EXECUTION OF 2 NOS. INDIVIDUAL MEGA PWS TO DOCUMENT NO.

DATE
PROJECT:
GANJAM DISTRICT (BERHAMPUR DIVISION) INCLUDING
FIVE YEARS OPERATION & MAINTENANCE UNDER ONE
PACKAGE. KEC-RWSS-CHH-RAP-DOC-008 7-Sep-23

DESIGNED CHECKED REV


STRUCTURE:
DESIGN OF FILTER HOUSE BUILDING & WASH WATER
RECOVERY SUMP JB NSS 0

5.22 Design of RC wall - W10: 22.20 x 3.850

+22.50

Wall Panel marked W10 :-

The following are the dimensions of wall panel W10 W7 + 19.000

Length of the wall = 22.20 m + 18.650

Height of the wall = 3.850 m

Height of Soil considered for design of wall from FGL to Top of Footing

+ 22.500

3.5

FGL + 22.00

GWTL + 0.00

+ 19.00
5.00 30.00 Wall Bottom Lvl 30.00

Water pressure on wall from inside = 30.00 kN/m2

Soil pressure on wall from out side = 30.00 kN/m2

Surcharge on wall (10)*1/2= 5.00 kN/m2

This wall is analysed using Staad results are as below:

Maximum +ve BM acting in the wall (Water face ) = 22.990 kN-m/m

Plate : 1191 L/c :210 1.0(DL+LL+FL+EQ(-X)) , My +ve

Maximum -ve BM acting in the wall (Outer face ) = 30.420 kN-m/m

Plate : 1652 L/c :234 1.0(DL+LL+EQ(+X)) , My -ve

Maximum +ve BM acting in the wall (Water face ) = 11.060 kN-m/m

Plate : 1412 L/c :211 1.0(DL+LL+FL+EQ(+Z)) , Mx +ve

Maximum -ve BM acting in the wall (Outer face ) = 14.920 kN-m/m

FILTER HOUSE BUILDING Page : 158


EXECUTION OF 2 NOS. INDIVIDUAL MEGA PWS TO DOCUMENT NO. DATE
PROJECT:
GANJAM DISTRICT (BERHAMPUR DIVISION) INCLUDING
FIVE YEARS OPERATION & MAINTENANCE UNDER ONE
PACKAGE. KEC-RWSS-CHH-RAP-DOC-008 7-Sep-23

DESIGNED CHECKED REV


STRUCTURE:
DESIGN OF FILTER HOUSE BUILDING & WASH WATER
RECOVERY SUMP JB NSS 0

Plate : 1463 L/c :228 1.0(DL+EQ(+Z)) , Mx -ve

Maximum Tension in slab 0.3 N/mm2

Plate : 1671 L/c :228 1.0(DL+EQ(+Z)) , Sx +ve

Tension force in Wall 0.3*300 = 90 kN

Grade of concrete (M30 grade) = 30 N/mm2

Grade of steel ( Fe500 grade ) = 500 N/mm2

Permissible tensile stress in concrete for M30 σbc = 2 2.67 N/mm2

Permissible stress in steel on water face σst = 130 173.33 N/mm2

Permissible stress in steel on Soil face σst = 230 306.67 N/mm2

For Water face k = (280/3)/((280/3)+130 0.418 0.350

For Water face j = 1-k/3 0.904 0.883

For Soil face k = 0/3)/((280/3)+230 0.289 0.233

For Soil face j = 1-k/3 0.904 0.922

Q= 1/2*σbc *j*k = 1.076

Depth required = Sqrt( M/ Q b)

= 261 mm

Provide wall thickness at bottom = 300 mm

Thickness to be provided at top = 300 mm

Average thickness of the wall = 300 mm

Hence ok

Area of Vertical steel required on Water face:

