PROJECT:
GANJAM DISTRICT (BERHAMPUR DIVISION) INCLUDING
FIVE YEARS OPERATION & MAINTENANCE UNDER ONE
PACKAGE. KEC-RWSS-CHH-RAP-DOC-008 7-Sep-23
+22.50
Height of Soil considered for design of wall from FGL to Top of Footing
+ 22.500
3.5
FGL + 22.00
GWTL + 0.00
+ 19.00
5.00 30.00 Wall Bottom Lvl 30.00
= 261 mm
Hence ok
Alternate bar = mm
Clear cover = 30 mm
Hence ok
Hence ok
Hence ok
Hence ok
4.10 m
A
The slab is to be designed as Contineous slab supported between beams.
Short Span of Cover slab = 4.00 m
Long Span of Cover slab = 4.10 m
Effective length of the slab 4+145/1000 4.145 m
Live on the Cover slab = 5 kN/m2
Thickness of Cover slab = 175 mm
Floor finishes load on Cover slab= 24*0.075 = 1.8 kN/m2
Self weight of slab= 25*175/1000 = 4.38 kN/m2
(From STAADPRO Results)
Maximum -ve BM acting in the slab (water face ) = Plate : 3065 L/c :210 1.0(DL+LL+FL+EQ(-X)) , My +ve 10.330 kN-m/m
Maximum +ve BM acting in the slab (Outer face ) = Plate : 2350 L/c :234 1.0(DL+LL+EQ(+X)) , My -ve 8.180 kN-m/m
Maximum -ve BM acting in the slab (water face ) = Plate : 3073 L/c :211 1.0(DL+LL+FL+EQ(+Z)) , Mx +ve 9.990 kN-m/m
Maximum +ve BM acting in the slab (Outer face ) = Plate : 2853 L/c :211 1.0(DL+LL+FL+EQ(+Z)) , Mx -ve 6.600 kN-m/m
Maximum Tension in slab Plate : L/c : , Sx +ve 0.140 N/mm2
Tension force in Base slab 0.14*175 = 24.5 kN
Grade of concrete (M30 grade) = 30 N/mm2
Grade of steel ( Fe500 grade ) = 500 N/mm2
Permissible tensile stress in concrete for M30 = 2 N/mm2
Permissible stress in steel on water face σst = 130 N/mm2
Permissible stress in steel on Soil face σst = 230 N/mm2
For Water face k = (280/3)/((280/3)+130 0.418
For Water face j= 1-k/3 = 0.861
For Soil face k= (280/3)/((280/3)+230 0.289
For Soil face j= 1-k/3 = 0.904
Thickness of wall required at the base of section =
= SQRT(6x10.33x10^6/(2X1000)) = = 141 mm
Provided Thickness of Slab = 175 mm
Hence ok
Area of steel required (X direction) @ Top
Diameter of the bar provided = 10 mm
Clear cover = 25 mm
Effective depth of the slab = 175-25-10/2= 145 mm
Ast req. = M/ σst *j*d
Ast req. = 331.4 mm2/m
Axial tension in the slab 24.50 kN
Area of steel required for tensile force= 24.5x1000/230/2= 53 mm2/m
Total Area of steel required = 331.44+53.26 = 384.70 mm2/m
Minimum percentage of steel required = 0.36 %
Minimum Area of steel required 0.36*10*175/2 315 mm2/m
Min.Area of steel to be considered each direction at a face 315 mm2/m
Reinforcement to be considered = 384.70 mm2/m
Provide 10 mm dia tor steel at the base at a spacing = = 200 mm c/c
Area of steel provided = = 392.7 mm2/m
percentage of steel provided at the base = 0.27 %
Hence provide 10mm dia bar at a spacing of 200c/c. Hence ok
Area of steel required (X direction) @ Bottom
Diameter of the bar provided = 10 mm
Clear cover = 30 mm
Effective depth of the slab 175-30-10/2= 140 mm
Ast req. = M/ σst *j*d
Ast req. = 421.33 mm2/m
Axial tension in the slab = 24.50 kN
Area of steel required for tensile force= 24.5x1000/130/2= 94 mm2/m
Total Area of steel required = 421.33+94.23 = 515.56 mm2/m
Min.Area of steel to be considered each direction at a face= 315 mm2/m
Reinforcement to be considered = = 515.56 mm2/m
Provide 10 mm dia tor steel at the base at a spacing = 150 mm c/c
Area of steel provided = = 523.6 mm2/m
percentage of steel provided at the base = = 0.37 %
Hence ok