDC" & IT IS COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT REQUIREMENTS AND I-LDC OWNS FULL RESPONSIBILITY FOR
ACCURACY OF DESIGN AS PER ODS & OCS, ADEQUACY & MEETING FUNCTIONAL, PERFORMANCE AND OPERATIONAL REQUIREMENTS
NOTES :- INCLUDING CONSIDERATION FOR INTERFACE REQUIREMENTS WITH OTHER CONCERNED DESIGNERS & CONTRACTORS AND COMPLIANCE
TO STANDARD, SPECIFICATIONS, SAFETY AND STATUTORY RULES & REGULATIONS APPLICABLE. IT IS CERTIFIED THAT, THIS DRAWING
1. ALL DIMENSIONS ARE IN MILLIMETERS, ELEVATIONS AND COORDINATES IN METERS UNLESS HAS NO EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY.IT IS CERTIFIED BY I-LDC FOR ONWARD SUBMISSION OF THIS DRAWING BY
OTHERWISE SPECIFIED. CONTRACTOR TO ENGINEER.

2. ALL DIMENSIONS ARE TO BE READ AND NOT MEASURED.


3. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT STRUCTURAL &
ARCHITECTURAL DRAWINGS, INTERFACE MANAGER ARCHITECT STRUCTURE ENGINEER DY PROJECT MANGER PROJECT MANAGER
4. ANY DISCREPANCIES MUST BE BROUGHT TO THE NOTICE OF THE CONSULTANT, INDEPENDENTLY INDEPENDENTLY INDEPENDENTLY INDEPENDENTLY
ISSUED BY
5. CLEAR COVER TO OUTERMOST REINFORCEMENT SHOULD BE AS SPECIFIED IN RESPECTIVE CHECKED BY CHECKED BY REVIEWED BY APPROVED BY
REBAR DETAIL DRAWINGS.
DETAILED DESIGN CONSULTANT (DDC) :
6. MINIMUM LAP LENGTH SHALL BE AS PER GENERAL NOTES DRAWINGS. TÜMAŞ

7. CONCRETE & REINFORCEMENT AS INDICATED IN RESPECTIVE SCHEDULES. India

PROJECT NAME : DESIGN, CONSTRUCTION AND COMPLETION OF UNDERGROUND STATIONS AND TUNNEL INCLUDING FINISHES
FROM KAPODRA RAMP TO SURAT RAILWAY STATION FROM CHAINAGE 3700M TO CHAINAGE 7160.6M, COMPRISING TWIN BORED
UNDERGROUND TUNNEL BETWEEN NORTHERN RAMP AND SURAT RAILWAY METRO STATION, ALL CUT AND COVER PORTION
INCLUDING THREE UNDERGROUND STATIONS VIZ. KAPODRA, LABHESHWAR CHOWK AND CENTRAL WAREHOUSE WITH ENTRY/EXITS
NOTES :- & CONNECTING SUBWAY BY BOX PUSHING METHOD AND A PORTION OF NATM AND LAUNCHING AND RECEIVING CHAMBERS OF TBM
FOR SURAT METRO RAIL PROJECT, PHASE-I
1. STRUCTURAL FRAMING DRAWINGS ARE FOR STRUCTURAL ELEMENT SIZES (D-WALL, CONTRACT ID : GMRC/CONS/UG-01/PKG-CS2/PH-01/2020
COLUMNS, RC WALL,BEAMS, SLAB, STAIRCASE). SETTING OUT DIMENSIONS ARE INDICATIVE, DRAWING
MUST BE READ IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS. ANY DISCREPANCIES NAME/TITLE : FRAMING PLAN AT PLINTH LEVEL OF ANCILLARY BUILDING SIZE : A1

SHOULD BE VERIFIED BY DESIGN TEAM PRIOR TO EXECUTION. LOCATION : KAPODRA STATION SHEET NO. : --
2. STRUCTURAL FRAMING DRAWINGS ARE FOR STRUCTURAL ELEMENT SIZES (LIFT PIT, REV. NO. : R-0
DRAWING NO. : D-EUGP1-TPT-F-KPS-CST-FWG-1103
ESCALATOR PIT, LIFTING HOOK) SETTING OUT DIMENSIONS ARE INDICATIVE, MUST BE READ IN
SCALE : 1/100 DATE : 08-03-2023
CONJUNCTION WITH ARCHITECTURAL DRAWINGS. ANY DISCREPANCIES SHOULD BE VERIFIED
IT IS CERTIFIED THAT DETAILED DRAWING PREPARED IS COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT WITH MEGA AND DDC
BY DESIGN TEAM PRIOR TO EXECUTION. OWNS FULL RESPONSIBILITY FOR DESIGN AS PER ODS & OCS, ADEQUACY & MEETING FUNCTIONAL, PERFORMANCE AND OPERATIONAL
REQUIREMENTS INCLUDING CONSIDERATION FOR INTERFACE REQUIREMENTS WITH OTHER CONCERNED DESIGNERS & CONTRACTORS
3. STRUCTURAL FRAMING DRAWINGS ARE FOR STRUCTURAL ELEMENT SIZES (FLOOR OPENINGS) AND COMPLIANCE TO STANDARD, SPECIFICATIONS, SAFETY AND STATUTORY RULES & REGULATIONS APPLICABLE. IT IS CERTIFIED THAT,
SETTING OUT DIMENSIONS ARE INDICATIVE, MUST BE READ IN CONJUNCTION WITH THIS DRAWING HAS NO EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY. THIS DRAWING WITH RELEVANT ANALYSIS & DESIGN HAS
BEEN PRODUCED BY DDC AND INDEPENDENTLY CHECKED BY I-LDC & CONTRACTOR BEFORE SUBMISSION TO ENGINEER.
ARCHITECTURAL DRAWINGS. ANY DISCREPANCIES SHOULD BE VERIFIED BY DESIGN TEAM
PRIOR TO EXECUTION. 08-03-2023 08-03-2023 08-03-2023

(SGAWINGS) (BAHADIR AKGUL) (ATUL SACHAN)


CHECKED BY
INTERFACE ENGINEER DESIGNED BY CHECKED BY APPROVED BY ISSUED BY
SENIOR ENGINEER STATIONS DESIGN LEAD PROJECT MANAGER