Diameter of bar provided = 12 mm

Alternate bar = mm

Clear cover = 30 mm

Effective depth of wall = 300-30-12/2 = 264 mm

Ast req. = M/ σst *j*d

Ast req. = 568.77 mm2/m

Minimum percentage of steel required = 0.36 %

FILTER HOUSE BUILDING Page : 159


EXECUTION OF 2 NOS. INDIVIDUAL MEGA PWS TO DOCUMENT NO. DATE
PROJECT:
GANJAM DISTRICT (BERHAMPUR DIVISION) INCLUDING
FIVE YEARS OPERATION & MAINTENANCE UNDER ONE
PACKAGE. KEC-RWSS-CHH-RAP-DOC-008 7-Sep-23

DESIGNED CHECKED REV


STRUCTURE:
DESIGN OF FILTER HOUSE BUILDING & WASH WATER
RECOVERY SUMP JB NSS 0

Minimum Area of steel required = 0.36*10*300/2 540 mm2/m

Area of stee required in each face in each direction 540 mm2/m

Reinforcement to be considered = 568.8 mm2/m

Provide 12 , mm dia tor steel at a spacing = = 175 mm c/c

Area of steel provided = 645.94 mm2/m

percentage of steel provided at the base = 0.24 %

Hence ok

Area of Vertical steel required on Outer face :

Diameter of bar provided = 12 mm

Effective depth of wall 300-30-12/2 = 264 mm

Ast req. = M/ σst *j*d

Ast req. = 407.43 mm2/m

Minimum percentage of steel required = 0.36 %

Minimum Area of steel required on each direction 540 mm2/m

Reinforcement to be considered = 540.0 mm2/m

Provide 12 mm dia tor steel at a spacing = = 175 mm c/c

Area of steel provided = 645.94 mm2/m

percentage of steel provided = 0.25 %

Hence ok

Horizontal Steel Required on Water face

Diameter of bar provided = 12 mm

Effective depth of wall 300-30-12-12/2 = 252 mm

Ast req. = M/ σst *j*d

Ast req. = 286.65 mm2/m

Axial tension in wall = = 90.00 kN

Area of steel required for tensile force= 90x1000/306.67/2= 147 mm2/m

Total Area of steel required = 286.65+146.74 = 433 mm2/m

Minimum percentage of steel required = 0.36 %

FILTER HOUSE BUILDING Page : 160


EXECUTION OF 2 NOS. INDIVIDUAL MEGA PWS TO DOCUMENT NO. DATE
PROJECT:
GANJAM DISTRICT (BERHAMPUR DIVISION) INCLUDING
FIVE YEARS OPERATION & MAINTENANCE UNDER ONE
PACKAGE. KEC-RWSS-CHH-RAP-DOC-008 7-Sep-23

DESIGNED CHECKED REV


STRUCTURE:
DESIGN OF FILTER HOUSE BUILDING & WASH WATER
RECOVERY SUMP JB NSS 0

Minimum Area of steel required 0.35*10*300/2 540 mm2/m

Reinforcement to be considered = 540 mm2/m

Provide 12 mm dia tor steel at a spacing = = 200 mm c/c

Area of steel provided = 565.2 mm2/m

percentage of steel provided = 0.22 %

Hence ok

Horizontal steel required on Gallery face

Diameter of bar provided = 12 mm

Effective depth of wall = 300-30-12-12/2 = 252 mm

Ast req. = M/ σst *j*d

Ast req. = 209.34 mm2/m

Axial tension in wall = ( refer wall 7 ) = 90.00 kN

Area of steel required for tensile force= 90x1000/306.67/2= 147 mm2/m

Total Area of steel required = 209.34+146.74 = 356 mm2/m

Minimum percentage of steel required = 0.36 %

Minimum Area of steel required on each face = 540 mm2/m

Reinforcement to be considered = 540.0 mm2/m

Provide 12 mm dia tor steel at a spacing = = 200 mm c/c

Area of steel provided = 565.2 mm2/m

Percentage of steel provided = 0.224 %

Hence ok

FILTER HOUSE BUILDING Page : 161


EXECUTION OF 2 NOS. INDIVIDUAL MEGA PWS TO DOCUMENT NO. DATE
PROJECT:
GANJAM DISTRICT (BERHAMPUR DIVISION) INCLUDING
FIVE YEARS OPERATION & MAINTENANCE UNDER ONE
PACKAGE. KEC-RWSS-CHH-RAP-DOC-008 7-Sep-23

