1 2 3 4 5 6 8 9 D* 10
Material- Identification and B visual 100% If IS:8500 grade steel is used,all Tested steel is to be supplied by
marking structural steel plates and sections contractor, and painted for identification .
shall be painted with emulsion Any rest piece / offcuts shall be similarly
paint by making a conspicuous marked with red colour for steels
band of 40 mm width @ 2 m c/c in conforming to IS:8500 for identification at
following colours for identification:- a later date . Unpainted steel pieces shall
IS:8500- red colour be treated as those confirming to IS:2062
Visual Examination of raw B Visual 100% Free from surface defects contractor to ensure steel confirms to
material specification requirement before issue.
1.01 FIT UP
1.01.00 Marking and Cutting B Visual & 100% Approved Drawing Site Register In case the material is supplied
Measurement byContractor, correlated MTC shall be
verified. In the event of non submission of
MTC, sample shall be collected and
tested for physical and metallurgical
properties.
1.01.01 Ensure Proper fit up before Measure B Measurement 100% Drg. & JPL tech. Specification Log Book/ Proper identification mark to be put. If
welding ment dimensional Checking as per Site Register laminations are found during cutting of the
tape Technical Specs. material same shall not be used.
1.01.02 Check that the gap is minimum -do- B -do- 100% -do- -do-
for all fillet welds
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation.
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
1.01.03 Ensure that the butt weld joints -do- B -do- 100% -do- -do-
are properly aligned and the
offset does not exceed 10% of the
thickness of the thinner part of the
joint maximum
1.02 Preheating
1.02.01 Ensure pre-heating is carried out Thermal B Visual 100% JPL Tech. Specs. -do-
wherever applicable Chalk
1.02.02 Ensure that the preheating -do- B Measurement 100% -do- -do-
temperature is uniform prior to
the start of welding
1.02.03 Post Weld Heat Treatment -do- A Time & 100% JPLTech. Specification -do-
(PWHT) Temperature
1.03 Welding
1.03.01 Ensure that the qualified welders -do- A Testing 100% Approved WPS/WPS AWS- Test Report In case pf WPS already available for
and qualified welding procedures D1.1/ASME-IX similar base material and filler, records
are used to all welding. may be submitted for JPL review and
approval.
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
1.03.02 Ensure that the welding -do- A Visual 100% Approved WPS/latest JPL SR WPS to be submitted for JPL approval
consumables used are as per Rationalized list of Electrodes. and low hydrogen electrodes to be used
procedure (WPS) approved by for welding of high/medium tensile steel
JPL.
1.03.03 Ensure proper edge preparation Bevel C Visual 100% Approved Drg. & Tech. Spec. Site Register
wherever applicable Protracto Measurement
r
1.03.05 Check that the temporary do- B Visual 100% -do- -do-
attachment welding are removed
and ground
1.03.06 Check & ensure that the B Visual 100% -do- -do-
overlap/excess weld metal is
removed by grinding and painting
1.03.07 Check the measurement of Measurin B Measurement 100% -do- IS- -do-
parts/structures after welding for g Tape 7215/Approved Drg.
the correctness of dimensions &
and matching, absence of
distortion & alignment.
1.04.01 Carry out RT/UT/LP test Testing A Testing AS PER TECH SPEC Cl. X Yof Part X sub section XYZof Protocol
equipme Tech. Specs.ASME-IX,ASME- Reports
nt V,VIIIDIV.1,AWS D1.1
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
1.04.02 Trial assy/Control Assy of - B Assy. Tech Specification Tech Specification & approved -do-
Structures. Drg
1.04.03 Micro etch on production test Test set A Physical Test coupons for main fillet TR / SR
up
pieces for main filledt weld of welds with minimum one
crane girders columns and butt joint per built up beams,
welds columns and crane girders
weld on production test coupon Bend Test / built up beams / girders after the bend test and the tensile
strength of the weld should not be
less than the parent metal
1.05.01 Ensure that the surface are For details please see
cleaned and painted as specified. clause5.06 and 5.07 of sub
Dry Film Thickness. systems- civil works
1.05.02 Ensure that the following C Visual/ 100% Technical specification & -do-
a) Assembly designation
b) Part number
c) Weight
d) Any other important
identifications.
1.06 Foundation checks
1.06.01 Ensure that availability of - C Visual 100% approved Drg./ Tech. Site Reg.
permanent Bench Mark Specification
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
1.06.02 Ensure the foundation are cast as Measure B Measurement 100% -do- -do-
per requirements ment
Tape
1.06.04 Check the top level of foundation Total B Measurement 100% -do- -do-
pedestal with respect of the works
permanent bench mark. station
1.06.05 Check the center to centre Measurin B -do- 100% -do- -do-
distance of column foundation g tape
pedestals with respect to the
reference axis.
1.06.06 Check the diagonals between -do- B -do- 100% -do- -do-
columns
1.06.07 Check the pitch distance of -do- B -do- 100% -do- -do-
foundation bolts on both axis &
diagonal.
1.07.01 Ensure cleaning of Base Plate & - C Visual 100% -do- -do-
HSFG bolt area
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
1.07.02 Check individual column faces for Measure B Measurement 100% Approved Drg. & Tech. Spec. -do-
identification No. match mark ment
column No. length camber
sweep.
1.07.03 Ensure columns are pre- - B Visual 100% Drg./ Tech. Spec. Site Register
assembled as per match marks
and center line already punched
on the column pieces and
respective splices plates, when
ever applicable.
1. Interchanging of column
pieces and turning of column by
180 degree is not permitted.
