℄ OF TRACK

+12.583 m (Average Road


ROAD
Level)

1000 1460
06-SSL-TOP SLAB LEVEL 06-SSL-TOP SLAB LEVEL
+11.123 m +11.123 m

5150
C1-03 S-22 C1-01 C1-02
TUNNEL VENTILATION
FAN ROOM TV SHAFT PLENUM-12 PLENUM-11

05-FFL-CONCOURSE 1 LEVEL Railing as per detail 05-FFL-CONCOURSE 1 LEVEL


+5.123 m +5.123 m
05-SSL-CONCOURSE 1 LEVEL 05-SSL-CONCOURSE 1 LEVEL
750

+4.973 m +4.973 m

ECS PLANT ROOM


5150

SEA LEVEL SEA LEVEL


1200 1650

6390
±0.000 m ±0.000 m
04-FFL-PLATFORM 1 LEVEL 04-FFL-PLATFORM 1 LEVEL
-0.777 m -0.777 m
04-SSL-PLATFORM 1 LEVEL 04-SSL-PLATFORM 1 LEVEL
300

-0.927 m -0.927m
03-TOR-TOP OF RAIL 1 03-TOR-TOP OF RAIL 1
PROPOSED RAIL LEVEL PROPOSED RAIL LEVEL
2040

-1.867m -1.867 m

ORIGINAL RAIL LEVEL 1400 ORIGINAL RAIL LEVEL


1000

-2.607 m -2.607 m
ELE. PLENUM-3

03-SSL-UNDERCROFT LEVEL 1 Railing as per detail 03-SSL-UNDERCROFT LEVEL 1


-3.267 m -3.267 m
5150

02-FFL-CONCOURSE 2 LEVEL 02-FFL-CONCOURSE 2 LEVEL


-9.267 m -9.267 m
02-SSL-CONCOURSE 2 LEVEL 02-SSL-CONCOURSE 2 LEVEL
750

-9.417 m -9.417 m

ASS ROOM ASS ROOM


1200 1650
5050
5150

01-FFL-PLATFORM 2 LEVEL 01-FFL-PLATFORM 2 LEVEL


-15.167 m -15.167 m
01-SSL-PLATFORM 2 LEVEL 01-SSL-PLATFORM 2 LEVEL
1800 300

-15.317 m -15.317m

00-TOR-TOP OF RAIL 2 00-TOR-TOP OF RAIL 2


ORIGINAL RAIL LEVEL ORIGINAL RAIL LEVEL
-16.257 m -16.257 m
1000

00-SSL-UNDERCROFT LEVEL 2 00-SSL-UNDERCROFT LEVEL 2


-17.417 m -17.417 m

CASE B : DRAG THROUGH ON PERMANENT


BASE SLAB