DESIGNED CHECKED REV


STRUCTURE:
DESIGN OF FILTER HOUSE BUILDING & WASH WATER
RECOVERY SUMP JB NSS 0

FILTER HOUSE BUILDING Page : 162


EXECUTION OF 2 NOS. INDIVIDUAL MEGA PWS TO DOCUMENT NO. DATE
PROJECT:
GANJAM DISTRICT (BERHAMPUR DIVISION) INCLUDING
FIVE YEARS OPERATION & MAINTENANCE UNDER ONE
PACKAGE. KEC-RWSS-CHH-RAP-DOC-008 7-Sep-23

DESIGNED CHECKED REV


STRUCTURE:
DESIGN OF FILTER HOUSE BUILDING & WASH WATER
RECOVERY SUMP
JB NSS 0

5.23 Design of Cover slab for Wash Water Sump :-


DESIGN OF COVER SLAB:
A

4.10 m
A
The slab is to be designed as Contineous slab supported between beams.
Short Span of Cover slab = 4.00 m
Long Span of Cover slab = 4.10 m
Effective length of the slab 4+145/1000 4.145 m
Live on the Cover slab = 5 kN/m2
Thickness of Cover slab = 175 mm
Floor finishes load on Cover slab= 24*0.075 = 1.8 kN/m2
Self weight of slab= 25*175/1000 = 4.38 kN/m2
(From STAADPRO Results)
Maximum -ve BM acting in the slab (water face ) = Plate : 3065 L/c :210 1.0(DL+LL+FL+EQ(-X)) , My +ve 10.330 kN-m/m
Maximum +ve BM acting in the slab (Outer face ) = Plate : 2350 L/c :234 1.0(DL+LL+EQ(+X)) , My -ve 8.180 kN-m/m
Maximum -ve BM acting in the slab (water face ) = Plate : 3073 L/c :211 1.0(DL+LL+FL+EQ(+Z)) , Mx +ve 9.990 kN-m/m
Maximum +ve BM acting in the slab (Outer face ) = Plate : 2853 L/c :211 1.0(DL+LL+FL+EQ(+Z)) , Mx -ve 6.600 kN-m/m
Maximum Tension in slab Plate : L/c : , Sx +ve 0.140 N/mm2
Tension force in Base slab 0.14*175 = 24.5 kN
Grade of concrete (M30 grade) = 30 N/mm2
Grade of steel ( Fe500 grade ) = 500 N/mm2
Permissible tensile stress in concrete for M30 = 2 N/mm2
Permissible stress in steel on water face σst = 130 N/mm2
Permissible stress in steel on Soil face σst = 230 N/mm2
For Water face k = (280/3)/((280/3)+130 0.418
For Water face j= 1-k/3 = 0.861
For Soil face k= (280/3)/((280/3)+230 0.289
For Soil face j= 1-k/3 = 0.904
Thickness of wall required at the base of section =
= SQRT(6x10.33x10^6/(2X1000)) = = 141 mm
Provided Thickness of Slab = 175 mm

FILTER HOUSE BUILDING Page : 163


EXECUTION OF 2 NOS. INDIVIDUAL MEGA PWS TO DOCUMENT NO. DATE
PROJECT:
GANJAM DISTRICT (BERHAMPUR DIVISION) INCLUDING
FIVE YEARS OPERATION & MAINTENANCE UNDER ONE
PACKAGE. KEC-RWSS-CHH-RAP-DOC-008 7-Sep-23