1.07.04 Check camber, sweep, match Measure B Measurement 100% Tech. Specs. IS:7215 & IS:12843 -do-
mark and total length after trial ment
assembly of columns. Tape
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
a) Camber Measure B Measurement 100% Tech. Specs & as per Relevant -do-
ment IS
Tape
b) Sweep Physical
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
e) End Plates are aligned and in C Visual 100% JPL tech. Specs
level on both ends.
b) Qualified welder are engaged A Verification of 100% ASME (Sec-IX) / Approved WPS -do-
and qualified procedures are record if
employed already
qualified by
JPL
c) Recommended welding A Physical 100% -do- -do- Low hydrogen electrodes to be used for
consumables and methods are welding of High/ Medium tensile steel .
employed.
1.09 Ensure foundation bolts are free - B Visual 100% -do- -do-
from damages and foundation
bolt pocket are free from debris
and foreign material.
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction withJPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
1.10 Ensure the level of bottom of B Visual 100% Approved drg -do-
Base Plate
1.12 Ensure the centre line of base - C Physical 100% -do- -do-
plate coincides with foundation
pedestal axis (both in X and Y
axis)
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
1.20 Check verticality to Ist and 2nd Plumb B -do- 100% Approved Drg./Tech. Specs -do-
pieces after the erection of bob/
connection pieces Total
1.21 Check the verticality of total -do- B -do- 100% -do- -do-
erected column
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
d) Tightness of bolts B Torque 100% Approved Drg. Tech. Specs Site Register/
Measurement Log Book
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
a) Ensure qualified welders are A Verification of 100% ASME Section - IX / Approved Site Register
engaged & qualified procedure record of WPS
are employed already
qualified by
JPL
b) Ensure recommended welding A Physical 100% -do- -do- Low hydrogen electrodes to be used for
consumables and methods are welding of High/ Medium tensile steel .
employed
c) Ensure recommended NDE NDE Test A Visual/Testing AS PER TECH SPEC Approved Drawing/JPL Tech. -do-
checks are carried out Equipme Spec.
nt
1.25 ELECTROFORGED
GRATINGS
Material A Review of Once per lot Grade'A' IS:2062, tech Mfr TC
Mfr.TC specifications
Finishing B Visual Random Free from warps twists or any SR manufacturing quality plan to be
defects submitted
Erection , alignment and B Physical Random tech specifications& Relevant IS -do-
Installation
Painting/surface preparation - A Review of Once per lot Tech specifications Mfr TC
Mfr.TC
/Approved QP
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
1.26 GALVANISED STEEL
HAND RAILS
Material A Physical Once per lot Grade IS:2062, Technical SR/LB Galvanising shall be carried out as per
specifications,Galvanised as per the technical specifications.
IS 4736
DPT As A Physical Random AWS D1.1 / Technical SR/LB
required specifications
1.27 CW LINERS
A) MATERIALS
a) Steel Plates for liners and flanges
B) FABRICATION
I) Cut to size by gas and Steel Tape - C Visual 100% As per approved drawing LB
edge preparation
ii) Prebend of Plate Template C By template 100% As per approved drawing SR
iii) Roll to required size - C By template 100% As per approved drawing -
iv) Tack weld and provision of - B Measurement 100% As per approved drawing SR
internal bracings to keep in of Dia
proper shape
C) PAINTING
For embedded CW pipe
a Surface Finish & Paint
a.1 Surface preparation by External cleaning As reqd. B Visual 100% JPL Tech Specs Inspn Report
wire brush
a.2 Painting with primer coat Elcometer As reqd. B Visual 100% JPL Tech Specs Inspn Report Uniform thickness & type of paint and
of, Chlrinated rubber shade
based zinc chromate
primer
a.3 Coal tar Protection tape ROUTINE TESTS:-Holiday As reqd. B Visual & Random JPL Tech Specs/ IS:15337 Inspn Report For uncased pipes , for other overground
tester,Adhesion Test,Direct piping painting shall be as specified in the
impact test, Corrosion resistance technical specification.
test
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Legend to be used: Class # : A = Critical, B=Major, C=Minor; SR,TR,MfrTC, LB
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0
ANNEXURE-III
1 2 3 4 5 6 8 9 D* 10
D) Welding ( Shop / Field
welds)
1) Approval of welding - A Visual and 100% ASME sec.IX/A Approved WPS Test Report
procedures/specification and destructive as
subsequent welding procedure per ASME-IX
qualification
2) Weders Qualification test - A Visual and 100% ASME sec.IX/A Approved WPS Test Report
destructive as
per ASME-IX
3) Check to fit up gap By Filler B 100% As per approved drawing /IS-3589 Shop
gauge Register
4) Check of surface defects B 100% Free from surface defects Shop
Register
E) Inspection of welds/
shop and field erection
welds
DPT on root run and after back DPT Kit B NDT 100% IS-3658 No Line and round Shop
gauging / grindng of butt welds indication and no crack Register
G) Hydro testing
Leakage tightness Pumps A Leakage tests 100% JPL tech secification SR For liners fabricated at shop and site
PR.
LEGEND: D* Records, indentified with “Tick” (√) shall be essentially included by supplier in QA documentation. DOC. NO.:
Legend to be used: Class # : A = Critical, B=Major, C=Minor; SR,TR,MfrTC, LB
Manufacture Main-supplier ‘A’ shall be witnessed by JPL FQA, ‘B’ shall be witnessed by JPL erection / construction deptt. and ‘C’ shall be witnessed by
r/ Sub- erection supplier (A & B check shall be JPL CHP stage) ;SR = Site Register , TR= Test Report,MfrTC = Manufacturer's
supplier Test Certificate , duly correlated , LB= Log book
Signature This document shall be read in conjunction with JPL Tech. Specifications, BOQ, Drawings . REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.-QS-01-QAI-P-09/F-2-R0