Professional Documents
Culture Documents
Station) to end of Nayaganj station including four underground metro stations (viz. Chunniganj,
Naveen Market, Bada Chauraha and Nayaganj) and ramp including Architectural finishes, E&M,
TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India
Data
a) Water Level
c) Soil Parameters
Average submerged density of soil= 10.00 KN/m3 (for 2.5m to 21m soil)
Average angle of internal friction= 28.00 DEGREE
Avg coefficent of earth at rest ko= 0.52
Avg cohesion C = 0 KN/m2
d) Structure Geometry
h1= 21.0 m
15.975
m
1 m
CL= 115.540 0.700 m
1 m
PCC FILL=0.5m
BBS1= 107.125
m BBS2= 105.915
h2= 4.500
m BDL = 102.625 m
Uplift Force
Wall Friction
p1 = 2300.88 kN
δ1 = 2ᶲ/3
= 18.667 °
1.b)Horizontal force on one side wall on passive side of soil face
p2 = gsub*[h2^2/2]
p2 = 101.25 kN
δ2 = ᶲ/2
= 14.000 °
KNPCC-05-Design and Construction of Tunnel from start of elevated ramp (after Motijheel
Station) to end of Nayaganj station including four underground metro stations (viz. Chunniganj,
Naveen Market, Bada Chauraha and Nayaganj) and ramp including Architectural finishes, E&M,
TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India
Effective uplift resistance from both the side walls after FOS = 2
F = 417.33 KN/m
Structure Weight
Calculation is for 1m longitudinal length for realistic approach
3) Track Bed:
Track slab width = 4.000 m
Depth of track slab = 0.650 m
volume = 2.600 m3
weight = 65.000 KN
NO. of tracks = 2.000
Total weight = 130.000 KN
3) Concourse Slab:
volume = 14.700 m3
Total weight = 367.50 KN
Backfill
Weight = [(GL-RTL)*WIDTH]*gsat
Summary