DESIGNED CHECKED REV


STRUCTURE:
DESIGN OF FILTER HOUSE BUILDING & WASH WATER
RECOVERY SUMP
JB NSS 0

Hence ok
Area of steel required (X direction) @ Top
Diameter of the bar provided = 10 mm
Clear cover = 25 mm
Effective depth of the slab = 175-25-10/2= 145 mm
Ast req. = M/ σst *j*d
Ast req. = 331.4 mm2/m
Axial tension in the slab 24.50 kN
Area of steel required for tensile force= 24.5x1000/230/2= 53 mm2/m
Total Area of steel required = 331.44+53.26 = 384.70 mm2/m
Minimum percentage of steel required = 0.36 %
Minimum Area of steel required 0.36*10*175/2 315 mm2/m
Min.Area of steel to be considered each direction at a face 315 mm2/m
Reinforcement to be considered = 384.70 mm2/m
Provide 10 mm dia tor steel at the base at a spacing = = 200 mm c/c
Area of steel provided = = 392.7 mm2/m
percentage of steel provided at the base = 0.27 %
Hence provide 10mm dia bar at a spacing of 200c/c. Hence ok
Area of steel required (X direction) @ Bottom
Diameter of the bar provided = 10 mm
Clear cover = 30 mm
Effective depth of the slab 175-30-10/2= 140 mm
Ast req. = M/ σst *j*d
Ast req. = 421.33 mm2/m
Axial tension in the slab = 24.50 kN
Area of steel required for tensile force= 24.5x1000/130/2= 94 mm2/m
Total Area of steel required = 421.33+94.23 = 515.56 mm2/m
Min.Area of steel to be considered each direction at a face= 315 mm2/m
Reinforcement to be considered = = 515.56 mm2/m
Provide 10 mm dia tor steel at the base at a spacing = 150 mm c/c
Area of steel provided = = 523.6 mm2/m
percentage of steel provided at the base = = 0.37 %
Hence ok

FILTER HOUSE BUILDING Page : 164


EXECUTION OF 2 NOS. INDIVIDUAL MEGA PWS TO DOCUMENT NO. DATE
PROJECT:
GANJAM DISTRICT (BERHAMPUR DIVISION) INCLUDING
FIVE YEARS OPERATION & MAINTENANCE UNDER ONE
PACKAGE. KEC-RWSS-CHH-RAP-DOC-008 7-Sep-23

DESIGNED CHECKED REV


STRUCTURE:
DESIGN OF FILTER HOUSE BUILDING & WASH WATER
RECOVERY SUMP
JB NSS 0

Area of steel required (Y direction) @ Top


Diameter of the bar provided = 10 mm
Clear cover = 30 mm
Effective depth of the slab = 175-30-10-10/2= (water side) 130 mm
Ast req. = M/ σst *j*d
Ast req. = 382.3 mm2/m
Min.Area of steel to be considered each direction at a face= 315 mm2/m
Reinforcement to be considered = 382.3 mm2/m
Provide 10 mm dia tor steel at the base at a spacing = 200 mm c/c
Area of steel provided = 392.7 mm2/m
percentage of steel provided at the base = 0.3 %
Hence ok
Area of steel required (Y direction) @ Bottom
Diameter of the bar provided = 10 mm
Clear cover = 30 mm
Effective depth of the slab = 175-30-10/2= 140 mm
Ast req. = M/ σst *j*d
Ast req. = 522.19 mm2/m
Min.Area of steel to be considered each direction at a face= 315 mm2/m
Reinforcement to be considered = 522.2 mm2/m
Provide 10 mm dia tor steel at the base at a spacing = 150 mm c/c
Area of steel provided = 523.6 mm2/m
percentage of steel provided at the base = 0.37 %
Hence ok
10 dia @200c/c (other direction steel)
10 dia @200c/c (main Steel)
175

10 dia @150c/c (main steel) 10 dia @150c/c (other direction steel)


Reinforcement Details - Cover slab

FILTER HOUSE BUILDING Page : 165


EXECUTION OF 2 NOS. INDIVIDUAL MEGA PWS TO DOCUMENT NO. DATE
PROJECT:
GANJAM DISTRICT (BERHAMPUR DIVISION) INCLUDING
FIVE YEARS OPERATION & MAINTENANCE UNDER ONE
PACKAGE. KEC-RWSS-CHH-RAP-DOC-008 7-Sep-23

DESIGNED CHECKED REV


STRUCTURE:
DESIGN OF FILTER HOUSE BUILDING & WASH WATER
RECOVERY SUMP
JB NSS 0

FILTER HOUSE BUILDING Page : 166