C Fabrication of Footing Reinf. 379.2 kgs D Footing concrete pouring 5.04 m³ E Fabrication of Grade Beam Reinf. 277.68 kgs F Installation of Formworks for Grade beam 60.32 m² G grade beam concrete pouring 5.028 m³ H Disassembling of formworks of Grade beam 66.42 m² I Fabrication of column Reinf. 805.8 kgs J installation of formworks for column 88.2 m² K column concrete pouring 5.67 m³ L Disassembling of formworks of column 88.2 m² M Fabrication of slab rsb 2157.6 kgs N concrete pouring on slab 15.2 m³ O Excavation for septic tank 12 m³ P Laying of chb wall (septic tank) 22.8 m² Q plastering of chb (septic tank) 22.8 m² R concrete pouring for septic tank top cover 0.75 m³ S Fabrication for Roof beam rsb 46.28 kgs T Installation of formworks for roof beam 66.42 m² U conrete pouring of roof beam 4.428 m³ V disassembling of formworks 66.42 m² W laying chb walls 159.34 m² X palstering of chb walls 159.34 m² Y truss fabrication 250 bf Z roof installation 250 bf AA purlins & roofing installation 145.2 m² AB installation of ceilings& framework 121.6 m² AC installation of doors & windows 14.7 m² AD installation of wooden partitions 13.14 m² AE installation of floor tiles 121.6 m² AF paint works 311.88 m² productivity rates duration in days 0.03 MH/m² (manual clearing) 0.8 0.5 mh/m³ (machine) 1.9 0.07 MH/kg 3.3 4 MH/m³ 2.5 0.1 MH/kg 3.5 0.66 MH/m² 5 4 MH/m³ 2.5 0.23 MH/m² 1.9 0.1 MH/kg 10.1 0.66 MH/m² 7.3 4 MH/m³ 2.8 0.23 MH/m² 2.5 0.1 MH/kg 27 4 MH/m³ 7.6 0.5 mh/m³ (machine) 0.8 10 m²/day 2.3 10 m²/day 2.3 4 MH/m³ 0.4 0.1 MH/kg 0.6 0.66 MH/m² 5.5 4 MH/m³ 2.2 0.23 MH/m² 1.9 10 m²/day 15.9 10 m²/day 15.9 0.35 MH/B.F. 10.9 0.8 MH/B.F. 25 0.27 MH/B.F. 4.9 0.36 MH/B.F. 5.5 2.37 MH/m² 4.4 3.44 MH/m² 5.7 0.55 MH/m² 8.4 0.24 MH/m² 9.4